Nugroho, Arjun Setyo Adi and Nugroho, Andung Jati (2025) ANALISIS PRODUKTIVITAS BASE PLATE PADA PT SINAR SEMESTA MENGGUNAKAN METODE LINE BALANCING DAN ACTIVITY RELATIONSHIP CHART. Tugas Akhir thesis, University of Technology Yogyakarta.
|
Text
5190611203 ARJUN SETYO ADI NUGROHO_ABSTRAK.pdf Download (192kB) |
Abstract
Abstrak Penelitian ini bertujuan untuk menganalisis produktivitas produksi baseplate di PT. Sinar Semesta menggunakan metode Line Balancing dan Activity Relationship Chart (ARC). Permasalahan utama yang dihadapi perusahaan adalah ketidakseimbangan beban kerja antar stasiun kerja dan tata letak fasilitas yang tidak efisien, yang menyebabkan fluktuasi dalam jumlah produksi dan waktu siklus kerja. Penelitian dilakukan selama periode April hingga November 2024 dengan menganalisis data produksi, waktu siklus, jumlah tenaga kerja, dan hubungan antar aktivitas. Hasil analisis menunjukkan bahwa efisiensi lintasan rata-rata sebesar 65,57% dengan efisiensi tertinggi pada bulan September (81,75%) dan terendah pada bulan Mei (56,32%). Analisis ARC mengungkapkan adanya ketidaksesuaian tata letak antar aktivitas penting, yang menyebabkan aliran kerja tidak optimal. Oleh karena itu, disarankan dilakukan perencanaan ulang tata letak fasilitas dan penyeimbangan beban kerja untuk meningkatkan efisiensi dan produktivitas. Kata Kunci: Produktivitas, Line Balancing, Activity Relationship Chart, Tata Letak Fasilitas, Efisiensi Produksi. Abstract This study aims to analyze baseplate production productivity at PT Sinar Semesta using the Line Balancing and Activity Relationship Chart (ARC) methods. The main problems faced by the company are workload imbalance between workstations and inefficient facility layout, which causes fluctuations in production volume and work cycle times. The study was conducted from April to November 2024, analyzing production data, cycle times, workforce numbers, and relationships between activities. The analysis results showed an average line efficiency of 65.57%, with the highest efficiency in September (81.75%) and the lowest in May (56.32%). The ARC analysis revealed a mismatch in the layout between key activities, resulting in suboptimal workflow. Therefore, it is recommended to re-plan the facility layout and workload balancing to improve efficiency and productivity. Keywords: Productivity, Line Balancing, Activity Relationship Chart, Facility Layout, Production Efficiency.
| Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
|---|---|
| Subjects: | T Technology > TS Manufactures |
| Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Industri |
| Depositing User: | Kaprodi S1 Teknik Industri UTY |
| Date Deposited: | 18 Dec 2025 04:45 |
| Last Modified: | 18 Dec 2025 04:45 |
| URI: | http://eprints.uty.ac.id/id/eprint/19522 |
Actions (login required)
![]() |
View Item |