Up a level |
Prabadijaya, Sukma Tesa and Bhaskara, Adwitya (2022) ANALISIS PERCEPATAN PROYEK DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Geodiversity Karangsambung) PROJECT ACCELERATION ANALYSIS WITH USING THE TIME-COST TRADE-OFF METHOD (Case Study: Karangsambung Geodiversity Building Project). Tugas Akhir thesis, University Technology Yogyakarta.