PENINGKATAN KINERJA PEMELIHARAAN MESIN DIESEL HINO 300 DENGAN METODE TOTAL PRODUCTIVE MAINTENANCE DI PT MITRA PRATAMA MOBILINDO

Wibiatma, Fakhya Rubi and Setiafindari, Widya (2024) PENINGKATAN KINERJA PEMELIHARAAN MESIN DIESEL HINO 300 DENGAN METODE TOTAL PRODUCTIVE MAINTENANCE DI PT MITRA PRATAMA MOBILINDO. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5200611202 Fakhya Rufi Wibiatma-ABSTRAK.pdf

Download (99kB)

Abstract

ABSTRAK Penelitian ini bertujuan untuk mengetahui bagian-bagian kerusakan pada mesin truk dan perawatan mesin truk di PT. Mitra Pratama Mobilindo dengan menggunakan metode Total Productive Maintenance (TPM). Truk yang di teleti yaitu truk Hino euro 3 dan Hino euro 2 di bagian maintenance. Pengumpulan data yang digunakan bersifat data deskriptif kuantitatif pada mesin truk dari bulan Maret 2022 sampai bulan Februari 2024. Maka data dapat diolah menggunakan performance maintenance dengan penerapan Total Productive Maintenance (TPM). Hasil dari penelitian ini disimpulkan bahwa peneliti membahas bagian-bagian kerusakan dan waktu melakukan perbaikan (breakdown) pada mesin truk euro 3 dan euro 2. Dalam meningkatkan kinerja mesin truk dapat meminimalisasi kerusakan mesin truk Penjadwalan perawatan penting. Total Productive Maintenance (TPM) adalah jenis perawatan yang bertujuan untuk menjaga dan meningkatkan kualitas mesin melalui perawatan. Tujuan penjadwalan perawatan adalah untuk memastikan bahwa mesin truk tetap berfungsi dengan baik, mencegah kerusakan, merawat mesin truk yang sudah ada di perusahaan, dan memberikan rekomendasi penjadwalan perawatan. Data yang dikumpulkan meliputi data breakdown, waktu operasional, waktu loading, dan frekuensi breakdown selama dua belas bulan, dari Maret hingga Februari 2024. Dengan memperhitungkan nilai Mean Time Beetwen Failure (MTBF) yang dihasilkan truk euro 3 adalah 525 jam dan truk euro 2 adalah 517 jam, Mean Time to Repair (MTTR) truk euro 3 adalah 4,6, truk euro 3 adalah 5,4 jam, serta Availability truk euro 3 adalah 1,01 jam dan truk euro 2 1.05 jam dengan menggunakan data record truk 2 dibagian maintenance selama 12 bulan Maret 2023 sampai Februari 2024. Kata Kunci: Truk, Total Productive Maintenance (TPM), Mean Time Beetwen Failure (MTBF) dan (MTTR) ABSTRACT This study aims to identify the damaged components of the truck engine and to conduct maintenance on truck engines at PT. Mitra Pratama Mobilindo employs the Total Productive Maintenance (TPM) approach. The maintenance section studied the Hino Euro 3 and Hino Euro 2 trucks. Quantitative descriptive data on truck engines from March 2022 to February 2024 was used for the data collection. The data can then be processed using performance maintenance by applying Total Productive Maintenance (TPM). The study's findings indicated that the researcher examined the components needing repair and the time required to fix Euro 3 and Euro 2 truck engines. Improving truck engine performance can help minimize damage to the engine. Scheduling maintenance is crucial. Total Productive Maintenance (TPM) is a maintenance approach that focuses on maintaining and improving the quality of machinery through regular maintenance. The main objective of the maintenance schedule is to ensure truck engine functioning, prevent potential damage, upkeep current truck engines within the company, and offer suggestions for maintenance scheduling. The information gathered includes breakdown data, operational time, loading time, and breakdown frequency over twelve months, from March to February 2024. Considering the Mean Time Between Failure (MTBF) value for the euro 3 truck is 525 hours and for the euro 2 truck is 517 hours, the Mean Time to Repair (MTTR) for the euro 3 truck is 4.6 hours, while for the euro 2 truck, it is 5.4 hours. Additionally, the Availability for the euro 3 truck is 1.01 hours, and for the euro 2 truck is 1.05 hours, based on the maintenance data of truck 2 for the 12 months from March 2023 to February 2024. Keywords: Truck, Total Productive Maintenance (TPM), Mean Time Between Failure (MTBF) and (MTTR)

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TR Photography
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 17 Dec 2024 08:43
Last Modified: 17 Dec 2024 08:43
URI: http://eprints.uty.ac.id/id/eprint/17291

Actions (login required)

View Item View Item