ANALISIS POLA OPERASI BENDUNG GERAK SERAYU DENGAN INFLOWDEBIT ANDALAN F.J. MOCK DAN INFLOW DEBIT ANDALAN AWLR ANALYSIS OF SERAYU WEIR OPERATION PATTERN USING DISCHARGE INFLOW OF F.J. MOCK AND DISCHARGE INFLOW OF AWLR

Ardiyansah, Akhmad Yusuf and Putri, Nanda Melyadi (2020) ANALISIS POLA OPERASI BENDUNG GERAK SERAYU DENGAN INFLOWDEBIT ANDALAN F.J. MOCK DAN INFLOW DEBIT ANDALAN AWLR ANALYSIS OF SERAYU WEIR OPERATION PATTERN USING DISCHARGE INFLOW OF F.J. MOCK AND DISCHARGE INFLOW OF AWLR. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5150811397_Akhmad Yusuf Ardiyansah.pdf

Download (296kB) | Preview

Abstract

ABSTRAK Sungai Serayu merupakan salah satu sungai di Jawa Tengah yang berhulu di Kabupaten Wonosobo. Sungai ini membentang dari timur laut ke barat daya sejauh 181 km. Bendung gerak memanfaatkan debit air Sungai Serayu untuk suplai air irigasi dan suplai air baku. Pengambilan bebas yang mengandalkan elevasi muka air di sungai yang cukup bagi keamanan pompa di musim kemarau tidak dapat menjamin pemberian air irigasi ke sawah secara kontinyu sepanjang tahun. Pola operasi yang tepat pada bendung diharapkan dapat memenuhi kebutuhan air sesuai dengan ketersedian yang ada, maka dilakukan simulasi keberhasilan pelayanan bendung dengan menggunakan data inflow debit andalan F.J. Mock dan inflow debit andalan AWLR. Metode perhitungan simulasi hujan menjadi aliran debit menggunakan metode F.J Mock. Data debit yang dianalisis adalah debit andalan 80% F.J. Mock dan AWLR. Simulasi keberhasilan pelayanan bendung dengan menggunakan data inflow debit andalan F.J. Mock dan inflow debit andalan AWLR. Hasil debit andalan 80% dari simulasi hujan menjadi aliran dengan metode F.J. Mock yaitu sebesar 232,951 m³/tahun dan nilai debit andalan 80% AWLR yaitu sebesar 271,714 m³/tahun. Perbandingan simulasi keberhasilan layanan bendung menggunakan debit andalan 80% kedua model dari bulan kebulan dapat dilihat sangat bervariasi. Bulan Januari, Februari, Maret, April, November dan Desember kedua model simulasi memenuhi tingkat keberhasilan 80%. Pada bulan Mei dan Juni Debit AWLR terpenuhi, sedangkan debit F.J. Mock tidak memenuhi tingkat keberhasilan 80% dikarenakan curah hujan sangat kecil. Bulan Juli, Agustus, September dan Oktober kedua model tidak terpenuhi dikarenakan inflow debit yang masuk kedalam bendung kecil. Kata Kunci:Debit Andalan, Debit AWLR, F.J Mock dan Pola Operasi ABSTRACT Serayu River is one of the rivers in Central Java that has a headwater in Wonosobo Regency. The river stretches from east to southwest reaching 181 km. The weir utilizes Serayu River water discharge for irrigation water supply and raw water supply Free collection that relies on river water level elevation which is sufficient for pump safety in the dry season cannot guarantee the availability of irrigation water for each year. The proper operating pattern on the weir is expected to be able to meet the water needs in accordance with the availability, then we compare the success of weir services using F. J. Mock’s and AWLR’s inflow discharge. The calculation method for the simulation of rain into discharge flow used is the F.J Mock method. Discharge data analyzed is the 80% dependable flow of F.J. Mock and AWLR. Simulation of the success of weir services uses discharge inflow data F.J. Mock and AWLR The results of the simulation of rain into flow using the dependable discharge 80% F.J. Mock method is 232,951 m³ / year and the dependable discharge value is 80% AWLR which is 271,714 m³ / year. Comparison of the simulation of the success of weir services using the dependable discharge of 80% of the two models from month to month can be seen to vary greatly. In January, February, March, April, November and December both simulation models met an 80% success rate. In May and June AWLR debits are met, while the F.J Mock debit.does not meet 80% success rate due to very small rainfall. In July, August, September and October the two models were not met due to inflow discharges entering the small weir. Keywords: Mainstay Discharge, AWLR Discharge, F.J Mock and Pattern of Operations

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 16 Oct 2020 07:02
Last Modified: 16 Oct 2020 07:02
URI: http://eprints.uty.ac.id/id/eprint/5906

Actions (login required)

View Item View Item