Kustiadi, Wahyu and Saputro, Cahyo Dita (2020) ANALISIS PENENTUAN BOX GIRDER TERHADAP APLIKASI PC-I GIRDER PADA STRUKTUR ATAS JEMBATAN SEJIWAN DI PURWOREJO ANALYSIS OF BOX GIRDER DETERMINATION ON PC-I GIRDER APPLICATIONS IN THE UPPER STRUCTURE OF THE SEJIWAN BRIDGE IN PURWOREJO. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5150811373_Wahyu Kustiadi.pdf

Download (402kB) | Preview

Abstract

ABSTRAK Jembatan Sejiwan merupakan salah satu jembatan yang berdiri di atas Sungai Bogowonto. Jembatan Sejiwan hanya dapat dilalui secara satu arah saja, sedangkan jumlah warga yang biasa melewati jembatan tersebut mencapai ratusan orang tiap harinya. Melihat kondisi jembatan seperti itu dan kurang mampu menampung arus lalu lintas kendaraan yang semakin tahun semakin meningkat, maka direncanakanlah pembangunan jembatan baru. Jembatan baru yang sedang dibangun diberi nama yang sama seperti jembatan lama yaitu Jembatan Sejiwan. Tugas Akhir ini akan membahas tentang perbandingan antara Pc-I girder dan box girder. Jembatan Sejiwan telah menggunakan Pc-I girder dengan bentang maksimal 40 meter pada pekerjaan tahap dua kemarin, dan akan dilakukan perencanaan dengan bentang yang sama menggunakan box girder untuk menemukan mana yang lebih efektif untuk digunakan. Hasil dari penelitian ini yaitu dengan perencanaan profil box girder didapat optimalisasi volume beton sebesar 45,911% lebih besar dari Pc-I girder. Profil box girder menggunakan strand sebanyak 418 buah lebih banyak dari Pc-I girder. Dapat disimpulkan bahwa profil single twin cellular box girder dengan safety factor yang sama dengan profil Pc-I girder mengalami peningkatan volume beton dan jumlah strand yang cukup signifikan yang artinya akan lebih boros. Kata Kunci: box girder, Jembatan, Pc-I girder, Sejiwan ABSTRACT Sejiwan Bridge is one of the bridges that stands on the Bogowonto River. The Sejiwan Bridge can only be traversed in one direction, while the number of residents who normally pass the bridge reaches hundreds of people every day. Seeing the condition of the bridge as it is and being unable to accommodate the increasing traffic flow of vehicles, a new bridge is planned. The new bridge under construction is given the same name as the old bridge, Sejiwan Bridge. This Final Project will discuss the comparison between Pc-I girders and box girders. Sejiwan Bridge has used a PC-I girder with a maximum span of 40 meters in the second phase of the work before and planning will be done with the same span using a box girder to find which is more effective to use. The results of this study are that the box girder profile planning obtained an optimization of concrete volume of 45.911% greater than the Pc-I girders. Box girder profiles use 418 more strands than Pc-I girders. It can be concluded that the profile of a single twin cellular box girder with the same safety factor as the Pc-I girder profile has significantly increased concrete volume and the number of strands which means it will be more wasteful. Keywords: box girder, Bridge, Pc-I girder, Sejiwan

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 16 Oct 2020 06:52
Last Modified: 16 Oct 2020 06:52
URI: http://eprints.uty.ac.id/id/eprint/5901

Actions (login required)

View Item View Item