ANALISIS POTENSI KINERJA SISTEM PEMBANGKIT LISTRIK TENAGA HYBRID DAERAH PANTAI BARU

Ardianto, Rizki Aditia (2021) ANALISIS POTENSI KINERJA SISTEM PEMBANGKIT LISTRIK TENAGA HYBRID DAERAH PANTAI BARU. Tugas Akhir thesis, University of Technology Yogyakarta.

[img]
Preview
Text
Abstrak_5140711033_Rizki Aditia Ardianto done.pdf

Download (338kB) | Preview

Abstract

ABSTRACT Renewable energi sources is a solution of alternative energy to overcome the electricity crisis in Indonesia. Hybrid Power Plant at Baru beach, Bantul, Yogyakarta, is the pilot project of Hybrid energy based on potentials of solar energy and wind power which used as models in the development of renewable energy in integrated manner through Regional Innovation System, Performance of a hybrid power system can be evaluated from reliability system and economic aspects. In general, integration on Hybrid Power Plant system is multivariable system, so that to model the hybrid system, of HOMER (Hybrid Optimization Model for Electric Renewables) software is needed. This software optimizes the design of Hybrid Power Plant system based on the lowest NPC value with estimated measurements or system capacity and costs as outputs. Pandansimo Hybrid Power Plant system configuration consists of PLTS and PLTB. The analysis of Pantai Baru Hybrid Power Plant system is done through two systems modeling Off-Grid and On-Grid. First, the results of the analysis indicate that the Hybrid Power Plant system is feasible in meeting the needs of users of electrical energy based on the total net present value (NPC) of U. S $ 307.302/ Rp.4,39595511,- generating cost (COE) of U.S. $ 0.872/ Rp.12.473,- per kWh, electricity production capacity of 121,239 kWh per year, and the excess of electricity during the year amounted to 94.705 kWh. Second, the configuration of Hybrid Power Plant system On Grid can improve the effectiveness of Pandansimo Hybrid Power Plant in the utilization of renewable energy sources as to reduce the NPC to U.S. $ 253.850/ Rp.3,63132425,- at a cost of U.S. $ 0.702/ Rp.10.299,- COE. The ability of selling electricity is at 94.705 kWh per year. Configuration system to grid can also reduce network’s CO2 emissions by 31,557 pounds per year. Keywords: Renewable energy, Hybrid, Solar, Wind, HOMER

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Sains Dan Teknologi > S1 Teknik Elektro
Depositing User: Kaprodi Teknik Elektro
Date Deposited: 26 Jun 2021 01:47
Last Modified: 26 Jun 2021 01:47
URI: http://eprints.uty.ac.id/id/eprint/7617

Actions (login required)

View Item View Item