Ariana, Duta and Suseno, Suseno (2023) ANALISIS MANAJEMEN PERSEDIAAN BAHAN DENGAN MATERIAL REQUIREMENTS PLANNING METODE LOT SIZING Studi Kasus : PT Madubaru PG Madukismo. ["eprint_fieldopt_thesis_type_tugasakhir" not defined] thesis, University of Technology Yogyakarta.
Text
5180611037 DUTA ARIANA-ABSTRAK.pdf Download (81kB) |
Abstract
ANALISIS MANAJEMEN PERSEDIAAN BAHAN DENGAN MATERIAL REQUIREMENTS PLANNING METODE LOT SIZING Studi Kasus : PT Madubaru PG Madukismo Abstrak PT Madubaru PG Madukismo merupakan salah satu perusahaan gula yang ada di padokan, Tirtonirmolo, Kasihan, Bantul, Yogyakarta. Dalam kebutuhan produksinya dalam sekali proses mesin produksi mencakup kapasitas 30.000 Kwintal per harinya. Kebutuhan gula untuk konsumen perbulan sebanyak 11.816 ton dengan tebu sebanyak 164.165 ton, namun karena PT Madubaru Madukismo memiliki lahan yang terbatas hanya tersedia 230.000 ton maka perusahaan mengambil dari para petani langsung untuk memenuhi kapasitas produksinya. Dalam 1 truk rata rata dapat memuat sebesar 56 kwintal/truk itu pun tergantung pada kondisi truk dan kondisi tebu. pada bulan Juni sampai November 2022 mengalami kekurangan stok bahan baku sebanyak 754.990 Ton dan kekurangan bahan tambahan sebanyak 301.595 liter pada bulan Juni sampai November dari kebutuhan pemakaian 361.914 liter. Maka menggunakan teknik teknik dalam Material Requirement Planning dapat digunakan dalam merencanakan jumlah dan penjadwalan kebutuhan bahan baku dalam perusahaan, karena dapat menghasilkan dua keputusan yang sangat penting yaitu berupa banyak yang akan dipesan dan kapan saat yang tepat untuk melakukan pemesanan. Teknik yang dapat digunakan untuk penjadwalan bahan baku, salah satunya dengan menggunakan metode Material Requirement Planning ( MRP ) atau sistem perencanaan persediaan bahan baku, Economic Order Quantity (EOQ) dan Period Order Quantity (POQ) dimana dari metode tersebut mana yang lebih efektif untuk menentukan penjadwalan bahan baku kedepan. Kata kunci: Perencanaan bahan baku, Lot Sizing, MRP, EOQ dan POQ. MATERIAL INVENTORY MANAGEMENT ANALYSIS USING MATERIAL REQUIREMENTS PLANNING LOT SIZING METHOD Case Study: PT Madubaru PG Madukismo ABSTRACT PT Madubaru PG Madukismo is a sugar company with locations in Padokan, Tirtonirmolo, Kasihan, Bantul, and Yogyakarta. Its production requirements are met by a single production machine process with a capacity of 30,000 Kwintal per day. The monthly sugar requirement for consumers is 11,816 tons, with 164,165 tons of sugar cane available, but because PT Madubaru Madukismo has limited land available (only 230,000 tons), the company purchases directly from farmers to match its production capacity. In 1 truck, the average can load 56 quintals / truck it also depends on the condition of the truck and the condition of the sugar cane. in June to November 2022 experienced a shortage of raw material stock of 754,990 tons and a shortage of additional material of 301,595 liters in June to November from the required usage of 361,914 liters. So Material Requirement Planning techniques can be used to plan the amount and timing of raw material demands in the organization, because it can create two very essential judgments, namely how much to order and when is the best time to make an order. Techniques for scheduling raw materials include the Material Requirement Planning (MRP) method or raw material inventory planning system, Economic Order Quantity (EOQ), and Period Order Quantity (POQ). These methods is more effective for determining future raw material scheduling. Keywords: Raw material planning, Lot Sizing, MRP, EOQ and POQ.
Item Type: | Thesis (["eprint_fieldopt_thesis_type_tugasakhir" not defined]) |
---|---|
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Industri |
Depositing User: | Kaprodi S1 Teknik Industri UTY |
Date Deposited: | 28 Nov 2023 04:11 |
Last Modified: | 28 Nov 2023 04:11 |
URI: | http://eprints.uty.ac.id/id/eprint/14184 |
Actions (login required)
View Item |