Rokhim, Krisna Aditya and Yuamita, Ferida (2024) PENGARUH LINGKUNGAN KERJA, FASILITAS KERJA, DAN KOMPETENSI TERHADAP TARGET WAKTU KERJA KARYAWAN DI BAGIAN PENGELASAN STUDI KASUS BEGKEL LAS SDR KAB. SEMARANG. Tugas Akhir thesis, University of Technology Yogyakarta.
Text
5200611178 Krisna Aditya Rokhim-ABSTRAK.pdf Download (160kB) |
Abstract
ABSTRAK Bengkel las SDR merupakan perusahaan yang bergerak dalam bidang manufaktur. Bisinis utama perusahaan ini bergerak pada sektor industri perancangan dan perencanaan. Kendala yang dialami oleh bengkel las SDR mengenai lingkungan kerja, fasilitas kerja, dan kompetensi pegawai. Kendala pada sektor lingkungan kerja adalah kondisi cuaca yang berubah-ubah, terbatasnya area kerja dan temperatur suhu di area kerja, sedangkan permasalahan mengenai fasilitas kerja yaitu keterbatasan jumlah alat kerja yang diberikan, dan kualitas alat bekerja, selanjutnya kendala mengenai kompetensi berupa waktu adaptasi karyawan dalam pengoperasian alat, pengendalian waktu kerja yang kurang teratur, dan kesadaran pengunaan safety dalam bekerja. Permasalahan-permasalahan tersebut menyebabkan kerugian bagi pihak bengkel maupun pekerja bengkel. Tujuan penelitian ini adalah untuk mengetahui faktor yang memperngaruhi target waktu kerja pekerja dibagian pengelasan. Penelitian ini dilakukan dengan menggunakan SPSS 25 dalam pengolahan data. Data diolah menggunakan metode regresi linear berganda. Hasil penelitian menunjukan bahwa pada saat uji f scara keseluruhan variabel independen yaitu lingkungan kerja, fasilitas kerja dan kompetesi mempunyai pengaruh terhadap selesai target sebagai variabel dependen. Uji t menghasilkan kesimpulan bahwa variabel yang berpengaruh terhadap target waktu adalah variabel kompetensi dengan t-hitung sebesar 2,706 dan t-tabel 2,178 (2,706 > 2,178) serta nilai sig. 0,022 < 0,05 sehingga H3 diterima dan H0 ditolak, sedangkan variabellingkungan kerja dan fasilitas kerja tidak berpengaruh terhadap target waktu dikarenakan nilai t-hitung < t-tabel dan nilai sig. > 0.05. Kata kunci: Uji Regresi Linear Berganda, Uji f, Uji t, Lingkungan Kerja, Fasilitas Kerja, Kompetesi, Target Waktu. ABSTRACT SDR Welding Workshop is a company involved in the manufacturing industry. This company's primary focus is in the design and planning industry sector. The SDR welding workshop is experiencing constraints related to the work environment, work facilities, and the skills of its employees. The challenges in the work environment include changing weather conditions, restricted work areas and temperatures, and issues with work facilities such as limited and low-quality work tools. There are also constraints related to employee competence, including time needed to adapt to using tools, irregular control of work hours, and awareness of workplace safety. The workshop and its workers both suffer losses from these problems. This research aimed to identify the factors impacting the desired work time of employees in the welding department. SPSS 25 was utilized for data analysis in this study. The data underwent processing through multiple linear regression techniques. The findings revealed that, in the overall f test, the independent variables - work environment, work facilities, and competency - significantly impacted achieving the target, which served as the dependent variable. The t-test indicated that the competency variable was the key influencer on the target time, with a t-count of 2.706, a t-table of 2.178 (2.706> 2.178), and a sig. Value of 0.022 <0.05. Consequently, H3 was accepted, while H0 was rejected. On the other hand, the work environment and work facilities variables did not affect the target time as their t-count values were <t-table and sig. values were > 0.05. Keywords: Multiple Linear Regression Test, f Test, t-Test, Work Environment, Work Facilities, Competence, Time Target.
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Industri |
Depositing User: | Kaprodi S1 Teknik Industri UTY |
Date Deposited: | 17 Dec 2024 04:41 |
Last Modified: | 17 Dec 2024 04:41 |
URI: | http://eprints.uty.ac.id/id/eprint/17282 |
Actions (login required)
View Item |