Utama, Joshika Pradirga and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS DAN BIAYA ALAT BERAT EXCAVATOR PADA PROYEK PERUMAHAN ANALYSIS OF PRODUCTIVITY AND EXCAVATOR HEAVY EQUIPMENT COSTS IN HOUSING PROJECTS. Tugas Akhir thesis, University Technology Yogyakarta.
|
Text
5150811241_Joshika Pradirga Utama.pdf Download (239kB) | Preview |
Abstract
ABSTRAK Secara teknik, alat berat menjadi faktor utama dalam pelaksanaan suatu proyek. Penggunaan alat berat sangatlah mempengaruhi proses pelaksanaan pekerjaan sesuai dengan target yang telah ditentukan. Maka dari itu, diperlukan alat berat yang cocok sesuai dengan pekerjaan yang dibutuhkan diproyek. Tujuan penelitian untuk mengetahui produktivitas excavator, waktu penundaan alat berat excavator, dan biaya alat berat. Berdasarkan pengamatan didapatkan data waktu siklus excavator untuk menghitung produktivitas excavator. Perhitungan produktivitas pekerjaan stripping 24,35 m3/jam, pekerjaan quarry 25,90 m3/jam, pekerjaan memasukan tanah ke dump truck 27,53 m3/jam, dan pekerjaan fill 25,95 m3/jam. Waktu siklus tak tertunda menggunakan teknik MPDM pada hari ke -2 sebesar 9,02 detik, pada hari ke -3 sebesar 2,96 detik, pada hari ke -4 sebesar 17,16 detik. Untuk hari ke -1 tidak memiliki waktu siklus tak tertunda dikarenakan tidak terdapat waktu tak tertunda saat pengambilan sample > 3 m3. Biaya operasional Rp 29.820.000.00 untuk 14 hari pekerjaan menggunakan alat berat excavator. Kata kunci: Excavator, Galian Tanah, Proyek Perumahan, Stripping, Teknik MPDM ABSTRACT Technically, heavy equipment is the main factor in carrying out a project. The use of heavy equipment greatly influences the process of carrying out work in accordance with predetermined targets. Therefore, it is needed a suitable heavy equipment in accordance with the work required on the project. The purpose of this study was to determine the productivity of excavators, excavation equipment delay times, and machine costs. Based on observations obtained data on excavator cycle times to calculate excavator productivity. Calculation of the productivity of stripping work is 24.35 m3 / hour, quarry work is 25.90 m3 / hour, the work of entering soil into dump trucks is 27.53 m3 / hour, and filling work is 25.95 m3 / hour. The delayed cycle time uses the MPDM technique on the 2nd day at 9.02 seconds, on the 3rd day at 2.96 seconds, on the 4th day at 17.16 seconds. For day 1 there is no delayed cycle time because there is no delayed time when sampling> 3 m3. Operating costs Rp. 29,820,000.00 for 14 days of work using excavator heavy equipment. Keywords: Excavators, Dugouts, Housing Projects, Stripping, MPDM Engineering
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
Depositing User: | Kaprodi S1 Teknik Sipil UTY |
Date Deposited: | 14 Oct 2020 08:58 |
Last Modified: | 14 Oct 2020 08:58 |
URI: | http://eprints.uty.ac.id/id/eprint/5866 |