Agustin, Nia and Saputro, Cahyo Dita (2020) ANALISIS RISIKO KECELAKAAN KONSTRUKSI PROYEK PEMBANGUNAN UNDERPASS DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Underpass Kentungan Yogyakarta RISK ANALYSIS OF CONSTRUCTION ACCIDENTS UNDERPASS DEVELOPMENT PROJECT WITH ANALYTICAL HIERARCHY PROCESS (AHP) METHOD A Case Study of the Yogyakarta Kentungan Underpass Development Project. Tugas Akhir thesis, University Technology Yogyakarta.
|
Text
5160811231_NIA AGUSTIN.pdf Download (21kB) | Preview |
Abstract
ABSTRAK Proses pembangunan infrastruktur atau proyek konstruksi pada umumnya merupakan kegiatan yang banyak mengandung unsur bahaya. Hal tersebut menyebabkan industri konstruksi memiliki catatan yang buruk dalam hal keselamatan dan kesehatan kerja. Oleh karena itu, keselamatan kerja meruapakan aspek yang harus dibenahi setiap saat, karena permasalahan tersebut meruapakan permasalahan kompleks.Penelitian ini bertujuan untuk mengetahui urutan indikator yang mempunyai tingkat resiko paling tinggi sampai terendah setiap indikator kinerja dari sudut pandang kontraktor dan konsultan pengawas menggunakan metode Analytical Hierarchy Process (AHP) pada Proyek Pembangunan Underpass Kentungan Yogyakarta. Meteode penelitian yang digunakan yaitu kualitatif deskriptif. Analisis data menggunakan metode AHP dengan hasil akhir yaitu sebuah hirarki yang memiliki tingkat akurasi dan konsistensi yang tinggi.Hasil dari penelitian ini analisa indikator kinerja menggunakan metode Analytical Hiearchy Process (AHP) menunjukkan bahwa indikator yang menjadi prioritas untuk dijadikan acuan sistem keselamatan konstruks dan indikator yang memounyai tingkat risiko paling tinggi yang dapat menyebabkan kecelakaan konstruksi proyek underpass dari sudut pandang kontraktor yaitu indikator ketersediaan sarana dan parasarana penunjang dengan nilai tingkat risiko sebesar 0,042, Sedangkan dari sudut pandang konsultan pengawas yaitu indikator pengukuran dimensi bangunan jalan terpasang dilapangan dengan nilai tingkat risiko sebesar 0,052. Kata kunci : Risiko, Kecelakaan Konstruksi, AHP Abstract The process of building infrastructure or construction projects is generally an activity that contains many hazardous elements. This has resulted in the construction industry having a poor record in terms of occupational safety and health. Therefore, work safety is an aspect that must be addressed at any time because this problem is a complex problem. This study aimed to determine the sequence of indicators that had the highest to lowest risk level for each performance indicator from the perspective of the contractor and supervisory consultant using the Analytical Hierarchy Process (AHP) method in the Yogyakarta Kentungan Underpass Development Project. The research method used was descriptive qualitative. Data analysis using the AHP method of which the final result was in the form of a hierarchy that had a high degree of accuracy and consistency. The results of this research analysis of performance indicators using the Analytical Hiearchy Process (AHP) method showed that the indicators that became priority were used as a reference for construction safety systems and the indicators had the highest risk level that can cause an underpass project construction accident from the contractor's point of view, namely the indicator of the availability of supporting facilities and infrastructure with a risk level value of 0.042, while from the viewpoint of the supervisory consultant, it was an indicator measuring the dimensions of road buildings installed in the field with a risk level value of 0.052 . Keywords: Risk, Construction Accidents, AHP
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Sipil |
Depositing User: | Kaprodi S1 Teknik Sipil UTY |
Date Deposited: | 22 Oct 2020 02:35 |
Last Modified: | 22 Oct 2020 02:35 |
URI: | http://eprints.uty.ac.id/id/eprint/6002 |
Actions (login required)
View Item |