PENENTUAN WAKTU STANDAR SPECIAL PROCESS (TAKT 1 & TAKT 2) PADA KERETA 612 PT. INDUSTRI KERETA API (PERSERO) MENGGUNAKAN METODE STOPWATCH TIME STUDY (STS)

Puspitarini, Fingka Dyah and Suseno, Suseno (2025) PENENTUAN WAKTU STANDAR SPECIAL PROCESS (TAKT 1 & TAKT 2) PADA KERETA 612 PT. INDUSTRI KERETA API (PERSERO) MENGGUNAKAN METODE STOPWATCH TIME STUDY (STS). Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5210611112 FINGKA DYAH PUSPITARINI_ABSTRAK.pdf

Download (246kB)

Abstract

ABSTRAK PT. INKA (Persero) atau PT Industri Kereta Api merupakan salah satu Badan Usaha Milik Negara yang bergerak dibidang manufaktur sebagai produsen Kereta Api pertama dan terbesar di kawasan Asia Tenggara. Dalam proses produksi Kereta terdapat berbagai tahapan yang perlu dilalui yaitu fabrikasi, Special process dan Finishing. Saat ini PT. Industri Keret Api sedang mengembangkan project Kereta 612 salah satunya adalah produk kereta New Generation. Dalam proses produksinya perusahaan harus memenuhi permintaan sesuai dengan target dan jadwal yang telah ditentukan. Oleh karena itu dilakukan Penentuan Waktu Standar Special Process (Takt 1 & Takt 2) Pada Kereta 612 PT. Industri Kereta Api (Persero) Menggunakan Metode Stopwatch Time Study (STS) untuk mengevaluasi dan mengetahui waktu aktual serta standar yang terdapat pada lantai produksi khususnya pada Special Process sehingga dapat dilakukan perbaikan agar proyek dapat selesai tepat waktu. Data yang digunakan dalam penelitian ini merupakan data waktu aktual yang terdapat pada Special Process kereta 612 dengan sampel 3 kereta poenumpang pada setiap prosesnya. Berdasarkan data tersebut terdapat 11 tahapan Special Process yang kemudian diolah dengan menggunakan metode Stopwatch Time Study (STS). Hasil dari penelitian menunjukan bahwa terdapat perbedaan yaitu waktu standar Special Process dapat diselesaikan selama 4,15 Hari sedangkan pada dokumen Process Instruction dapat diselesaikan 5,25 Hari.Perbedaan ini disebabkan oleh beberapa faktor seperti tenaga kerja, material, metode dan lain sebagainya. Dengan adanya penelitian ini, hasil waktu standar serta evaluasi diharapkan dapat digunakan untuk memperbarui dokumen Process Instruction sehingga dapat mengefisiensi waktu, meminimalkan biaya dan mengefisiensi alokasi terhadap pekerja. Kata kunci: Stopwatch Time Study (STS), Process Instruction ABSTRACT PT. INKA (Persero), or PT Industri Kereta Api, is a State-Owned Enterprise engaged in manufacturing and is recognized as the first and largest train manufacturer in Southeast Asia. The train production process involves several stages, including fabrication, special processes, and finishing. Currently, PT. Industri Kereta Api is developing the Train 612 project, which features a new generation of train products. During production, the company must meet demand according to predetermined targets and schedules. Therefore, the Special Process Standard Time (Takt 1 & Takt 2) for Train 612 at PT was determined. Industri Kereta Api (Persero) uses the Stopwatch Time Study (STS) method. This evaluation aims to assess and establish the actual and standard times on the production floor, particularly in the special processes, to facilitate improvements, ensuring the project is completed on time. The data utilized in this study consists of actual time measurements from the special processes of Train 612, with a sample of three passenger trains for each process. Based on this data, 11 stages of the special process are subsequently analyzed using the Stopwatch Time Study (STS) method. The study's findings indicate a discrepancy: the standard time for completing the Special Process is 4.15 days, whereas in the Process Instruction document, it is 5.25 days. Factors such as labor, materials, and methods are responsible for this difference. This study uses the standard time and evaluation results to update the Process Instruction document to improve efficiency in terms of time, cost minimization, and worker allocation. Keywords: Stopwatch Time Study (STS), Process Instruction

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 31 Oct 2025 03:18
Last Modified: 31 Oct 2025 03:18
URI: http://eprints.uty.ac.id/id/eprint/19379