Up a level |
Saputro, Ridho and Bhaskara, Adwitya (2020) ANALISIS PERBANDINGAN EFISIENSI DENGAN OVER TIME DAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Proyek Penataan Embung Sendari Kecamatan Mlati, Kabupaten Sleman, Yogyakarta) COMPARATIVE ANALYSIS OF EFFICIENCY WITH OVER TIME AND LABOR ADDITION USING THE TIME COST TRADE OFF METHOD (Case Study: Sendari Reservoir Restructuring Project in Mlati District, Sleman Regency, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.