ANALISIS KINERJA MESIN AIR JET LOOM MELALUI PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DAN AGE REPLACEMENT PADA PT PRIMISSIMA

Salsabila, Noviana and Setiafindari, Widya (2024) ANALISIS KINERJA MESIN AIR JET LOOM MELALUI PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DAN AGE REPLACEMENT PADA PT PRIMISSIMA. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5200611028 Noviana Salsabila-ABSTRAK.pdf

Download (229kB)

Abstract

Abstrak Selama periode Januari – Agustus, departemen tenun di PT Primissima mengalami 5 – 20 kali breakdown dengan waktu 10 – 120 menit dalam satu kali perbaikan yang terjadi dalam satu minggu. PT Primissima melakukan perawatan berdasarkan breakdown yang terjadi. Perbaikan yang tidak terencana dapat mengakibatkan suatu proses operasi terhenti karena perbaikan yang mendadak, hal ini menyebabkan proses produksi menjadi tidak optimal. Berdasarkan permasalahan tersebut dilakukan perhitungan efektivitas mesin Air Jet Loom (AJL) dengan memanfaatkan metode Total Productive Maintenance (TPM) melalui parameter OEE (Overall Equipment Effectiveness), dan diusulkan penerapan preventive maintenance dengan metode Age Replacement. Penggunaan metode TPM melalui OEE ini untuk mengetahui perbandingan nilai OEE saat ini dengan nilai OEE standar JIPM, serta mengetahui faktor yang menjadi prioritas perbaikan dan akar penyebab permasalahan. Digunakan pendekatan Age Replacement untuk menentukan waktu perawatan yang tepat dalam implementasi pemeliharaan preventif. Berdasarkan hasil pengolahan data nilai OEE yang diperoleh adalah 78,30% nilai tersebut diketahui bahwa belum mencapai standar JIPM, nilai tersebut diperoleh dari nilai availability 81,70%, nilai performance rate 138,63%, nilai quality rate adalah 69,3%. Faktor yang signifikan menurunkan efektivitas mesin dari six big losses adalah reduced yield losses dengan nilai presentasenya adalah 61,9%. Dari diagram sebab akibat penyebab losses adalah dari faktor mesin, faktor metode, faktor lingkungan, dan faktor manusia. Hasil dari perhitungan dengan metode Age Replacement diketahui komponen paling kritis adalah komponen kamran dan hasil perhitungan interval perawatan yang dapat diterapkan yaitu 11 hari. Kata Kunci: Total Productive Maintenance, Overall Equipment Effectiveness, Age Replacement, Preventive Maintenance ABSTRACT From January to August, the weaving department at PT Primissima encountered between 5 to 20 breakdowns per week, with each repair taking anywhere from 10 to 120 minutes. To address this issue, PT Primissima performs maintenance based on the breakdowns that occur. However, unplanned repairs can disrupt the operational process and lead to suboptimal production. To assess the effectiveness of the Air Jet Loom (AJL) machine, the Total Productive Maintenance (TPM) method was used, specifically through the Overall Equipment Effectiveness (OEE) parameter. Implementing preventive maintenance using the age replacement method was also proposed. The TPM method via OEE helps determine the current OEE value compared to the JIPM standard, as well as identify priority improvements and root causes of problems. The Age Replacement approach is utilized to determine the appropriate maintenance time for preventive measures. After analyzing the data, the OEE value obtained was 78.30%, which falls short of the JIPM standard. This value was derived from an availability value of 81.70%, a performance rate of 138.63%, and a quality rate of 69.3%. The main factor contributing to the machine's reduced effectiveness, among the six major losses, is reduced yield losses, with a percentage value of 61.9%. The cause and effect diagram reveals that the causes of these losses can be attributed to machine factors, method factors, environmental factors, and human factors. The results of calculations using the Age Replacement method show that the most critical component is the camera component, and the results of calculating the maintenance interval that can be applied is 11 days. Keywords: Total Productive Maintenance, Overall Equipment Effectiveness, Age Replacement, Preventive Maintenance

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 28 Nov 2024 01:54
Last Modified: 28 Nov 2024 01:54
URI: http://eprints.uty.ac.id/id/eprint/16689

Actions (login required)

View Item View Item