ANALISIS WASTE MANPOWER DAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus: Proyek Pembangunan Gedung DPRD Kabupaten Wonosari) WASTE MANPOWER ANALYSIS AND IMPLEMENTATION OF LEAN CONSTRUCTION MANAGEMENT (Case Study: Wonosari District DPRD Building Construction Project)

Bekti, Muchzafi Rori and Bhaskara, Adwitya (2023) ANALISIS WASTE MANPOWER DAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus: Proyek Pembangunan Gedung DPRD Kabupaten Wonosari) WASTE MANPOWER ANALYSIS AND IMPLEMENTATION OF LEAN CONSTRUCTION MANAGEMENT (Case Study: Wonosari District DPRD Building Construction Project). Tugas Akhir thesis, University Of Technology Yogyakarta.

[img] Text
5180811296_MUCHZAFI RORI BEKTI_ABSTRAK - Rori Bekti.pdf

Download (23kB)

Abstract

ABSTRAK Konstruksi ramping merupakan cara untuk penanganan proyek dengan meminimalkan Waste serta berusaha untuk menghasilkan nilai (value) semaksimum mungkin. DiIndonesia sendiri, masih sedikit dokumentasi ilmiah maupun perangkat lainnya yang membahas mengenai Konstruksi Ramping. Metode Teorema Bayes, mengetahui estimasi biaya yang ditimbulkan oleh Waste manpower dan mengetahui jenis tenaga kerja dominan yang menimbulkan Waste pada proyek dengan Metode Diagram Pareto serta mengetahui Konstruksi Ramping yang sudah diterapkan pada proyek tersebut. Data penelitian diperoleh dengan menggunakan pengisian kuesioner, wawancara dan observasi di lapangan. Hasil dari analisis probabilitas Waste manpower pada Proyek Pebangunan Gedung DPRD Kabupaten Gunung Kidul, dengan menggunakan Metode Teorema Bayes menghasilkan kesuluruhan variable Material menyebabkan Waste dengan nilai keyakinan sebesar 69,99%. Estimasi biaya Waste manpower pada proyek konstruksi selama dua minggu sebesar Rp 565.492,86, sedangkan proyeksi estimasi biaya sampai pekerjaan selesai sebesar Rp 38. 38.206.117,85. Hasil analisis Diagram Pareto mengenai Waste manpower dominan pada proyek yaitu Pekerja Kolom dengan estimasi biaya sebesar Rp 267.466,67. Dari hasil observasi dan wawancara proyek konstruksi ini telah menerapkan Konstruksi Ramping dengan tinjauan Waste manpower sebesar 100%. Kata kunci: waste manpower, teorema bayes, diagram pareto, lean construction. Lean construction is a way to handle projects by minimizing waste and trying to produce the maximum possible value. In Indonesia itself, there is still little scientific documentation or other tools that discuss Lean Construction. The Bayes Theorem method determines the estimated costs incurred by Waste manpower and determines the dominant type of workforce that causes Waste in projects using the Pareto Diagram Method and determines the Lean Construction that has been applied to the project. The research data was obtained by using questionnaires, interviews and field observations. The results of the probability analysis of Waste manpower in the Gunung Kidul Regency DPRD Building Construction Project, using the Bayes Theorem Method produce all the Material variables causing Waste with a confidence value of 69.99%. The estimated cost of Waste manpower for a two-week construction project is IDR 565,492.86, while the projected estimated cost until the work is completed is IDR 38,38,206,117.85. The results of the Pareto Diagram analysis regarding the dominant waste manpower in the project, namely Column Workers with an estimated cost of Rp. 267,466.67. From the results of observations and interviews this construction project has implemented Lean Construction with a 100% Waste Manpower review. Keywords: waste manpower, bayes theorem, pareto diagrams, lean construction.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 19 Jun 2026 03:22
Last Modified: 19 Jun 2026 03:22
URI: http://eprints.uty.ac.id/id/eprint/20078

Actions (login required)

View Item View Item