PERENCANAAN AGGREGAT PRODUKSI KAOS PADA USAHA KECIL MENENGAH AC41

Roffif, Muhammad and Suseno, Suseno (2020) PERENCANAAN AGGREGAT PRODUKSI KAOS PADA USAHA KECIL MENENGAH AC41. Tugas Akhir thesis, University of Technology Yogyakarta.

[img]
Preview
Text
5150611008 Muhammad Roffif.pdf

Download (228kB) | Preview

Abstract

ABSTRAK Pada pertengahan tahun 2018 bulan agustus, UKM AC41 mengalami stock out produk. Hal ini mengakibatkan pembengkakan biaya produk untuk mengejar ketersediaan stok. Kemampuan memproduksi kaos pada tiap bulan adalah 1.300 kaos, namun terjadi kekurangan jumlah stok yang tersedia. Keputusan yang dibuat adalah menggunakan subkontrak sebagai bantuan memperbanyak produksi kaos. Hal ini mengakibatkan penipisan laba. Biaya produk semula sebesar Rp 45.000,00 menjadi Rp 55.000,00. Dengan adanya perencanaan agregat, diharapkan proses produksi dapat berjalan dengan lancar, sesuai permintaan, dan menghindari pemborosan biaya, terutama biaya tenaga kerja, penyimpanan dan persediaan. Untuk mengatasi masalah tersebut perusahaan perlu menetapkan Perencanaan Agregat yang baik dan tepat untuk menyeimbangkan kapasitas produksi dengan sumber daya yang dimiliki. Dalam penelitian digunakan 3 alternatif perencanaan agregat, yaitu : Smooth Production, Chase Current Demand, dan Constant production then overtime and subcontract. Alternatif Alternatif Constant production then overtime and subcontract dipilih karena membutuhkan biaya paling rendah, yaitu sebesar Rp 648.934.300. Kata Kunci: Perencanaan aggregat, Biaya produksi, Constant production then overtime and subcontract ABSTRACT In the middle of August 2018, SME AC41’s product is out of stock. This makes cost production increasing to meet stock demand. The production capacity is 1.300 t-shirts every month, but they were shortage in the stock. This makes the profit loss, production cost usually takes Rp 45.000,00, but it increases into Rp 55.000. With aggregate planning, production process can run smoothly, meet the demand, and avoid high production cost, especially in manpower, storage and supply cost. To overcome the problem, the company needs to set a good and precise aggregate planning in balancing production capacity with their resources. In the research, it is used 3 alternatives of aggregate planning, such as: Smooth Production, Chase Current Demand, and Constant production, then overtime and subcontract. Alternative planning Constant production and then overtime and subcontract are chosen because it takes the lowest cost, which is Rp 648.934,300. Keywords: Aggregate Planning, Production cost, Constant production than overtime and subcontract

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 28 Sep 2020 08:12
Last Modified: 28 Sep 2020 08:12
URI: http://eprints.uty.ac.id/id/eprint/5364

Actions (login required)

View Item View Item