Bhaskara, Adwitya and Saputro, Cahyo Dita and Ismaili, Abul Fida and Agustin, Nia and Alim, Syawaluddin (2022) similarity check THE PREVENTIVE PRIORITY PLAN BASED ON THE CAUSALITY ANALYSIS OF THE CONSTRUCTION ACCIDENT A CASE STUDY: CONSTRUCTION PROJECT OF KENTUNGAN UNDERPASS. Politeknik Negeri Jakarta, Construction and Material Journal.

[img] Text
01-a-bhaskara-et-al-the-preventive-priority-plan-based-on-the-causality-analysis-of-the-const-accident-r3-73-78.pdf

Download (219kB)
Official URL: https://jurnal.pnj.ac.id/index.php/cmj/about

Abstract

case of construction accident that occurred mid-2019 and seized a lot of attention in i surrounding community is a construction accident on i implementation of underpass construction project located in Yogyakarta. i underpass excavation wall in this project collapsed in led two vehicles are fall. Although i types of accidents are almost identical to each project, it does not mean that i same reason causes i accidents. Various methods can carry out efforts to prevent work accidents, one of which is with assessment method and risk analysis using Analytical Hierarchy Process (AHP) which sub indicators are determined using Fault Tree Analysis (FTA). i method conducted with a review in i site by referring to Ministerial Regulation No. 21 year 2019 about i SMKK (Construction Safety Management System) guidelines. This research was conducted to identify i factors and indicators of management of isupervisory consultant and i contractor. iy had a significant influence and contribution to i implementation of i Yogyakarta Kentungan Underpass construction project. i results of this early-stage study served into two outcomes. First, i accuracy of i implementation of construction safety management system based on i assessment of i contractor is 85.938% and i percentage level of accuracy of i supervisory consultant is 97.29%. Both percentages fall into i category of Satisfactory Implementation Assessment because i valuation range is included between 85% to 100%. Second, after analyzing i risk using AHP method, i indicator that is used as a reference priority for i construction safety system of underpass construction projects and has i highest risk level that can causean underpass project construction accident from i contractor's point of view is i sub-indicator of supporting facilities and infrastructure with a risk level value of 0.042 whereas from i supervisory consultant’ perspective is i sub-indicator about to measuring i dimensions of i road building installed in i site with a risk level value of 0.052.

Item Type: Other
Subjects: Z Bibliography. Library Science. Information Resources > ZA Information resources > ZA4050 Electronic information resources
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Mr. Abul Fida
Date Deposited: 16 Jan 2023 02:31
Last Modified: 16 Jan 2023 02:31
URI: http://eprints.uty.ac.id/id/eprint/12178

Actions (login required)

View Item View Item