Optimasi Site Layout Menggunakan Multi Objectives Function Studi Kasus Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM Site Layout Optimization Using Multi Objectives Functions A Case Study of the UGM Vocational School Teaching Industry Learning Center (TILC) Building Project

GERFIAN PUTRA, DHANYKO NOVAS BINTANG and Saputro, Cahyo Dita (2020) Optimasi Site Layout Menggunakan Multi Objectives Function Studi Kasus Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM Site Layout Optimization Using Multi Objectives Functions A Case Study of the UGM Vocational School Teaching Industry Learning Center (TILC) Building Project. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5160811340_DhanykoNovasB.G.P.pdf

Download (59kB) | Preview

Abstract

ABSTRAK Perkembangan industri dan perkembangan teknologi yang sangat pesat membuat perusahaan-perusahaan kontruksi di dunia terutama di Indonesia untuk melakukan efisiensi di berbagai aspek produksi. Banyak perusahaan konstruksi di Indonesia yang belum memperhatikan beberapa faktor yang sangat penting dan sebenarnya memiliki potensi untuk dioptimalkan. Salah satu cara yang dapat dilakukan untuk mengoptimalkan kinerja di lapangan adalah dengan cara mengoptimalkan tata letak fasilitas pada proyek. Dengan dilakukannya optimasi site layout maka dapat meningkatkan produktivitas, hemat waktu, pekerjaan proyek dapat lebih efisien dan mendapatkan hasil kerja yang optimal. Penelitian ini memiliki tujuan untuk menganalisis bentuk site layout, mengetahui alternatif site layout, serta mendapatkan bentuk site layout optimal. Metode optimasi yang digunakan dalam penelitian ini adalah analisis Multi Objectives Function yaitu pengambilan keputusan yang berkaitan dengan masalah optimasi matematika yang melibatkan lebih dari satu fungsi tujuan yang akan dioptimalkan secara bersamaan. Fungsi tujuan yang akan di optimalkan adalah nilai travelling distance dan safety index untuk mendapatkan nilai minimum. Dalam penelitian ini dilakukan pengumpulan data primer dan sekunder yang diolah menjadi tabel-tabel untuk kemudian dilakukan analisis. Studi kasus penelitian ini pada proyek pembangunan Gedung TILC Sekolah Vokasi UGM. Target untuk dicapai yaitu meningkatkan efisiensi dan nilai keamanan di lingkungan kerja. Dari hasil perhitungan meggunakan Multi Objectives Function diketahui bahwa kondisi eksisting memiliki nilai total sebesar 8647,1486 dan alternatif 3 memiliki nilai total yang paling rendah yaitu sebesar 7786,7486. Maka alternatif 3 dipilih sebagai site layout yang paling optimal dalam Proyek Pembangunan Gedung TILC dengan nilai total 7786,7486. Kata kunci: Optimasi, Safety Index, Site Layout, Travelling Distance. Abstract The very rapid development of industrial and technological advancement has made construction companies in the world, especially in Indonesia, need to make efficiency in various aspects of production. Many construction companies in Indonesia have not paid attention to several very important factors and have the potential to be optimized. One way that can be done to optimize performance in the field is by optimizing the facility layout on the project. By doing site layout optimization it can increase productivity, save time, and project work can be more efficient and get optimal work results. This study aimed to analyze the shape of the site layout, find out alternative site layouts, and get the optimal site layout. The optimization method used in this research was Multi Objectives Function analysis, namely decision making related to mathematical optimization problems that involved more than one objective function to be optimized simultaneously. The objective function that will be optimized was the value traveling distance and safety index to get the minimum value. In this study, primary and secondary data were collected were processed into tables for later analysis. This research case study was on the construction project of the UGM Vocational School TILC Building. The target to be achieved was to increase the efficiency and safety value in the work environment. From the results of calculations using the Multi Objectives Function, it was known that the existing conditions had a total value of 8647.1486 and alternative 3 had the lowest total value of 7786.7486. Then alternative 3 was chosen as the most optimal site layout in the TILC Building Construction Project with a total value of 7786.7486. Keywords: Optimization, Safety Index, Site Layout, Traveling Distance

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 22 Oct 2020 03:42
Last Modified: 22 Oct 2020 03:42
URI: http://eprints.uty.ac.id/id/eprint/6021

Actions (login required)

View Item View Item