ANALISIS PERHITUNGAN PAYBACK PERIOD PROYEK PEMBANGUNAN GEDUNG FAKULTAS EKONOMI UNIVERSITAS SAM RATULANGI MANADO ANALYSIS OF PAYBACK PERIOD CALCULATION OF THE CONSTRACTION PROJECT OF FACULTY OF ECONOMIC BUILDING, SAM RATULANGI MANADO UNIVERSITY

Nitake, Yosua and Bhaskara, Adwitya (2020) ANALISIS PERHITUNGAN PAYBACK PERIOD PROYEK PEMBANGUNAN GEDUNG FAKULTAS EKONOMI UNIVERSITAS SAM RATULANGI MANADO ANALYSIS OF PAYBACK PERIOD CALCULATION OF THE CONSTRACTION PROJECT OF FACULTY OF ECONOMIC BUILDING, SAM RATULANGI MANADO UNIVERSITY. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5150811224_Yosua Nitake.pdf

Download (112kB) | Preview

Abstract

ABSTRAK Peningkatan kesadaran masyarakat akan pentingnya pendidikan khususnya pendidikan jenjang yang lebih tinggi sangat mendorong bagi anak-anak yang ingin sekali melanjutkan dibangku kuliah dan itu semua cita-cita sebagian besar anak-anak Indonesia yang sangat ingin sekali mendapatkan gelar terbaik dibelakang nama. Universitas Sam Ratulangi merupakan salah satu PTN terbaik di Indonesia khususnya bagian Indonesia Timur kota Manado. Dalam tiap tahunnya Universitas tersebut mengalami peningkatan mahasiswa/i yang begitu pesat dan tiap tahunnya fakultas ekonomi di Univ tersebut banyak sekali peminatnya dikarenakan Univ tersebut juga PTN dan memiliki almamater yang bisa dibilang punya nama di Indonesia kuhususnya di Indonesia Timur jadi agar ideal kampus tersebut membangun gedung baru untuk mengantisipasi siswa yang semakin banyak karna kampus tersebut juga masih memiliki lahan yang tersedia untuk mendirikan bangunan. Untuk itu dalam penelitian ini peneliti mencoba mencari seberapa besar investasi yang dibutuhkan dan menilai kelayakan investasi gedung kampus tersebut. Untuk mengukur tingkat kelayakan tidak hanya pada perhitungan aspek keuangan tetapi juga menganalisis aspek-aspek yang lain. Dari hasil perhitungan aspek keuangan dihasilkan NPV positif sebesar Rp.26.024.201.020BEP didapatkan hasil Rp. 23.259.967.315 dan BCR mendapatkan nilai 1.44% dan Payback period jatuh pada tahun ke 2 bulan ke 1. Kata kunci : BCR, BEP, NPV, Payback Period. ABSTRACT Increased public awareness of the importance of education, especially higher education is very encouraging for children who are eager to continue in college and most Indonesian children have aspirations to get the best degree. Sam Ratulangi University is one of the best PTNs in Indonesia, especially the eastern part of the city of Manado. In each year the University has increased the number of students so rapidly and each year the faculty of economics at the University is very much in demand because the University is also a State University and has an alma mater that has practically a name in Indonesia especially in Eastern Indonesia so it is ideal for the campus to build a new building to anticipate more and more students because the campus also still has available land to build buildings. For this reason, in this study the researchers tried to find out how much investment was needed and to assess the investment feasibility of the campus building. To measure the level of eligibility not only in the calculation of financial aspects but also analyze other aspects. From the calculation of financial aspects produced a positive NPV of Rp.26,024,201,020 BEP obtained Rp. 23,259,967,315 and BCR get a value of 1.44% and the Payback period falls in the 2nd year of the 1st month. Keywords: BCR, BEP, NPV, Payback Period.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 14 Oct 2020 08:48
Last Modified: 14 Oct 2020 08:48
URI: http://eprints.uty.ac.id/id/eprint/5862

Actions (login required)

View Item View Item