Huijanah, Igga Amalia Mifta and Asyifa, Adwiyah (2022) PERBAIKAN TANAH DASAR DAN LERENG TIMBUNAN REKLAMASI MENGGUNAKAN METODE VACUUM PRE-LOADING REPAIR OF SUBGRADE AND RECLAMATION EMBANKMENT SLOPES USING THE VACUUM PRE-LOADING METHOD. Tugas Akhir thesis, University Technology Yogyakarta.
Text
5180811089_IGGA AMALIA MIFTA HUIJANAH_abstrak - Igga Amalia.pdf Download (27kB) |
Abstract
Baoshen Science & Applied Technologies Co., Ltd (BSN) merupakan sebuah perusahaan asal China yang memproduksi bahan kemasan untuk produk garmen seperti sepatu, pakaian, tas, produk furnitur, komestik, dan lain sebagainya. Di bawah nama PT. BSN Technologies Indonesia (BTI) membangun pabrik pertama di Indonesia yang berada di Kawasan Industri Kendal (KIK). Baoshen Science & Applied Technologies Co., Ltd (BSN) memperluas bisnisnya dengan membangun pabrik pertama di Indonesia di bawah nama PT BSN Technologies Indonesia (BTI).Lokasi pembangunan pabrik memiliki tanah dasar yang lunak (N-SPT <10) sehingga perlu dilakukan perbaikan tanah. Metode perbaikan tanah lunak yang akan digunakan dalam Tugas Akhir ini adalah vacuum pre-loading. Selain menggunakan metode vacuum pre-loading, dalam merencanakan perbaikan tanah dasar akan digunakan Prefabricated Vertical Drain (PVD) dengan pola pemasangan segitiga. Dalam melakukan perencanaan Tugas Akhir ini, metode yang digunakan untuk menganalisis stabilitas lereng timbunan adalah dengan menggunakan program bantu GeoStudio dan perkuatan lereng menggunakan geotextile. Berdasarkan metode perbaikan tanah lunak tersebut, dapat diambil beberapa kesimpulan dan biaya material yang dibutuhkan berdasarkan perhitungan perencanaan. Berdasarkan hasil perhitungan dalam Tugas Akhir ini, dalam melakukan perbaikan tanah lunak untuk mencapai elevasi rencana timbunan setinggi 3 m dengan metode vacuum pre-loading menggunakan PVD pola segitiga dengan jarak 1,5 m sepanjang 46.136 m. Kebutuhan material dalam pekerjaan timbunan membutuhkan tanah timbunan sebanyak 217.632 m3. Kebutuhan geotextile sebanyak 3 lapis pada sisi kanan dan kiri lereng timbunan dengan perhitungan total adalah 6.664 m2, membutuhkan lapis kedap (geomembrane) sebanyak 38.794 m2 dengan total biaya material sebesar Rp 33.382.494.322 Kata kunci: Vacuum pre-loading, settlement, geotextile, PVD, GeoStudio Baoshen Science & Applied Technologies Co., Ltd (BSN) is a Chinese company that produces packaging materials for garment products such as shoes, clothes, bags, furniture products, cosmetics, and so on. Under the name of PT. BSN Technologies Indonesia (BTI) built the first factory in Indonesia which is located in the Kendal Industrial Estate (KIK). Baoshen Science & Applied Technologies Co., Ltd (BSN) expanded its business by building the first factory in Indonesia under the name PT BSN Technologies Indonesia (BTI). soil. Soft soil improvement method that will be used in this final project is vacuum pre-loading. In addition to using the vacuum pre-loading method, in planning for subgrade improvement, Prefabricated Vertical Drain (PVD) with a triangular installation pattern will be used. In planning this final project, the method used to analyze the stability of embankment slopes is to use the GeoStudio program and slope reinforcement using geotextiles. Based on the soft soil improvement method, several conclusions can be drawn and the material costs needed are based on planning calculations. Based on the results of the calculations in this final project, in carrying out the repair of soft soil to achieve a planned embankment elevation of 3 m by vacuum pre-loading method using PVD triangular pattern with a distance of 1.5 m along 46,136 m. Material requirements for embankment work require 217,632 m3 of embankment soil. The need for 3 layers of geotextile on the right and left sides of the embankment slope with a total calculation of 6,664 m2, requires a geomembrane of 38,794 m2 with a total material cost of Rp. 33,382,494,322 Keywords: Vacuum pre-loading, settlement, geotextile, PVD, GeoStudio
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
Depositing User: | Kaprodi S1 Teknik Sipil UTY |
Date Deposited: | 07 Dec 2023 03:18 |
Last Modified: | 07 Dec 2023 03:18 |
URI: | http://eprints.uty.ac.id/id/eprint/14393 |
Actions (login required)
View Item |