ANALISA MANAJEMEN RISIKO DENGAN KONSEP SEVERITY INDEX (SI) PADA PROYEK GEDUNG DARI SUDUT PANDANG KONTRAKTOR Studi Kasus Proyek Pembangunan Teaching Industry Learning Center (TILC) Universitas Gadjah Mada RISK MANAGEMENT ANALYSIS WITH THE CONCEPT OF SEVERITY INDEX (SI) IN THE BUILDING PROJECT FROM CONTRACTOR'S VIEW Case Study of Teaching Industry Learning Center (TILC) Development Project Gadjah Mada University

Femi Saita, Nadila and Dita Saputro, Cahyo (2021) ANALISA MANAJEMEN RISIKO DENGAN KONSEP SEVERITY INDEX (SI) PADA PROYEK GEDUNG DARI SUDUT PANDANG KONTRAKTOR Studi Kasus Proyek Pembangunan Teaching Industry Learning Center (TILC) Universitas Gadjah Mada RISK MANAGEMENT ANALYSIS WITH THE CONCEPT OF SEVERITY INDEX (SI) IN THE BUILDING PROJECT FROM CONTRACTOR'S VIEW Case Study of Teaching Industry Learning Center (TILC) Development Project Gadjah Mada University. Tugas Akhir thesis, University of Technology Yogyakarta.

[img]
Preview
Text
ABSTRAK_5160811301_Nadila Femi Sagita .pdf

Download (20kB) | Preview

Abstract

ABSTRAK Setiap proyek konstruksi pasti memiliki risiko baik risiko rendah, sedang maupun tinggi Risiko tidak dapat dilenyapkan secara lengkap, namun dapat dikelola secara efektif, untuk mengurangi pengaruhnya terhadap tercapainya sasaran proyek sangat diperlukan sistem manajemen risiko yang sangat baik. Keberhasilan pelaksanaan suatu proyek konstruksi yang dilakukan oleh jasa konstruksi berkaitan dengan sejauh mana sasaran proyek tersebut memenuhi ketiga faktor triple constraint yaitu biaya, mutu, dan waktu, karena triple constraint sangat mempengaruhi keberlangsungan proyek. Tujuan penelitian ini adalah untuk mengidentifikasi risiko, menganalisa nilai risiko dan tingkat penerimaan risiko terhadap proyek. Pada penelitian ini dilakukan survei awal dan wawancara langsung untuk memvalidasi indikator risiko apa saja yang relevan terhadap proyek tersebut. Selanjutnya analisis risiko dilakukan dengan metode severity index (SI), penggunaan metode Severity Index digunakan untuk menetukan nilai probabilitas dan dampak, lalu mengkategorikanya berdasarkan besar probabilitas dampaknya, setelah mengetahui nilai yang mewakili jawaban dari responden, analisa dilanjutkan dengan menggeplotkan nilai kedalam matriks probabilitas dan dampak. Setelah mengetahui nilai tingkatan risiko dilakukan tingkatan penerimaan terhadap risiko tersebut untuk mengantisipasi atau memperkecil terjadinya risiko. Dari hasil penelitian menunjukkan terdapat 88 variabel risiko yang terbagi kedalam 10 kelompok risiko utama yang terjadi pada proyek Teaching Industry Learning Center (TILC) UGM. Berdasarkan hasil analisa risiko didapatkan ada satu risiko yang signifikan terhadap biaya dan waktu, yang berkategori high yaitu adanya perubahan desain yang termasuk kedalam kategori risiko desain. Tingkat penerimaan risiko yang berkategori high yaitu undesirable (tidak diharapkan), risiko pada tingkatan ini termasuk major risk yang memerlukan penanganan atau mitigsi risiko. Kata kunci: Identifikasi Risiko, Manajemen Risiko, Proyek Konstruksi, Severity Index ABSTRACT Every construction project must have risks, both low, medium and high risks. Risk cannot be completely eliminated, but can be managed effectively. To reduce its impact on the achievement of project targets, it is necessary to have an excellent risk management system. The success of the implementation of a construction project carried out by construction services is related to the extent to which the project target meets the three triple constraint factors, namely cost, quality, and time, because the triple constraint greatly affects the project's sustainability. The purpose of this study is to identify risks, analyze the value of risks and the level of risk acceptance of the project. In this study, a preliminary survey and direct interviews were conducted to validate any risk indicators relevant to the project. Furthermore, risk analysis is carried out using the severity index (SI) method. The Severity Index method is used to determine the probability and impact values, then categorize them based on the probability of impact, after knowing the value that represents the answers of the respondents, the analysis is continued by plotting the values into the probability and impact matrix. After knowing the value of the risk level, the level of acceptance of the risk is carried out to anticipate or minimize the risk. The results showed that there were 88 risk variables divided into 10 main risk groups that occurred in the UGM Teaching Industry Learning Center (TILC) project. Based on the results of the risk analysis, it is found that there is a significant risk to cost and time, which is in the high category, namely a design change that is included in the design risk category. The level of risk acceptance which is categorized as high is undesirable, the risk at this level is included as major risk requiring risk treatment or mitigation. Keywords: Risk Identification, Risk Management, Construction Projects, Severity Index DAFTAR PUSTAKA A Guide to the Project Managemen Of Body Knowledge (PMBOK Guide). (2004). USA Cahyadi, E.R. 2001. Manajemen Risiko. Jakarta. Darmawi, H. (2000). Manajemen Risiko. Bumi Aksara. Jakarta Ervianto, W. I. (2004). Teori Aplikasi Manajemen Proyek Konstruksi, Yogyakarta: Andi Yogyakarta. Hasibuan, Rizky Ade Putra (2017). Manajemen Risiko Terhadap Biaya dan Waktu pada Pekerjaan Struktur Gedung Bertingkat Tinggi (Studi Kasus: Proyek Pembangunan Apartemen Grand Jati Junction. Rekayasa Konstruksi Departemen Teknik Sipil Fakultas Teknik. Universitas Sumatara Utara. Medan Hawari, Kahhar (2009). Identifikasi Risiko Proyek Pada Tahap Konstruksi Bangunan Bertingkat 4-20 Lantai Di Jabotabek Dari Sudut Pandang Kontrktor. Fakultas Teknik. Universitas Indonesia. Depok. Iman Soeharto. (2001). Manajemen Proyek: Dari Konseptul Sampai Operasional, Jilid 2. Jakarta: Erlangga. Maliki, Imam Nur (2016). Evaluasi Faktor-Faktor Dominn Risiko Teknis Pelaksanaan Proyek Jember Icon Tahap Dua Dengan Metode Severity Index. Fakultas Teknik. Universitas Jember. Jember Meylani, Rizka (2018). Analisa Risko Knstruksi Pada Proyek Pembangunan Gedung (Studi Kasus: Pembangunan Rumah Susun Medan). Bidang Studi Manajemen Rekayasa Konstruksi Departemen Teknik Sipil Fakultas Teknik. Universitas Sumatara Utara. Medan

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Sipil
Depositing User: Kaprodi S1 Teknik Sipil UTY
Date Deposited: 30 Dec 2021 08:49
Last Modified: 30 Dec 2021 08:49
URI: http://eprints.uty.ac.id/id/eprint/7458

Actions (login required)

View Item View Item