PENGUKURAN EFEKTIVITAS MESIN REPARASI TABUNG GAS MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN OVERALL RESOURCE EFFECTIVENESS (ORE) Studi Kasus PT Petrogas Prima Service

Dwi Putra, Toni and Suseno, Suseno (2022) PENGUKURAN EFEKTIVITAS MESIN REPARASI TABUNG GAS MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN OVERALL RESOURCE EFFECTIVENESS (ORE) Studi Kasus PT Petrogas Prima Service. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5180611094 Toni Dwi Putra.pdf

Download (69kB)

Abstract

PENGUKURAN EFEKTIVITAS MESIN REPARASI TABUNG GAS MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN OVERALL RESOURCE EFFECTIVENESS (ORE) Studi Kasus PT Petrogas Prima Service Toni Dwi Putra 1, Suseno2 1 tonidwiputra.04@gmail.com , 2 Suseno@uty.ac.id 1, Program Studi Teknik Industri, Fakultas Sains & Teknologi Universitas Teknologi Yogyakarta ABSTRAK PT Petrogas Prima Service merupakan perusahaan yang bergerak dalam bidang perbaikan dan perawatan tabung gas LPG 3kg. Permasalahan yang terjadi pada perusahaan adalah terjadinya penurunan kinerja mesin dikarenakan telah berumur 12 tahun, selain itu umur mesin yang sudah tua mengakibatkan time losses (waktu kerja efektif yang hilang akibat kerusakan dan perawatan mesin), dimana line 2 merupakan line yang memiliki time losses tertinggi selama 6 bulan terakhir, yaitu sebesar 435 menit. Berdasarkan masalah tersebut maka perlu dilakukan pengukuran efektivitas mesin guna mengetahui seberapa efektif mesin yang ada pada line 2. Adapun metode yang dipakai untuk melakukan pengukuran efektivitas mesin yaitu metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE). Adapun hasil dari metode Overall Equipment Effectiveness (OEE) yaitu menunjukkan tingkat efektivitas mesin open valve sebesar 99,34%, press hand 99,29%, hidrostatik 88,31%, numbering 99,11%, shot blasting 84,95%, painting 80,22% dan close valve 91,28%. Adapun hasil pengukuran efektivitas mesin menggunakan metode Overall Resource Effectiveness (ORE) untuk mesin open valve sebesar 99,32%, press hand 99,23%, hidrostatik 87,35%, numbering 98,97%, shot blasting 84,83%, painting 80,16% dan close valve 91,23%. Berdasarkan dua metode yang digunakan diketahui bahwa pada line 2 mesin shot blasting dan painting belum memenuhi standar OEE dan ORE sebesar 85%, adapun faktor yang mempengaruhi yaitu idling and minor stoppage losses, dimana waktu setup merupakan kegiatan yang mempengaruhi tingginya nilai idling and minor stoppage losses. Kata Kunci: Efektivitas Mesin, Overall Equipment Effectiveness, Overall Resource Effectiveness, Time Losses   MEASUREMENT OF THE EFFECTIVENESS OF GAS TUBE REPAIR MACHINE USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND OVERALL RESOURCE EFFECTIVENESS (ORE) METHODS Case Study of PT Petrogas Prima Service ABSTRACT PT Petrogas Prima Service is a company engaged in repairing and maintaining 3kg LPG gas cylinders. The problem that occurs in the company is a decrease in engine performance because it is 12 years old. Besides that, the age of the old engine results in time losses (adequate working time lost due to engine damage and maintenance), where line 2 is the line that has the highest time losses during the last six months, which is 435 minutes. Based on this problem, it is necessary to measure the effectiveness of the machine in order to find out how effective the machine is on line 2. The methods used to measure the effectiveness of the machine are the Overall Equipment Effectiveness (OEE) and Overall Resource Effectiveness (ORE) methods. The Overall Equipment Effectiveness (OEE) method results show the effectiveness of the open valve machine at 99.34%, hand press at 99.29%, hydrostatic at 88.31%, numbering 99.11%, shot blasting at 84.95%, painting at 80.22%, and close valve 91.28%. The results of measuring the effectiveness of the machine using the Overall Resource Effectiveness (ORE) method for open valve machines are 99.32%, hand press 99.23%, hydrostatic 87.35%, numbering 98.97%, shot blasting 84.83%, painting 80.16%, and close valve 91.23%. Based on the two methods used, it is known that on line 2, the shot blasting and painting machines do not meet the OEE and ORE standards of 85%, while the influencing factors are idling and minor stoppage losses, where setup time is an activity that affects the high value of idling and minor stoppage losses. Keywords: Machine effectivity, Overall Equipment Effectiveness, Overall Resource Effectiveness, Time Loss DAFTAR PUSTAKA Anshori, A. (2020). Analisis Perhitungan Efektivitas Pada Mesin Ryoby Untuk Meningkatkan Produktivitas dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses di CV. Kyta Jaya Mandiri. 4(1), 1–9. Aprina, B. (2019). Analisa Overall Resource Effectiveness Untuk Meningkatkan Daya Saing dan Operational Excellance. JITMI (Jurnal Ilmiah Teknik Dan Manajemen Industri), 2. Aulia, R. S., Novareza, O., Sulistyarini, D. H., Industri, J. T., Teknik, F., Brawijaya, U., & Pendahuluan, I. (2017). Pengukuran Nilai OEE dan ORE sebagai Dasar Perbaikan Efektivitas Produksi Filter Rokok Mono Jenis A. 2017, 4–6. Beatrix, M. E., Kartika, H., & Sunardiyanta. (2020). Analysis of Effectiveness Measurement of Stretch Blow Machine Using Overall Equipment Effectiveness (OEE) Method. International Journal of Advances in Scientific Research and Engineering, 06(08), 131–137. https://doi.org/10.31695/ijasre.2020.33865 Eswaramurthi, K. G., & Mohanram, P. V. (2013). Improvement of manufacturing performance measurement system and evaluation of overall resource effectiveness. American Journal of Applied Sciences, 10(2), 131–138. https://doi.org/10.3844/ajassp.2013.131.138 Febriyanti, D., & Fatma, E. (2018). Analisis Efektivitas Mesin Produksi Menggunakan Pendekatan Failure and Mode Effect Analysis dan Logic Tree Analysis. JIEMS (Journal of Industrial Engineering and Management Systems), 11(1), 39–47. https://doi.org/10.30813/jiems.v11i1.1015 Gorapetha, W., Hutabarat, J., & Salmia, L. a. (2020). Effectiveness Untuk Meminimumkan Nilai Six Big Losses Di Mesin Produksi Dan Usulan Perbaikan Dengan Metode Kaizen 5S Di Cv. Jurnal Valtech, 3(2), 219–225. https://ejournal.itn.ac.id/index.php/valtech/article/view/2767 Hamda, P. (2018). Analisis Nilai Overall Equipment Effectiveness (Oee) Untuk Meningkatkan Performa Mesin Exuder Di Pt Pralon. Jurnal Ilmiah Teknologi Dan Rekayasa, 23(2), 112–121. https://doi.org/10.35760/tr.2018.v23i2.2461 Irsan. (2018). Integrasi Overall Equipment Effectiveness (Oee) Dan Failure Mode and Effect Analysis (Fmea) Untuk Meningkatan Efektifitas Mesin Hammer Mill Di Pt. Jurnal Optimalisasi, 4(7), 97–107. http://jurnal.utu.ac.id/joptimalisasi/article/view/1524/1220 Kurniawati, G., Putri, H., Astuti, R. D., & Suhardi, B. (2017). Perhitungan Tingkat Efektivitas Mesin Tsudakoma dengan Menggunakan Metode Overall Equipment Effectiveness ( OEE ) ( Study kasus PT . XYZ ). Seminar Nasional Teknik Industri Universitas Gadjah Mada 2017, November, 50–59. Maulana, F. E., Atmaji, F. T. D., & Pamoso, A. (2020). Usulan Penerapan Total Productive Maintenance (TPM) Office Menggunakan Overall Resource Equipment (ORE) Untuk Mesin Air Jet Loom (AJL). 13–18. Nurwulan, N. R., & Fikri, D. K. (2020). Analisis Produktivitas dengan Metode OEE dan Six Big Losses: Studi Kasus di Tambang Batu Bara. Jurnal IKRA-ITH Ekonomika, 3(3), 30–35. Purwanto, C., & Jaqin, C. (2021). Improving curing process productivity in the tire industry using OEE, TPM and FMEA methods. Proceedings of the International Conference on Industrial Engineering and Operations Management, Figure 1, 6709–6715. Puspita, L. E., & Widjajati, P. (2021). Pengukuran Efektivitas Mesin Latexing pada Produksi Karpet Permadani dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE) di PT. XYZ. In Juminten : Jurnal Manajemen Industri dan Teknologi (Vol. 02, Issue 04). Rahman, A., & Perdana, S. (2019). Analisis Produktivitas Mesin Percetakan Perfect Binding Dengan Metode Oee Dan Fmea. Jurnal Ilmiah Teknik Industri, 7(1), 34–42. https://doi.org/10.24912/jitiuntar.v7i1.5034 Ramadhan, F. N., Budiasih, E., & Pamoso, A. (2021). Evaluasi Efektivitas Pemanfaatan Mesin CNC HURCO dengan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE). 8(5). Saharani, I., & Sukanta, S. (2021). Analisis Efektifitas Mesin Pewarna Serat Optik Dengan Metode Overall Equipment Effectiveness (OEE) (Studi Kasus PT. Voksel Electric Tbk.). STRING (Satuan Tulisan Riset Dan Inovasi Teknologi), 5(3), 263. https://doi.org/10.30998/string.v5i3.8531 Sayuti, M., & Maulinda, S. (2019). Analisis Efektivitas Gas Turbine Generator dengan Metode Overall Equipment Effectiveness. Jurnal INTECH Teknik Industri Universitas Serang Raya, 5(1), 7. https://doi.org/10.30656/intech.v5i1.1463 Sultoni, A., & Saroso, D. S. (2019). Peningkatan nilai OEE pada mesin printing kaca film menggunakan metode FMEA dan TPM. Operations Excellence: Journal of Applied Industrial Engineering, 11(2), 131. https://doi.org/10.22441/oe.v11.2.2019.022 Syaputra, M. J., Utomo, U., & Rimawan, E. (2020). Analisa Kinerja Mesin Kemas Primer, Dengan Metode Overall Equipment Effectiveness (Oee) Di Sebuah Industri Farmasi. Journal Industrial Servicess, 5(2), 143–146. https://doi.org/10.36055/jiss.v5i2.8003 Wibisono, D. (2021). Analisis Overall Equipment Effectiveness (OEE) Dalam Meminimalisasi Six Big Losses Pada Mesin Bubut (Studi Kasus di Pabrik Parts PT XYZ). Jurnal Optimasi Teknik Industri (JOTI), 3(1), 7–13. https://doi.org/10.30998/joti.v3i1.6130 Zulfatri, M. M., Alhilman, J., & Atmaji, F. T. D. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Pada Mesin Pl1250 Di Pt Xzy. JISI: Jurnal Integrasi Sistem Industri, 7(2), 123. https://doi.org/10.24853/jisi.7.2.123-131

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 01 Dec 2022 08:40
Last Modified: 01 Dec 2022 08:40
URI: http://eprints.uty.ac.id/id/eprint/11319

Actions (login required)

View Item View Item