Putri, Nirwana and Utomo, Puji (2023) IMPLEMENTASI KONSEP BUILDING INFORMATION MODELLING (BIM) PADA PEKERJAAN PLUMBING (Studi Kasus: Gedung Dinas Lingkungan Hidup (DLH) Kota Yogyakarta) IMPLEMENTATION OF BUILDING INFORMATION MODELLING (BIM) CONCEPTS IN PLUMBING WORK (Case Study: Yogyakarta City Environmental Service (DLH) Building). Tugas Akhir thesis, University Of Technology Yogyakarta.
|
Text
5190811303_Nirwana Putri_Abstrak -DONE.pdf Download (97kB) |
Abstract
Industri kontruksi di Indonesia merupakan salah satu industi yang sedang mengalami perkembangan dalam segi teknologi. Perkembangan teknologi konstruksi harus segera di realisasikan pada pekerjaan konstruksi di Indonesia. Building Information Modelling (BIM) merupakan teknologi terbarukan pada pekerjaan konstruksi. Implementasi penggunaan Building Informatio Modelling (BIM) pada pekerjaan plumbing tentunya bisa diterapkan guna meminimalisir kesalahan iniformasi dan besarnya anggaran untuk pekerjaan plumbing. Tujuan dari penerapan metode Building Information Modelling (BIM) adalah untuk mengetahui tingkat efisiensi dalam segi biaya untuk pekerjaan plumbing dan untuk pengimplementasian metode Building Information Modelling (BIM) pada pekerjaan plumbing, maka dari itu peneliti mengambil tema tersebut sebagai bahan penelitian dalam penyusunan Tugas Akhir. Hasil dari alur pemipaan Gedung Dinas Lingkungan Hidup Kota Yogyakarta menggunakan Software Autodesk Revit 2023. Hasil yang dibuat menggunakan bantuan dari tools yang terdapat pada Software Autodesk Revit 2023 yang dapat mempermudah pengerjaan perencanaan pekerjaan plumbing. Total panjang pipa diameter 25 mm didapat kebutuhan Panjang 99080 mm dan total panjang pipa diameter 100 mm didapat dengan kebutuhan Panjang 270247 mm dengan jumlah fitting Elbow Aw sebanyak 155 dan jumlah fitting Reducing Socket Aw sebanyak 104 dan jumlah fitting Tee Aw sebanyak 64. Hasil kebutuhan air bersih dalam Gedung Dinas Lingkungan Hidup Kota Yogyakarta yang dihasilkan dari perhitungan analisis didapatkan sebesar 14.700 liter/ hari dan 4416.57 liter/jam, 110.41 liter/menit. Hasil air bersih yang didapatkan berfungsi untuk mencari kebutuhan kapasitas ground reservoir 146.11 m3 dan untuk menghitung kapasitas roof tank 33.389 m3. Hasil diameter pipa air bersih didapatkan dari Perhitungan diameter pipa didapatkan dengan cara memplotkan hasil dari laju aliran per menit dan hasil dari nilai laju kecepatan aliran meter/detik didapat dibuku “Perancangan dan Pemeliharaan Sistem Plambing”. Mendapatkan hasil diameter pipa distribusi sebesar 80 mm dengan pipa 25 mm. Kata kunci: Autodesk Revit, Ground Reservoir, Plumbing, Roof Tank. The construction industry in Indonesia is one of the industries that is experiencing developments in terms of technology. Developments in construction technology must be immediately realized in construction work in Indonesia. Building Information Modeling (BIM) is a renewable technology in construction work. Implementing the use of Building Information Modeling (BIM) in plumbing work can of course be applied to minimize information errors and the size of the budget for plumbing work. The aim of applying the Building Information Modeling (BIM) method is to determine the level of efficiency in terms of costs for plumbing work and to implement the Building Information Modeling (BIM) method in plumbing work, therefore the researcher took this theme as research material in preparing the Final Project. The piping flow of the Yogyakarta City Environmental Service Building uses Autodesk Revit 2023 Software. The results are created using the help of tools found in Autodesk Revit 2023 Software which can make planning plumbing work easier. The total length of pipe with a diameter of 25 mm is obtained with a length requirement of 99080 mm and the total length of pipe with a diameter of 100 mm is obtained with a length requirement of 270247 mm with a number of Elbow Aw fittings of 155 and a number of Reducing Socket Aw fittings of 104 and a number of Tee Aw fittings of 64. Results of water requirements The cleanliness in the Yogyakarta City Environmental Service Building resulting from analytical calculations was found to be 14,700 liters/day and 4416.57 liters/hour, 110.41 liters/minute. The clean water results obtained serve to determine the required ground reservoir capacity of 146.11 m3 and to calculate the roof tank capacity of 33,389 m3. The diameter of the clean water pipe is obtained from the calculation of the pipe diameter obtained by plotting the results of the flow rate per minute and the results of the flow rate values in meters/second obtained in the book "Plumbing System Design and Maintenance". The results of the distribution pipe diameter are 80 mm with a 25 mm pipe. Keywords: Autodesk Revit, Ground Reservoir, Plumbing, Roof Ta
| Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
| Depositing User: | Kaprodi S1 Teknik Sipil UTY |
| Date Deposited: | 19 Jun 2026 07:19 |
| Last Modified: | 19 Jun 2026 07:19 |
| URI: | http://eprints.uty.ac.id/id/eprint/20148 |
Actions (login required)
![]() |
View Item |