PERENCANAAN PENGENDALIAN PERSEDIAAN BAHAN BAKU BENANG 30RY DENGAN METODE CONTINUOUS REVIEW SYSTEM DAN PERIODIC REVIEW SYSTEM

Kusumawardani, Salsabilla and Setiafindari, Widya (2024) PERENCANAAN PENGENDALIAN PERSEDIAAN BAHAN BAKU BENANG 30RY DENGAN METODE CONTINUOUS REVIEW SYSTEM DAN PERIODIC REVIEW SYSTEM. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5200611194 Salsabilla Kusumawardani-ABSTRAK.pdf

Download (266kB)

Abstract

ABSTRAK Perencanaan persediaan merupakan komponen penting yang mempengaruhi kelancaran proses produksi. Hal ini terkait dengan berapa banyak persediaan yang harus dimiliki perusahaan karena mempengaruhi biaya persediaan. Perusahaan mengalami overstock pada salah satu jenis bahan bakunya yaitu benang 30RY sehingga mengakibatkan adanya penumpukan bahan baku di gudang dan tingginya biaya penyimpanan. Penelitian ini bertujuan untuk mengendalikan persediaan bahan baku dan untuk meminimalkan total biaya persediaan dengan menggunakan metode Continuous Review System dan Periodic Review System. Hasil penelitian menunjukkan bahwa total biaya persediaan paling minimal dengan menggunakan metode Continuous Review System sebesar Rp39.608.727.959,14 sedangkan total biaya persediaan berdasarkan kebijakan perusahaan sebesar Rp40.284.576.260,00 dan metode Periodic Review System sebesar Rp39.701.091.552,74 sehingga dengan menerapkan metode Continuous Review System dapat memberikan penghematan sebesar Rp675.848.300,86 atau 1,68%. Setelah dilakukan peramalan, diperoleh total kebutuhan bahan baku benang 30 RY periode 2024 mencapai 35.557 karung dengan total biaya persediaan menurut metode Continuous Review System sebesar Rp39.628.147.841,77. Kata kunci: persediaan, Continuous Review System, Periodic Review System, Peramalan ABSTRACT Inventory planning is a crucial factor that impacts the efficiency of the production process. This activity pertains to the amount of inventory the company needs to hold, impacting inventory expenses. The company encountered an excess of one of its raw material varieties, specifically 30RY yarn, which led to an accumulation of raw materials in the warehouse and increased storage expenses. The objective of this study is to manage the inventory of raw materials and reduce overall inventory costs by utilizing the Continuous Review System and Periodic Review System methods. The findings indicated that the Continuous Review System method resulted in a minimum total inventory cost of Rp39,608,727,959.14, whereas the total inventory cost under company policy was Rp40,284,576,260.00, and the Periodic Review System method yielded Rp39,701,091,552.74. By implementing the Continuous Review System method, savings of Rp675,848,300.86 or 1.68% can be achieved. Following the forecast, the total raw material requirement for 30 RY yarn for the 2024 period was 35,557 sacks, with a Rp39,628,147,841.77 total inventory cost based on the Continuous Review System method. Keywords: inventory, Continuous Review System, Periodic Review System, Forecasting

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 17 Dec 2024 08:36
Last Modified: 17 Dec 2024 08:36
URI: http://eprints.uty.ac.id/id/eprint/17289

Actions (login required)

View Item View Item