Putra, Dominikus Oktangada Kurnia and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS DAN BIAYA ALAT BERAT EXCAVATOR STUDI KASUS PERTAMBANGAN PASIR SUNGAI GENDOL EXCAVATOR EQUIPMENT PRODUCTIVITY AND COST ANALYSIS ON GENDOL RIVER SAND MINING CASE STUDY. Tugas Akhir thesis, University Technology Yogyakarta.
|
Text
5150811086_DOMINIKUS OKTANGADA KURNIA PUTRA.pdf Download (251kB) | Preview |
Abstract
ABSTRAK Bidang teknik sipil memanfaatkan alat-alat berat untuk membantu manusia dalam melakukan pekerjaan berskala besar. Tujuan penggunaan alat-alat berat tersebut untuk memudahkan manusia dalam mengerjakan pekerjaannya sehingga hasil yang diharapkan dapat tercapai dengan lebih mudah pada waktu yang relatif lebih singkat. Di daerah Sleman bagian utara mempunyai cadangan pasir yang melimapah, banyak pertambangan pasir maupun depo pasir, sehingga penggunaan alat berat terutama excavator semakin tinggi. Penelitian ini berfokus pada produktivitas excavator dengan metode MPDM ( Method Productivity Delay Model ). Dalam penelitian ini dapat diketahui produktivitas excavator, penundaan siklus produksi dan biaya operasional. Berdasarkan hasil penelitian Nilai produktivitas alat berat excavator rata-rata pada pekerjaan stripping 75,30 m3/jam, pekerjaan ripping 71,66 m3/jam, pekerjaan loading 98,28 m3/jam, Didapatkan waktu siklus tak tertunda alat berat excavator menggunakan teknik MPDM pada hari ke -2 sebesar 9,02 detik, pada hari ke -3 sebesar 16,70 detik, pada hari ke -4 sebesar 6,60 detik, pada hari ke -5 sebesar 3,30 detik, pada hari ke -6 sebesar 0,35 detik pada hari ke -7 sebesar 25,39 detik. Untuk hari ke -1 tidak memiliki waktu siklus tak tertunda dikarenakan tidak memiliki waktu tak tertunda (non delay) selama pekerjaan pengambilan sample > 12 m3 setiap siklusnya. Biaya operasional excavator pada pertambangan pasir sungai Gendol yang terletak di kel. Kepuharjo, kec. Cangkringan, kab. Sleman, Yogyakarta, berdasarkan perhitungan sebesar Rp. 81.300.000/ bulan. Kata kunci: Excavator, Pertambangan Pasir, Teknik MPDM Abstract Civil engineering sector makes use of heavy equipment to assist humans in doing large-scale work. The purpose of using these heavy equipments is to make it easier for humans to do their jobs so that the expected results can be achieved more easily in a relatively short time. In the northern part of Sleman, there are abundant sand reserves, many sand mines or sand depots, so the use of heavy equipment, especially excavators, is getting higher. This research is on the analyses of the productivity of the excavator using the MPDM (Method Productivity Delay Model) method. In this research, it presented the excavator productivity, production cycle delays and operational costs. Based on the results of the research, the average productivity value of excavator heavy equipment on stripping work was 75.30 m3 / hour, ripping work was 71.66 m3 / hour, loading job was 98.28 m3 / hour. It was obtained that the excavator's heavy equipment off cycle time at the 2nd day using the MPDM technique was of 9.02 seconds, the 3rd day was of 16.70 seconds, on the 4th day was of 6.60 seconds, on the 5th day was of 3.30 seconds, on the 6th day was of 0,35 seconds and on the 7th day was of 25.39 seconds. For day 1, there wass no duty cycle time because it did not have non-delay time during the sampling time which was > 12 m3 per cycle. Excavator operational cost in Gendol river sand mining located in kel. Kepuharjo, kec. Cangkringan, Kab. Sleman, Yogyakarta, was calculation about Rp. 81,300,000/ month. Keywords: Excavator, Sand Mining, MPDM Engineering
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
Depositing User: | Kaprodi S1 Teknik Sipil UTY |
Date Deposited: | 21 Oct 2020 03:11 |
Last Modified: | 21 Oct 2020 03:11 |
URI: | http://eprints.uty.ac.id/id/eprint/5944 |
Actions (login required)
View Item |