Up a level |
Pratama, Muhammad Indra and Bhaskara, Adwitya (2020) KOMPARASI BIAYA DAN WAKTU PEKERJAAN TIANG PANCANG MENGGUNAKAN METODE HYDRAULIC STATIC PILE DRIVER DENGAN DROP HAMMER Studi Kasus Proyek Pembangunan Gedung Pusat Penelitian, Pendidikan, Dan Kebudayaan PP Muhammadiyah Yogyakarta COST AND TIME COMPARISON OF PILE WORK USING HYDRAULIC STATIC PILE DRIVER WITH DROP HAMMER A Case Study of the Project for the Construction of the Research, Education and Culture Center Building of PP Muhammadiyah Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.