USULAN PERBAIKAN KUALITAS PRODUKSI PADA PRODUK BANTAL MENGGUNAKAN METODE NEW SEVEN TOOLS Studi Kasus : Sidodadi Bantalindo

Faizal Rizki, Muhammad and Ferida, Yuamita (2021) USULAN PERBAIKAN KUALITAS PRODUKSI PADA PRODUK BANTAL MENGGUNAKAN METODE NEW SEVEN TOOLS Studi Kasus : Sidodadi Bantalindo. Tugas Akhir thesis, University of Technology Yogyakarta.

[img]
Preview
Text
ABSTRAK 5160611042 Muhammad Faizal Rizki.pdf

Download (194kB) | Preview

Abstract

ABSTRAK Sidodadi Bantalindo merupakan UMKM (Usaha Mikro Kecil Menengah) yang memproduksi bantal dengan produksi rata-rata 3000 pcs perbulan tergantung pesanan. Sidodadi Bantalindo dalam proses produksi masih terdapat produk cacat, sehingga usulan perbaikan ini dilakukan dengan metode New Seven Tools. Dalam penelitian ini adalah data yang diproduksi pada bulan Juni, Juli, dan Agustus tahun 2020 dengan jumlah produksi 9600 pcs masih terdapat produk cacat sejumlah 414 pcs, yang dibagi menjadi 3 jenis cacat yaitu cacat pada jahitan, cacat pemotongan dan cacat proses packing. Proses penelitian ini dengan metode New Seven Tools ada tujuh tahap diantaranya Affinity Diagram, Tree Diagram, Arrow Diagram, Process Decision Program Chart (PDPC), Relationship Diagram, Matrix Diagram dan Matrix Data Analisys. Berdasarkan dari hasil pengolahan data diketahui beberapa faktor penyebab terjadinya produk cacat yaitu faktor mesin, operator dan lingkungan. Usulan perbaikan yang perlu dilakukan oleh Sidodadi Bantalindo adalahperbaikan mesin, memberikan pelatihan kepada operator, dan memberikan tempat lebih nyaman. Kata Kunci : Bantal, New Seven Tools, Produk Cacat ABSTRACT Sidodadi Bantalindo is an UMKM (Micro, Small and Medium Enterprise) that produces pillows with an average production of 3000 pcs per month depending on the order. Sidodadi Bantalindo, in the production process, still has defective products, so the proposed repair is carried out using the New Seven Tools method. In this study, data produced in June, July and August 2020 with a total production of 9600 pcs, there are still 414 defects, which are divided into 3 types of defects, namely defects in stitches, cutting defects and defects in the packing process. The research process with the New Seven Tools method consists of seven stages including Affinity Diagrams, Tree Diagrams, Arrow Diagrams, Process Decision Program Charts (PDPC), Relationship Diagrams, Matrix Diagrams and Matrix Data Analysis. Based on the results of data processing, it is known that several factors cause the occurrence of defective products, namely machine, operator and environmental factors. The suggested improvements that need to be done by Sidodadi Bantalindo are repairing machines, providing training to operators, and providing a more comfortable place. Keywords: Pillows, New Seven Tools, Defective Products

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 09 Apr 2021 07:59
Last Modified: 09 Apr 2021 07:59
URI: http://eprints.uty.ac.id/id/eprint/7371

Actions (login required)

View Item View Item