PERBANDINGAN BIAYA PERSEDIAAN BAHAN BAKU WIREHARNESS DENGAN MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) DAN JUST IN TIME (JIT) (Studi Kasus: Di PT XYZ)

Hafiiz, Mochamad Yanuar and Al-Faritsy, Ari Zaqi (2025) PERBANDINGAN BIAYA PERSEDIAAN BAHAN BAKU WIREHARNESS DENGAN MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) DAN JUST IN TIME (JIT) (Studi Kasus: Di PT XYZ). Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5210611003 MOCHAMAD YANUAR HAFIIZ_ABSTRAK.pdf

Download (220kB)

Abstract

ABSTRAK PT Casuarina Harnessindo mengalami masalah kekosongan stok bahan baku wire dan socket yang menyebabkan terhentinya proses produksi dan terganggunya pemenuhan target. Penelitian ini bertujuan menganalisis sistem pengendalian persediaan dengan menerapkan metode Economic Order Quantity (EOQ) dan Just In Time (JIT) untuk mengoptimalkan efisiensi biaya dan pemesanan bahan baku. Metode EOQ memiliki keunggulan dalam efisiensi biaya dan pengurangan frekuensi pemesanan, tetapi membutuhkan ruang penyimpanan yang lebih besar. Sebaliknya, metode JIT unggul dalam efisiensi waktu dan menghindari penumpukan stok, namun memiliki frekuensi pemesanan tinggi yang meningkatkan biaya pesanan. Hasil analisis menunjukkan bahwa untuk bahan baku wire, metode EOQ menghasilkan jumlah pemesanan optimal sebanyak 126 roll dengan frekuensi 6 kali per tahun dan total biaya Rp 40.247.726, lebih rendah dari metode JIT yang mencapai Rp 39.279.017. Untuk bahan socket, metode JIT lebih efisien, meskipun frekuensi pemesanan tinggi 20 kali per tahun, total biayanya Rp 65.140.933, jauh lebih tinggi dari EOQ sebesar Rp 40.977.230. Berdasarkan karakteristik bahan, disarankan penerapan metode EOQ untuk wire dan JIT untuk socket agar tercapai efisiensi biaya dan kelancaran produksi secara optimal. Kata kunci: Pengendalian persediaan, EOQ, JIT, bahan baku, biaya, wire, socket. ABSTRACT PT Casuarina Harnessindo experienced shortages of raw wire and socket materials, which halted production and disrupted target achievement. This study aims to analyse the inventory control system using the Economic Order Quantity (EOQ) and Just-In-Time (JIT) methods to optimize cost efficiency and raw material ordering. The EOQ method offers advantages in cost efficiency and reduced ordering frequency, but requires larger storage space. Conversely, the JIT method excels in time efficiency and avoids stockpiling, but has a high ordering frequency, which increases ordering costs. The analysis results show that for wire raw materials, the EOQ method produces an optimal order quantity of 126 rolls with a frequency of 6 times per year and a total cost of Rp 40,247,726, lower than the JIT method, which reaches Rp 39,279,017. For socket materials, the JIT method is more efficient; despite a high order frequency of 20 times per year, the total cost is Rp 65,140,933, significantly higher than the EOQ of Rp 40,977,230. Based on the material characteristics, it is recommended to apply the EOQ method for wire and JIT for sockets to achieve optimal cost efficiency and smooth production. Keywords: Inventory control, EOQ, JIT, raw materials, cost, wire, socket.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 18 Dec 2025 06:21
Last Modified: 18 Dec 2025 06:21
URI: http://eprints.uty.ac.id/id/eprint/19525

Actions (login required)

View Item View Item