ANALISIS TATA LETAK FASILITAS PRODUKSI GUNA MEMANGKAS BIAYA MATERIAL HANDLING PADA ARTHANTRA BATU BATA

Rivaldi, Alvin Andrian and Suseno, Suseno (2024) ANALISIS TATA LETAK FASILITAS PRODUKSI GUNA MEMANGKAS BIAYA MATERIAL HANDLING PADA ARTHANTRA BATU BATA. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5200611025 Alvin Andrian Rivaldi-ABSTRAK.pdf

Download (214kB)

Abstract

Abstrak Arthantra Batu Bata merupakan perusahaan produsen batu bata expose serta berlokasi di Klaci III rt 02 rw 12, Klaci III, Margoluwih, Kec. Seyegan, Kabupaten Sleman, Daerah Istimewa Yogyakarta. Salah satu tantangan yang dihadapi oleh Arthantra Batu Bata berhubungan dengan material handling, yang muncul akibat rancangan tata letak pabrik yang kurang efektif antar area produksi dan meningkatnya biaya material handling. Arthantra Batu Bata memiliki total tujuh stasiun kerja dengan jarak antara satu stasiun dan stasiun lain yang berbeda-beda, sehingga total jarak yang ditempuh per hari mencapai 2.308 meter. Lebih lanjut, biaya perusahaan terhadap material handling dalam mendukung proses produksi juga tidak optimal, sehingga mengakibatkan pengeluaran sebanyak Rp237.201,71 per hari. Untuk itu, tugas akhir ini melibatkan evaluasi dan perancangan tata letak baru dengan menggunakan pendekatan Operation Process Chart (OPC), Systematic Layout Planning (SLP), Blocplan, dan Fishbone diagram. Usulan tata letak baru yang diajukan adalah Layout Usulan 1 yang memiliki jarak tempuh 1.601,74 meter, mengurangi sebesar 31% dari tata letak awal dan biaya material handling (OMH) sebesar Rp229.071,08, menghasilkan penghematan sebesar 3% dari tata letak awal. Sebagai solusi material handling, alat yang diusulkan adalah Wheelbarrow 1 roda karena mampu mengangkut batu bata dengan jumlah yang lebih besar serta biaya material handling (OMH) sebesar Rp218.313,08, menghemat sekitar 5% dari usulan tata letak 1. Kata Kunci: Tata Letak Fasilitas, Ongkos Material Handling, Systematic Layout Planning . ABSTRACT Arthantra Batu Bata is a company situated at Klaci III rt 02 rw 12, Klaci III, Margoluwih, Seyegan subdistrict, Sleman Regency, Special Region of Yogyakarta, specializing in the production of exposed bricks. The company faces a challenge related to material handling, stemming from an inefficient factory layout design between production areas and escalating material handling expenses. With a total of seven workstations at varying distances from each other, the daily total distance covered amounts to 2,308 meters. Additionally, the company's material handling costs to support the production process are suboptimal, resulting in daily expenses of IDR 237,201.71. To address this issue, the final project focuses on evaluating and designing a new layout using the Operation Process Chart (OPC), Systematic Layout Planning (SLP), Blocplan, and Fishbone diagram methodologies. The proposed layout, Proposed Layout 1, covers a distance of 1,601.74 meters, reducing 31% from the original layout and material handling costs (OMH) of IDR 229,071.08, leading to savings of 3% from the initial layout. As a material handling solution, the proposed tool is a 1-wheel Wheelbarrow because it is capable of transporting bricks in larger quantities, and material handling costs (OMH) are IDR 218,313.08, saving around 5% from the proposed layout 1. Keywords: Facility Layout, Material Handling Costs, Systematic Layout Planning.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 19 Nov 2024 03:51
Last Modified: 19 Nov 2024 03:51
URI: http://eprints.uty.ac.id/id/eprint/16660

Actions (login required)

View Item View Item