Ramadhan, Rifqi Naufal and Ismaili, Abul Fida (2023) IMPLEMENTASI BIM AUTODESK INFRAWORKS PADA PERENCANAAN GEOMETRIK DAN PERKERASAN JALAN (STUDI KASUS RUAS JALAN TEPUS-JERUKWUDEL KM 12+700 - KM 15+200) IMPLEMENTATION OF BIM AUTODESK INFRAWORKS IN GEOMETRIC AND ROAD PAVEMENT PLANNING (CASE STUDY OF THE TEPUS-JERUKWUDEL ROAD SECTION KM 12+700 - KM 15+200). Tugas Akhir thesis, University Of Technology Yogyakarta.
|
Text
5190811153_RIFQI NAUFAL RAMADHAN_ABSTRAK DONE.pdf Download (37kB) |
Abstract
Perkembangan kemajuan teknologi informasi saat ini berkembang dengan cepat di berbagai bidang, tidak terkecuali perkembangan teknologi informasi pada bidang konstruksi. melihat kondisi tersebut peluang digunakannya teknologi Building Information Modelling (BIM) dalam proyek pembangunan jalan digunakan untuk meningkatkan efisiensi, produktifitas, dan kemudahan konstruksi. Software Autodesk Infraworks merupakan salah satu software yang mengadaptasi BIM yang dapat memodelkan, menganalisis, dan memvisualisasikan konsep desain perencanaan. Penelitian ini bertujuan untuk mengimplementasi BIM pada perencanaan geometrik jalan, serta merencanakan tebal perkerasan. metode analisa menggunakan BIM software Autodesk Infraworks untuk merencanakan geometrik jalan dan volume galian dan timbunan yang mengacu pada pedoman desain geometrik jalan tahun 2021, serta merencanakan tebal perkerasan lentur mengacu pada manual desain perkerasan tahun 2017. Penelitian ini menghasilkan trase sepanjang 6,1500 km, untuk ruas jalan berdasarkan studi kasus menghasilkan trase sepanjang 2,500 km dengan kecepatan rencana adalah 60 km/jam, pada alinyemen horizontal terdapat 5 tikungan yang terdiri dari 5 tikungan SCS, terdapat total 5 titik perpotongan vertical (PVI) dengan 3 lengkung PVI cembung dan 2 lengkung PVI cekung dengan kemiringan maksimal 8%, kebutuhan volume galian pada lokasi studi sebesar 779173,587 m3 dan volume timbunan sebesar 263416,830 m3 dengan selisih lebih banyak volume galian sebesar 515756,757 m3. Sedangkan untuk tebal perkerasan lentur didapatkan untuk lapisan fondasi kelas A setebal 15 cm, AC-Base setebal 8 cm, AC-BC setebal 6 cm, dan AC-WC setebal 4 cm. Implikasi dari temuan ini diharapkan dapat digunakan sebagai acuan dalam perencanaan jalan dan perkerasan jalan pada proyek-proyek masa depan. Kata kunci: Autodesk Infraworks, BIM, Geometrik Jalan Raya, Perkerasan Jalan. The development of information technology advances is currently growing rapidly in various fields, including the development of information technology in the construction sector. Seeing these conditions, there is an opportunity to use Building Information Modeling (BIM) technology in road construction projects to increase efficiency, productivity and ease of construction. Autodesk Infraworks software is a software that adapts BIM which can model, analyze and visualize planning design concepts. This research aims to implement BIM in road geometric planning, as well as planning pavement thickness. The analysis method uses Autodesk Infraworks BIM software to plan road geometrics and the volume of excavation and embankment referring to the 2021 road geometric design guidelines, as well as planning flexible pavement thickness referring to the manual pavement design in 2017. This research produces a 6,1500 km long alignment, for the road section based on the case study it produces a 2,500 km long track with a design speed of 60 km/hour, in the horizontal alignment there are 5 bends consisting of 5 SCS bends, there are a total of 5 points of vertical intersection (PVI) with 3 convex PVI curves and 2 concave PVI curves with a maximum slope of 8%, the excavation volume requirement at the study location is 779,173,587 m3 and the embankment volume is 263,416,830 m3 with a difference of more excavation volume of 515,756 ,757 m3. Meanwhile, the thickness of the flexible pavement was found to be 15 cm thick for the class A foundation layer, 8 cm thick for AC-Base, 6 cm thick for AC-BC, and 4 cm thick for AC-WC. It is hoped that the implications of these findings can be used as a reference in planning roads and road pavement in future projects. Keywords: Autodesk Infraworks, BIM, Highway Geometrics, Road Pavement.
| Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
| Depositing User: | Kaprodi S1 Teknik Sipil UTY |
| Date Deposited: | 19 Jun 2026 02:32 |
| Last Modified: | 19 Jun 2026 02:32 |
| URI: | http://eprints.uty.ac.id/id/eprint/20052 |
Actions (login required)
![]() |
View Item |
