ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BETON (Studi Kasus: Pembangunan Gedung P3i UGM) ANALYSIS OF FACTORS AFFECTING LABOR PRODUCTIVITY ON CONCRETE STRUCTURE WORK (Case Study: UGM P3i Building Construction)

Nauw, Philipus abah and Susilo, Dibyo (2022) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN STRUKTUR BETON (Studi Kasus: Pembangunan Gedung P3i UGM) ANALYSIS OF FACTORS AFFECTING LABOR PRODUCTIVITY ON CONCRETE STRUCTURE WORK (Case Study: UGM P3i Building Construction). Tugas Akhir thesis, University Technology Yogyakarta.

[img] Text
5150811111_PHILIPUS ABAH NAUW_abstrak - Philip nauw.pdf

Download (13kB)

Abstract

Indonesia merupakan negara berkembang yang tidak lepas dari pembangunan dan pengembangan bidang, salah satunya adalah pembangunan dan pengembangan sektor usaha konstruksi. Dalam upaya untuk mengatur atau memanajemen penggunaan sumberdaya manusia agar realistis. Maka seorang kontraktor pelaksanaan harus mengetahui tingkat produktivitas tenaga kerja. Produktivitas pekerja sebagai suatu ukuran apakah proyek dilaksanakan secara efektif atau tidak, mutlak untuk diperhatikan kecenderungan yang terjadi penggunaan alat teknologi yang sama antara satu kontraktor dan kontraktor lainnya. Yang membuat faktor produktivitas ini menjadi faktor penting untuk meningkatkan daya saing pada kontraktor tersebut. Dalam tugas akhir ini, penulis akan menganalisa faktor-faktor yang mempengaruhi produktivitas tenaga kerja Untuk Mengetahui level kinerja pada bangunan.proyek yang dianalisa yaitu proyek Pembangunan Gedung P3i UGM. Berdasarkan hasil analisis software SPSS V.22 didapatkan hasil produktivitas kerja pada tenaga tukang beton aktual dan produktivitas tenaga kerja tukang beton pada SNI 2016. Dimana dapat di lihat bahwa produktivitas tenaga kerja aktual lebih besar dari pada tenaga kerja SNI 2016. Faktor-faktor yang mempengaruhi produktivitas tenaga kerja tukang beton diantaranya umur, upah, pengalaman, motivasi dan cuaca. Nilai upah pekerja tertinggi yang dihasilkan yaitu Rp9.570.944 untuk Pekerjaan pembesian kolom2,3,4. Rp3.268.092 untuk Pekerjaan pembesian balok 2,3, dan Rp3.363.237 untuk Pekerjaan pemasangan bekisting 2,3,4. Kata kunci : Produktivitas Kerja, Produktivitas Tenaga Kerja, Analisis Produktivitas Indonesia is a developing country that cannot be separated from the development and development of fields, one of which is the construction and development of the construction business sector. To regulate or manage the use of human resources to be realistic. So an implementation contractor must know the level of labor productivity. Worker productivity as a measure of whether the project is implemented effectively or not, it is necessary to pay attention to the trend that occurs in the use of the same technology tool between one contractor and another contractor. What makes this productivity factor an essential factor to increase the competitiveness of the contractor. In this final project, the author will analyze the factors that affect labor productivity to determine the level of performance in the building. The project being analyzed is the UGM P3i Building Construction project. Based on the results of the SPSS V.22 software analysis, the actual work productivity of the concrete masons and the productivity of the concrete masons in SNI 2016. It can be seen that the actual labor productivity is greater than the SNI 2016 workforce. Factors that influence The productivity of concrete masons include age, wages, experience, motivation, and weather. The highest worker wages produced are 9.570,944 IDR for columns 2,3,4 ironwork. 3.268.092 IDR for 2,3,4 beam reinforcement work, and 3.363.237 IDR for 2,3,4 formwork installation work. Keywords: Work Productivity, Labor Productivity, Productivity Analysis

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 21 Oct 2022 08:13
Last Modified: 21 Oct 2022 08:13
URI: http://eprints.uty.ac.id/id/eprint/11051

Actions (login required)

View Item View Item