ANALISA KEBUTUHAN AIR BERSIH DAN AIR BUANGAN Studi Kasus : Proyek Pembangunan Pondok Pesantren Muallimin Muhammadiyah ANALYSIS OF CLEAN WATER AND WASTEWATER NEEDS Case Study: Development Project Muallimin Muhammadiyah Islamic Boarding School

Winata, Surya Adi and Hendrasari, Ratna Septi (2022) ANALISA KEBUTUHAN AIR BERSIH DAN AIR BUANGAN Studi Kasus : Proyek Pembangunan Pondok Pesantren Muallimin Muhammadiyah ANALYSIS OF CLEAN WATER AND WASTEWATER NEEDS Case Study: Development Project Muallimin Muhammadiyah Islamic Boarding School. Tugas Akhir thesis, University Technology Yogyakarta.

[img] Text
5170811349_SURYA ADI WINATA - Surya Psht.pdf

Download (11kB)

Abstract

ANALISA KEBUTUHAN AIR BERSIH DAN AIR BUANGAN Studi Kasus : Proyek Pembangunan Pondok Pesantren Muallimin Muhammadiyah The construction of the Mualimin Islamic Boarding School consists of 4 floors with 969,085 m2. To support its capacity and function, a supply of good quality and quantity of water and unimpeded disposal of dirty water is necessary. It aims to provide satisfaction and comfort for the residents of the Mualimin Islamic Boarding School Flats. In this study, the calculation of the need for clean water and the volume of wastewater in Islamic boarding schools was carried out by referring to books, journals, and related regulations. Calculation of clean water needs is based on the number of residents and visitors at the Islamic boarding school. After obtaining the need for clean water, it can then be calculated the capacity of the reservoir and topwater tank, the volume of wastewater, and the volume of the septic tank. After calculating the results, the result is that the amount of clean water needed per day is 37,182 m/day, the average water usage per hour is 4.64775 m³/hour, the water usage at peak hours is 9.2955 m³/hour, and the water usage is in minutes. Peak is 0.61925 m³/min. The reservoir volume is 127.144 m, and the volume of the upper water tank is 10.3209 m. The volume of wastewater per day is 29.7456 m³/day, and the required volume of a septic tank is 29.76721 m3/day. Keywords: Clean Water, Waste Water, Islamic Boarding School, Septic Tank, Water Tank.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 27 Dec 2022 03:20
Last Modified: 27 Dec 2022 03:20
URI: http://eprints.uty.ac.id/id/eprint/11920

Actions (login required)

View Item View Item