Items where Author is "Prabadijaya, Sukma Tesa"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Prabadijaya, Sukma Tesa and Bhaskara, Adwitya (2022) ANALISIS PERCEPATAN PROYEK DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Geodiversity Karangsambung) PROJECT ACCELERATION ANALYSIS WITH USING THE TIME-COST TRADE-OFF METHOD (Case Study: Karangsambung Geodiversity Building Project). Tugas Akhir thesis, University Technology Yogyakarta.

This list was generated on Thu Nov 21 20:27:39 2024 WIB.