EVALUASI KINERJA GEDUNG RSUD TIPE B KOTA MUNGKID MAGELANG MENGGUNAKAN PUSHOVER ANALYSIS DENGAN METODE FEMA 356 DAN ATC-40 EVALUATION OF PERFORMANCE OF TYPE B RSUD BUILDING KOTA MUNGKID MAGELANG USING PUSHOVER ANALYSIS WITH METHODS OF FEMA 356 AND ATC-40

Artanty, Sinta Dea Sri and Kurniati, Dwi (2019) EVALUASI KINERJA GEDUNG RSUD TIPE B KOTA MUNGKID MAGELANG MENGGUNAKAN PUSHOVER ANALYSIS DENGAN METODE FEMA 356 DAN ATC-40 EVALUATION OF PERFORMANCE OF TYPE B RSUD BUILDING KOTA MUNGKID MAGELANG USING PUSHOVER ANALYSIS WITH METHODS OF FEMA 356 AND ATC-40. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
SINTADEA_5150811027_ABSTRAK.pdf

Download (323kB) | Preview

Abstract

ABSTRAK RSUD Tipe B berada di Kota Mungkid Magelang salah satu Kota di provinsi Jawa Tengah. Rumah sakit sebagai salah satu sarana kesehatan yang memberikan pelayanan kesehatan kepada masyarakat memiliki peran yang sangat penting dalam meningkatan pelayanan kesehatan masyarakat. Penelitian tugas akhir dilakukan bertujuan untuk mengetahui performance point berdasarkan ATC-40, mengetahui level kinerja berdasarkan ATC-40 dan mengetahui level kinerja berdasarkan FEMA 356. Metode penelitian menggunakan respons spektrum dengan program SAP2000v14. Hasil titik kinerja pada gedung zona 1 dengan Nilai Sa = 0,665 dan Sd = 0,040 untuk push X, sedangkan nilai push Y Sa = 0,627 dan Sd = 0,057. Hasil titik kinerja pada gedung zona 2 dengan Nilai Sa = 0,635 dan Sd = 0,036 untuk push X, sedangkan nilai push Y Sa = 0,563 dan Sd = 0,065. Hasil titik kinerja pada gedung zona 3 dengan Nilai Sa = 0,636 dan Sd = 0,038 untuk push X, sedangkan nilai push Y Sa = 0,595 dan Sd = 0,055. Hasil perhitungan ATC-40 gedung zona 1, menunjukan nilai drift ratio arah x= 0,0032 dan arah y = 0,002, Pada gedung zona 2 , arah x = 0,00017 dan arah y = 0,0032. Pada gedung zona 3, arah x= 0,00083 dan arah y = 0,0018 dan berada pada level kinerja Immediate Occupancy (IO). Hasil perhitungan FEMA 356 pada gedung zona 1, menunjukkan nilai target perpindahan lateral struktur arah x = 0,0036 m, dan arah y = 0,0043 m. Pada gedung zona 2, menunjukkan nilai arah x = 0,0025 m, dan arah y = 0,0039 m. Pada gedung zona 3, menunjukkan nilai arah x = 0,004 m, dan arah y = 0,0043 m. Maka dapat disimpulkan RSUD Tipe B Kota Mungkid Magelang berada pada level kinerja Immediate Occupancy yang berarti gedung masih aman dan dapat digunakan kembali pasca gempa terjadi. Kata kunci : Pushover, ATC-40,FEMA 356, RSUD , Magelang. ABSTRACT Type B Hospital is in Mungkid City, Magelang, one of the cities in Central Java province. The hospital as one of the health facilities that provide health services to the community has a very important role in improving public health services. The final assignment research was conducted to determine the performance points based on ATC-40, determine the performance level based on ATC-40 and find out the performance level based on FEMA 356. The research method used spectrum response with the SAP2000v14 program. The results of the performance point in the zone 1 building with Sa = 0.665 and Sd = 0.040 for push X, while the push value Y = 0.627 and Sd = 0.057. The results of the performance point in zone 2 building with Sa Value = 0.635 and Sd = 0.036 for push X, while the push value Y Sa = 0.563 and Sd = 0.065. The results of the performance point in the zone 3 building with Sa = 0.636 and Sd = 0.038 for push X, while the push value Y = 0.595 and Sd = 0.055. The calculation of ATC-40 building zone 1 shows the direction of drift ratio value x = 0.0032 and direction y = 0.002, in building zone 2, direction x = 0.00017 and direction y = 0.0032. In the zone 3 building, the direction x = 0,00083 and the direction y = 0,0018 and are at the level of performance of Immediate Occupancy (IO). The results of FEMA 356 calculation in building zone 1, show the target value of lateral displacement of the direction structure x = 0.0036 m, and the direction y = 0.0043 m. In building zone 2, it shows the direction value x = 0.0025 m, and the direction y = 0.0039 m. In the zone 3 building, the direction value x = 0.004 m, and the direction y = 0.0043 m. Then it can be concluded that the Type B Hospital in Mungkid City Magelang is at the level of performance of Immediate Occupancy which means the building is still safe and can be reused after the earthquake occurs. Keywords: Pushover, ATC-40, FEMA 356, RSUD, Magelang. DAFTAR PUSTAKA Afandi Nur Rachmad, (2010). Evaluasi Kinerja Seismik Struktur Beton Dengan Analisis Pushover Menggunakan SAP2000. Applied Technology Council. (1996). Seismic Evaluation and Retrofit of Concrete Buildings. ATC 40, U.S.A.DC, Redwood City, California. ASCE, FEMA 356 – Prestandard analysis and Commentary For The seismic rehabilitation of buildings, Federal Emergency Management Agency , Washington D.C., 2000. Arifin, Zainal, (2015), Analisis Struktur Gedung POP Hotel Gempa denga Metode Pushover Analysis, JRSDD,Edisi September 2015, vol. 3, no. 3, hal:427-440 (ISSN:23030011).UniversitasLampung.Bandar Lampung. Dewobroto, Wiryanto, (2006), Evaluasi Kinerja Bangunan Baja Tahan Gempa dengan Analisa Pushover. Jurnal Teknik Sipi Vol.3 no.1 Januari 2006.Universitas Pelita Harapan, Surabaya Hidayat, Wildan, (2018), Evaluasi Kelayakan Struktur Gedung Rawat Inap RSUD Tidar Kota Magelang Dengan SNI 1726:2012, SNI 1727:2013, Dan SNI 2847:2013, Universitas Teknologi Yogyakarta, Yogyakarta. Kurniati, Dwi, (2018), Kajian Analisis Pushover Untuk Performance Based Design Pada Awana Condotel Yogyakarta, Universitas Teknologi Yogyakarta, Yogyakarta Muntafi, Yunalia, (2012), Evaluasi Kinerja Bangunan Gedung Wilayah Kabupaten Wonogiri dengan Analisi Pushover,Simponium Nasional RAPI XI FT UMS 2012.Universitas Islam Indonesia, Yogyakarta, Nahrowi, Muhkamad, (2017), Evaluasi Kinerja Bangunan Fakultas Matematia dan Ilmu Pengetahuan Universitas Gadjah Mada Terdapat Gaya Gempa dengan Analisis Pushover, Universitas Teknologi Yogyakarta, Yogyakarta. Peta Hazard Gempa Indonesia, 2017, Peta Sumber dan Bahaya Gempa Indonesia Tahn 2017, ISBN 978-602-5489-01-3 Departemen Pekerjaan Umum. Jakarta. Sulistya, Rachmat, (2015), Evaluasi Kinerja Struktur Beton Bertulang Dengan Analisis Statik Non-Linier (Pushover Analisis), Universitas Teknologi Yogyakarta, Yogyakarta. Standart Nasional Indonesia. (2002). Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung. SNI-03-247-2002. Badan Standarisasi Nasional. Bandung. Standart Nasional Indonesia. (2012). Tata Cara Perencanaan Struktur Beton Untuk Bangunan Gedung. SNI-03-247-2012. Badan Standarisasi Nasional. Bandung. Standart Nasional Indonesia. (2013). Beban Minimum Untuk Perencanaan Gedung dan Struktur Lain. SNI-1727-2013. Badan Standarisasi Nasional. Bandung.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 30 Jul 2019 07:41
Last Modified: 30 Jul 2019 07:41
URI: http://eprints.uty.ac.id/id/eprint/3142

Actions (login required)

View Item View Item