Abstrak PT GMP Sukses Makmur Indonesia merupakan salah satu perusahaan yang bergerak dibidang produksi Bubble Wrap (plastik bergelembung). Permasalahan yang sering timbul di Pt Gmp Sukses Makmur Indonesia adalah tingginya waktu delay mesin produksi dengan downtime sebesar 705,43 jam dan breakdown sebesar 663,33 jam dalam satu tahun. sehingga kinerja mesin kurang efektif. Hal tersebut dapat menyebabkan tidak tercapainya target produksi yang menyebabkan kerugian. Tujuan dari penelitian ini adalah untuk mengetahui efektivitas mesin produksi Bubble Wrap dengan menggunakan alat ukur Overall Resource Effeectiveness (ORE) dan mencari penyebab permasalahan yang telah dilakukan menggunakan metode ORE pada mesin produksi Bubble Wrap selama periode September 2021 – Agustus 2022. ORE merupakan sebuah metode yang berguna dalam mengukur efektivitas waktu produksi dengan memperhatikan sumber daya yang meliputi manusia, mesin material dan metode, Dalam metode ORE terdapat tujuh faktor yang diukur diantaranya readiness, availability of facility, changover efficiency, availability of material, availability of manpower, performance efficiency, dan quality rate. Adapun hasil pengukuran efektivitas mesin menggunakan metode Overall Resource Effectiveness (ORE) untuk mesin Ektruder sebesar 76,41%, Crusher 99,59%, Cooling 98,99%, Mixer 99,79%, dan Air Compressor 98,88%. Berdasarkan metode yang digunakan diketahui bahwa pada proses produksi Bubble Wrap mesin Ektruder belum memenuhi standar ORE sebesar 85%, adapun faktor yang mempengaruhi yaitu performance efficiency dan Quality rate , dimana nilai performance efficiency dan Quality rate belum memenuhi standar sehingga mempengaruhi tingginya nilai Overall Resource Effectiveness (ORE). Kata kunci: Efektivitas Mesin, Bubble Wrap, Overall Resource Effectiveness MEASURING THE EFFECTIVENESS OF BUBBLE WRAP PRODUCTION MACHINE USING THE OVERALL RESOURCE EFFECTIVENESS METHOD Case Study of PT GMP Sukses Makmur Indonesia ABSTRACT PT GMP Sukses Makmur Indonesia is a company engaged in producing Bubble Wrap (bubbled plastic). The problem that often arises at Pt Gmp Sukses Makmur Indonesia is the high production machine delay time with a downtime of 705.43 hours and a breakdown of 663.33 hours in one year. So the engine performance is less effective. It can lead to not achieving production targets which cause losses. This research aims to determine the effectiveness of Bubble Wrap production machines using the Overall Resource Effectiveness (ORE) measuring tool and to find the problems caused. The study used the ORE method on Bubble Wrap production machines from September 2021 – August 2022. ORE is a method that is useful in measuring the effectiveness of production time by considering the resources, which include humans, machines, materials, and procedures. In the ORE method, seven factors are measured: readiness, availability of the facility, changeover efficiency, availability of material, availability of workforce, performance efficiency, and quality rate. The results of measuring machine effectiveness using the Overall Resource Effectiveness (ORE) method for Ektruder machines were 76.41%, Crushers 99.59%, Cooling 98.99%, Mixers 99.79%, and Air Compressors 98.88%. Based on the technique used, it is known that in the Bubble Wrap production process, the Ektruder machine has not met the ORE standard of 85%. At the same time, the influencing factors are performance efficiency and Quality rate, where the performance efficiency and Quality rate values do not meet the standards, affecting the high Overall Resource Effectiveness ( ORE). Keywords: Machine Effectiveness, Bubble Wrap, Overall Resource Effectiveness

Item Type: Thesis (["eprint_fieldopt_thesis_type_tugasakhir" not defined])
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 23 May 2023 07:54
Last Modified: 23 May 2023 07:54
URI: http://eprints.uty.ac.id/id/eprint/13048

Actions (login required)

View Item View Item