ANALISIS PENEREPAN METODE FORECASTING DAN AGREGAT PLANNING UNTUK MEMINIMASI BIAYA PRODUKSI RODA KARET R 300 PADA CV BAJA MAKMUR 2

Mahendra, Dimas Ihza and Setiafindari, Widya (2023) ANALISIS PENEREPAN METODE FORECASTING DAN AGREGAT PLANNING UNTUK MEMINIMASI BIAYA PRODUKSI RODA KARET R 300 PADA CV BAJA MAKMUR 2. Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5190611197 Dimas Ihza Mahendra-ABSTRAK.pdf

Download (205kB)

Abstract

ANALISIS PENEREPAN METODE FORECASTING DAN AGREGAT PLANNING UNTUK MEMINIMASI BIAYA PRODUKSI RODA KARET R 300 PADA CV BAJA MAKMUR 2 ABSTRAK CV Baja Makmur 2 merupakan perusahaan yang bergerak dibidang pengecoran logam, salah satu produk yang dihasilkan perusahaan adalah produk roda karet dimana produk roda karet memiliki beberapa jenis diantaranya R 100, R150, R 300, R 500, R750, dan R 1000. Pada produksi roda karet R 300 ditemukan permasalahan dimana tingkat rata-rata produksi lebih tinggi sekitar 979 pcs dibandingkan rata-rata permintaan yang hanya 940 pcs, hal ini dapat menyebabkan pembengkakan pada biaya produksi yang dikeluarkan perusahaan. Tujuan dari penelitian ini adalah untuk meminimasi biaya produksi roda karet R 300 untuk 12 bulan ke depan, dengan menggunakan metode Forecasting untuk meramalkan jumlah permintaan dan Agregat Planning untuk meminimumkan biaya produksi. Hasil penelitian ini menunjukan, metode Forecasting menggunakan ARIMA didapatkan model terbaik yaitu (0,1,1) dengan nilai MSE 40969,4. Pada metode Agregat Planning menggunakan Level Method biaya produksi yang paling minimum untuk 12 periode ke depan sekitar Rp 258.802.500. Kata Kunci : Peramalan, ARIMA, Agregat Planning, Level Strategy, Chase Method   ANALYSIS OF THE APPLICATION OF FORECASTING AND AGGREGATE PLANNING METHODS TO MINIMIZE THE PRODUCTION COST OF R 300 RUBBER WHEELS AT CV BAJA MAKMUR 2 ABSTRACT CV Baja Makmur 2 is a metal casting company that produces rubber wheel goods. Rubber wheel products come in various sizes, including R 100, R150, R 300, R 500, R750, and R 1000. A fault was discovered in the production of R 300 rubber wheels, where the average production level was higher at roughly 979 pcs compared to the average demand of just 940 pcs, which could increase the company's production expenses. This research aims to reduce the manufacturing cost of R 300 rubber wheels over the next 12 months by using the Forecasting method to estimate demand and Aggregate Planning to reduce production costs. According to the findings of this study, the Forecasting approach employing ARIMA produced the best model, namely (0,1,1) with an MSE value of 40969.4. The minimum production cost for the following 12 periods in the Aggregate Planning technique utilizing the Level technique is approximately Rp 258,802,500. Keywords: Forecasting, ARIMA, Aggregate Planning, Level Strategy, Chase Method

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 08 Dec 2023 03:25
Last Modified: 08 Dec 2023 03:25
URI: http://eprints.uty.ac.id/id/eprint/14430

Actions (login required)

View Item View Item