ANALISIS KAUSALITAS KECELAKAAN KONSTRUKSI BERDASARKAN PENILAIAN KONTRAKTOR DENGAN FAULT TREE ANALYSIS (FTA) Studi Kasus: Proyek Pembangunan Underpass Kentungan CONSTRUCTION ACCIDENT CAUSALITY ANALYSIS BASED ON CONTRACTOR ASSESSMENT WITH FAULT TREE ANALYSIS (FTA) A Case Study: Kentungan Underpass Development Project

Alim, Syawaluddin and Bhaskara, Adwitya (2020) ANALISIS KAUSALITAS KECELAKAAN KONSTRUKSI BERDASARKAN PENILAIAN KONTRAKTOR DENGAN FAULT TREE ANALYSIS (FTA) Studi Kasus: Proyek Pembangunan Underpass Kentungan CONSTRUCTION ACCIDENT CAUSALITY ANALYSIS BASED ON CONTRACTOR ASSESSMENT WITH FAULT TREE ANALYSIS (FTA) A Case Study: Kentungan Underpass Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5160811110_SYAWALUDIN ALIM.pdf

Download (140kB) | Preview

Abstract

ABSTRAK Dengan meningkatnya angka pembangunan infrastruktur di Indonesia, maka semakin tinggi juga tingkat resiko kecelakaan yang mungkin akan terjadi. Untuk mencegah hal tersebut dibutuhkan sistem manajemen yang baik dari pihak perusahaan konstruksi. Kecelakaan yang terjadi akibat kurangnya penerapaan manajemen keselamatan konstruksi pada suatu perusahaan harus dijadikan lesson learned untuk perusahaan lainnya. Kejadian kecelakaan konstruksi Underpass Kentungan Yogyakarta yang belum lama ini terjadi menjadi salah satu contoh kecelakaan yang dapat dianalisa terkait causalitas kecelakaan tersebut dapat terjadi. Penelitian ini dilakukan terhadap kejadian kecelakaan konstruksi Underpass Kentungan Yogyakarta. Penelitian bertujuan untuk mencari tahu causalitas terhadap kecelakaan konstruksi tersebut dari sudut pandang kontraktor. Penelitian terdiri dari dan analisis penerapan sistem keselamatan konstruksi terhadap pihak kontraktor menggunakan metode penilaian (assessment) yang dilanjutkan dengan analis causalitas kecelakaan kontstruksi menggunakan metode Fault Tree Analysis. Dari hasil penelitian yang dilakukan didapatkan tingkat pencapaian penerapan penilaian (assessment) yang telah diterapkan pihak kontraktor pada Proyek Pembangunan Underpass Kentungan Yogyakarta dengan perolehan presentase 85,938 % dimana nilai ini termasuk kedalam tingkat penilaian penerapan yang MEMUASKAN. Melalui analisis menggunakan metode Fault Tree Analysis didapatkan beberapa kejadian dasar atau basic event yang berpotensi sebagai penyebab kecelakaan konstruksi pada kecelakaan proyek Underpass Kentungan Yogyakarta dengan kombinasi kejadian dasar atau basic event A= C1+C2+C3+C4+C8+C18+C20+C48+C60+C61+C62+C63+C64+D1+D2+D3+D4+D5+D6+D7. Kejadian dasar tersebut berasal dari faktor personal, unsafe act dan unsafe condition. Untuk kejadian dasar yang diakibatkan oleh faktor personal adalah seperti kelalaian pihak yang bertanggung jawab, keterbatasan pengalaman pihak terkait, kurangnya pengetahuan, tidak mematuhi prosedur, kurangnya motivasi tenaga kerja dalam bekerja, keacuhan pihak terkait, adanya konflik, kurangnya keterampilan tenaga kerja, kurangnya kepatuhan tenaga kerja penerapan standar mutu dan kurangnya kepatuhan ketentuan K3. Untuk kejadian dasar yang diakibatkan oleh faktor unsafe act dan unsafe condition adalah seperti ketidak-laikan fungsi alat berat, tidak laiknya kondisi peralatan uji mutu, kurangnya ketersediaan sarana-prasarana penunjang, kondisi curah (hujan) tinggi, adanya gangguan sosial ekonomi masyarakat setempat, adanya pengaruh force major (banjir, longsor, gempa tektonik, dan kebencanaan lain) dan karean adanya pengaruh muatan budaya lokal. Kata kunci : aljabar boolean, causalitas, fault tree analysis (FTA), kecelakaan konstruksi, penilaian (assassment), sistem keselamatan dan kesehatan kerja Abstract With the increasing number of infrastructure development in Indonesia, the higher the risk of accidents that may occur. To prevent this, a good management system from the construction company is needed. Accidents that occur due to a lack of application of construction safety management in a company must be used as lessons learned for other companies. The incident of the Yogyakarta Kentungan Underpass construction accident which recently occurred was one example of an accident that can be analyzed regarding the causality of these accidents. This research was conducted on the incidence of construction accidents in the work of underpass Kentungan Yogyakarta. The research aimed to find out the causes of these construction accidents from the perspective of the contractor. The research consisted of analyzing the application of the construction safety system to the contractor using the assessment method which was followed by the analysis of the construction accident causality using the Fault Tree Analysis method. From the results of the conducted research, it was found that the level of achievement of the application of the assessment that had been applied by the contractor to the Yogyakarta Kentungan Underpass Development Project with a percentage of 85.938% where this value was included in the SATISFACTORY application assessment level. Through analysis using the Fault Tree Analysis method, it was found that several basic events or basic events have the potential to cause construction accidents in the Yogyakarta Kentungan Underpass project accident with a combination of basic events A = C1 + C2 + C3 + C4 + C8 + C18 + C20 + C48 + C60 + C61 + C62 + C63 + C64 + D1 + D2 + D3 + D4 + D5 + D6 + D7. These basic events came from personal factors, unsafe acts, and unsafe conditions. For basic incidents caused by personal factors were negligence of the responsible party, limited experience of related parties, lack of knowledge, not complying with procedures, lack of workforce motivation to work, ignorance of related parties, presence of conflict, lack of labor skills, lack of labor compliance implementation of quality standards and lack of compliance with K3 provisions. Basic events caused by unsafe act and unsafe condition factors were inadequate function of heavy equipment, improper condition of quality testing equipment, lack of availability of supporting infrastructure, conditions of high rainfall (rainfall), the existence of socio-economic disturbances in the local community, the influence of force major (floods, landslides, tectonic earthquakes, and other disasters) and because of the influence of local cultural loads. Keywords: boolean algebra, causality, fault tree analysis (FTA), construction accidents, assessment (assessment), occupational safety and health systems

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 22 Oct 2020 01:28
Last Modified: 22 Oct 2020 01:28
URI: http://eprints.uty.ac.id/id/eprint/5980

Actions (login required)

View Item View Item