ANALISIS RISIKO KECELAKAAN KERJA DALAM PENGGUNAAN TOWER CRANE DENGAN METODE ANALITYCAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Gedung Teaching Industry Leraning Center (TILC) Sekolah Vokasi UGM RISK ANALYSIS OF WORK ACCIDENTS IN THE USE OF TOWER CRANE USING ANALITYCAL HIERARCHY PROCESS (AHP) METHOD A Case Study of the UGM Vocational School Teaching Industry Center (TILC) Building Construction Project

Aprizaldi, Muhammad Faris and Saputro, Cahyo Dita (2020) ANALISIS RISIKO KECELAKAAN KERJA DALAM PENGGUNAAN TOWER CRANE DENGAN METODE ANALITYCAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Gedung Teaching Industry Leraning Center (TILC) Sekolah Vokasi UGM RISK ANALYSIS OF WORK ACCIDENTS IN THE USE OF TOWER CRANE USING ANALITYCAL HIERARCHY PROCESS (AHP) METHOD A Case Study of the UGM Vocational School Teaching Industry Center (TILC) Building Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

[img]
Preview
Text
5160811186_MUHAMMAD FARIS A.pdf

Download (43kB) | Preview

Abstract

ABSTRAK Pembangunan gedung bertingkat agar dapat meningkatkan pelaksanaan dan produksi membutuhkan peralatan kerja, salah satunya adalah tower crane. Selain meningkatkan pelaksanaan dalam pembangunan, tower crane juga dapat memberikan dampak negatif. Gagalnya penangkatan beban, rusaknya alat peralatan, putusnya tali sling pengikat, rusaknya material yang diangkat, dan kerusakan pada struktur bangunan di sekitarnya serta cidera atau bahkan terjadinya kematian adalah bagian dari rangkaian risiko yang mungkin saja terjadi di saat proses pekerjaan pengangkatan menggunakan tower crane. Oleh karana itu penelitian yang dilakukan pada proyek pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM ini bertujuan untuk mengidentifikasi risiko kecelakaan kerja dalam penggunaan tower crane, guna mencegah terjadinya kecelakaan. Metode yang digunakan dalam penelitian ini untuk mengetahui nilai risiko dari setiap indikator risiko yaitu menggunakan Analitycal Hierarchy Process (AHP). Berdasarkan hasil dari perhitungan menggunakan Analitycal Hierarchy Process (AHP), indikator dengan nilai risiko tertinggi yaitu pengoperasian tower crane dengan nilai risiko 0,1832, urutan kedua pemasangan tower crane dengan nilai risiko 0,1209, urutan ketiga pembongkaran tower crane dengan nilai risiko 0,0358. Dari masing-masing indikator diketahui subindikator yang paling berpengaruh berdasarkan urutan nilai risiko tertinggi. Selanjutnya dilakukan upaya pengendalian risiko dari setiap subindikator. Kata Kunci: Analitycal Hierarchy Process (AHP), Risiko, Tower crane Abstract The construction of a multi-storey building in order to increase implementation and production requires work equipment, one of which is a tower crane. Apart from increasing the implementation in construction, tower cranes can also have a negative impact. Failure to lift loads, damage to equipment, break of the rope sling, damage to the material being lifted, and damage to the surrounding building structures as well as injury or even death are part of a series of risks that may occur during the lifting process using a tower crane. Therefore, the research carried out on the construction project of the Teaching Industry Learning Center (TILC) UGM Vocational School aimed to identify the risk of work accidents in the use of tower cranes, in order to prevent accidents. The method used in this study to determine the risk value of each risk indicator used the Analitycal Hierarchy Process (AHP). Based on the results of calculations using the Analitycal Hierarchy Process (AHP), the indicator with the highest risk value was the operation of the tower crane with a risk value of 0.1832, the second order was the installation of tower cranes with a risk value of 0.1209, the third order was dismantling the tower crane with a risk value of 0, 0358. From each indicator, it was known that the most influential sub-indicator was based on the order of the highest risk value. Furthermore, efforts were made to control the risk of each sub-indicator. Keywords: Analitycal Hierarchy Process (AHP), Risk, Tower crane

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 22 Oct 2020 02:01
Last Modified: 22 Oct 2020 02:01
URI: http://eprints.uty.ac.id/id/eprint/5996

Actions (login required)

View Item View Item