ANALISIS PERCEPATAN WAKTU PROYEK DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI Studi Kasus: Proyek Pembangunan Gedung PMDPM RSUD Bumiayu Kabupaten Brebes ANALYSIS OF PROJECT TIME ACCELERATION BY ADDING OPTIMUM WORKING HOURS IN CONSTRUCTION PROJECTS Case Study: Building Project PMDPM Bumiayu District Hospital Brebes

Muzaki, Agil Prima and Bhaskara, Adwitya (2020) ANALISIS PERCEPATAN WAKTU PROYEK DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI Studi Kasus: Proyek Pembangunan Gedung PMDPM RSUD Bumiayu Kabupaten Brebes ANALYSIS OF PROJECT TIME ACCELERATION BY ADDING OPTIMUM WORKING HOURS IN CONSTRUCTION PROJECTS Case Study: Building Project PMDPM Bumiayu District Hospital Brebes. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5150811167_Agil Prima Muzaki.pdf

Download (347kB) | Preview

Abstract

ABSTRAK Pelaksanaan pembangunan proyek konstruksi merupakan suatu susunan kegiatan yang saling berhubungan antara satu pekerjaan dengan pekerjaan yang lain. Dalam pelaksanaannya proyek konstruksi memiliki berbagai kendala, salah satunya yaitu mengalami keterlambatan. Keterlambatan pekerjaan proyek dapat diatasi dengan cara melakukan percepatan dalam pelaksanaannya, namun harus tetap memperhitungkan biaya operasional yang akan dikeluarkan. Biaya yang dikeluarkan harus seefisien mungkin namun tidak mengurangi standar mutu bangunan. Percepatan penyelesaian proyek harus direncanakan secara terstruktur agar proyek tidak mengalami kerugian. Dengan adanya keterbatasan tenaga kerja, maka solusi yang tepat dilakukan adalah dengan penambahan waktu jam kerja (lembur) dengan menggunakan metode analisis pertukaran waktu dan biaya (Time Cost Trade Off Analisys). Tujuan dari penelitian ini adalah untuk mengetahui jarak durasi dari waktu penyelesaian proyek, untuk mengetahui biaya total yang diperoleh akibat penambahan jam kerja (lembur) optimum, untuk mengetahui efisiensi waktu dan biaya proyek setelah penambahan jam kerja (lembur) optimum dalam bentuk persen. Penelitian ini dilakukan pada Proyek Pembangunan Gedung Pelayanan Medik dan Penunjang Medik RSUD Bumiayu Brebes dikarenakan proyek tesebut mengalami keterlambatan. Hasil penelitian menunjukkan bahwa proyek ini dapat dipercepat dengan waktu optimum selama 65 hari dari waktu normal proyek 202 hari kalender menjadi 137 hari kalender dengan nilai cost slope sebesarRp.11.692.318 dari total biaya proyek sebesar Rp. 32.303.976.949,16 menjadi Rp.32.114.817.233. Dengan efisiensi waktu proyek sebanyak 0,1% dan efisiensi biaya proyek sebesar 0,3%. Kata kunci : Cost Slope, Lintasan Kritis, Percepatan. ABSTRACT The implementation of a construction project is an arrangement of activities that are interconnected between one work and another. In carrying out construction projects there are various obstacles, one of which is experiencing delays. Delay in project work can be overcome by accelerating the implementation, but it must still take into account the operational costs that will be incurred. Costs incurred must be as efficient as possible but do not reduce building quality standards. The acceleration of project completion must be planned in a structured manner so that the project does not suffer losses. Given the limited workforce, the right solution is to increase working hours (overtime) using the Time Cost Trade Off Analysis method. The purpose of this study is to determine the distance of the duration of the project completion time, to determine the total costs obtained due to the addition of optimum work hours (overtime), and to determine the efficiency of time and project costs after the addition of optimum work hours (overtime) in the form of percentage. This research was conducted at the Medical Services Building and Medical Support Building Construction Project Bumiayu Brebes Regional Hospital because the project experienced a delay. The results showed that the project could be accelerated with an optimum time of 65 days from the project's normal 202 days to 137 calendar days with a cost slope of Rp.11,692,318 of the total project cost of Rp. 32,303,976,949.16 to become Rp.32,114,817,233. With project time efficiency of 0.1% and project cost efficiency of 0.3%. Keywords: Cost Slope, Critical Path, Acceleration.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 14 Oct 2020 07:04
Last Modified: 14 Oct 2020 07:04
URI: http://eprints.uty.ac.id/id/eprint/5844