PERBANDINGAN BIAYA TENAGA KERJA BORONGAN TERHADAP PERATURAN KEMENTRIAN PEKERJAAN UMUM NO. 28 TAHUN 2016 PADA PEKERJAAN PENULANGAN DAN PENGECORAN BALOK COMPARISON BETWEEN FIXED LUMP SUM PRICE AND REGULATION OF THE MINISTRY OF PUBLIC WORK NO. 28 OF 2016 IN BEAMING AND CASTING WORK

Wibowo, Fajar Khoni and Bhaskara, Adwitya (2020) PERBANDINGAN BIAYA TENAGA KERJA BORONGAN TERHADAP PERATURAN KEMENTRIAN PEKERJAAN UMUM NO. 28 TAHUN 2016 PADA PEKERJAAN PENULANGAN DAN PENGECORAN BALOK COMPARISON BETWEEN FIXED LUMP SUM PRICE AND REGULATION OF THE MINISTRY OF PUBLIC WORK NO. 28 OF 2016 IN BEAMING AND CASTING WORK. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5150811145_Fajar Khoni Wibowo.pdf

Download (17kB) | Preview

Abstract

ABSTRAK Perkembangan proyek konstruksi saat ini menjadikan suatu proyek semakin kompleks, dimana dalam pelaksanaa proyek membutuhkan manajemen sumber daya yang baik untuk penyelesaian dari awal hingga akhir suatu proyek. Tentunya dalam melakukan sebuah percepatan proyek harus dengan seefisien mungkin dari segi waktu maupun biaya tanpa mengabaikan standar mutu atau kualitas proyek yang telah ditentukan. Tujuan dari penelitian ini adalah untuk membandingkan biaya pelaksanaan penulangan dan pengecoran pada balok dengan membandingkan antara perhitungan borongan dan Peraturan Kementrian Pekerjaan Umum No. 28 tahun 2016. Efisiensi biaya pada suatu proyek pembangunan adalah hal yang sangat penting, maka dari itu penelitian ini di tujukan untuk mengetahui perbandingan antara perhitungan tersebut. Dari hasil peneliitan ini untuk pekerjaan penulangan terdapat selisih biaya yang cukup signifikan untuk upah borongan Rp. 237.657.456,00 dan dari Peraturan Kementrian Pekerjaan Umum No. 28 Tahun 2016 Rp. 249.246.648,00 dengan demikian dapat di hitung selisih sebesar Rp. 11.589.192,00. Dan adapun untuk pekerjaan pengecoran terdapat selisih biaya yang cukup signifikan untuk upah borongan Rp. 76.395.788,00 dan untuk Peraturan Kementrian Pekerjaan Umum No. 28 Tahun 2016 Rp. 83.942.663,00 dengan demikian dapat di hitung selisih sebesar Rp. 7.546.875,00. Kata kunci : Perbandingan, Biaya, Tenaga Kerja, Borongan, Terhadap, Peraturan Kementrian Pekerjaan Umum No 28 Tahun 2016. ABSTRACT The development of construction projects now makes a project more complex, where the implementation of projects requires good management of resources for completion from the beginning to the end of a project. Of course, in making an acceleration of the project must be as efficient as possible in terms of time and cost without ignoring the quality standards or the quality of the project that has been determined. The purpose of this study is to compare the cost of implementing reinforcement and casting on beams by comparing the wholesale calculation and Ministry of Public Works Regulation No. 28 of 2016. Cost efficiency in a development project is very important, therefore this research is aimed at finding out the comparison between these calculations. From the results of this research for reinforcement work there is a significant difference in the cost. for piece rates of Rp. 237,657,456.00 and from Ministry of Public Works Regulation No. 28 of 2016 Rp. 249,246,648.00 can thus be calculated difference of Rp. 11,589,192.00. As for casting work there is a significant difference in the fixed lump sum price of Rp. 76,395,788.00 and for Ministry of Public Works Regulation No. 28 of 2016 Rp. 83,942,663.00 can thus be calculated difference of Rp. 7,546,875.00. Keywords: Comparison, Cost, Labor, Lump Sum, Regulation of the Ministry of Public Works No. 28 2016.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 14 Oct 2020 06:50
Last Modified: 14 Oct 2020 06:50
URI: http://eprints.uty.ac.id/id/eprint/5840