ANALISIS BEBAN KERJA MENTAL DAN FISIK PEKERJA LINI PRODUKSI MENGGUNAKAN METODE NASA-TLX DAN CVL ANALYSIS OF MENTAL AND PHYSICAL WORKLOAD OF PRODUCTION LINE WORKERS USING THE NASA-TLX AND CVL METHODS

Aditya, Hokky Alfath and Yuamita, Ferida (2023) ANALISIS BEBAN KERJA MENTAL DAN FISIK PEKERJA LINI PRODUKSI MENGGUNAKAN METODE NASA-TLX DAN CVL ANALYSIS OF MENTAL AND PHYSICAL WORKLOAD OF PRODUCTION LINE WORKERS USING THE NASA-TLX AND CVL METHODS. ["eprint_fieldopt_thesis_type_tugasakhir" not defined] thesis, University of Technology Yogyakarta.

[img] Text
5190611095 HOKKY ALFATH ADITYA-ABSTRAK.pdf

Download (326kB)

Abstract

ABSTRAK The Brother Jogja merupakan usaha yang bergerak di bidang las dan rekayasa teknik yang memproduksi pagar, kanopi, kursi, neon box dan meja.Usaha ini memproduksi atau melayani produk-produk tersebut sesuai dengan pesanan (Make To Order) dari konsumen yang kebanyakan berasal dari dalam negri. Jika dilihat dari sifat produksinya, yaitu make to order, dapat disimpulkan bahwa variasi produk yang dihasilkan menyesuaikan dengan pesanan atau permintaan konsumen. pembagian job tidak menentu seperti 1 orang nantinya bisa mengerjakan 1-3 bagian, hal tersebut yang mengakibatkan karyawan merasa kelelahan dan nantinya terjadinya sistem lembur yang membuat nantinya menjadi beban. Penggunaan pengukuran beban fisik dan mental dengan pendekatan CVL dan NASA-TLX bertujuan dapat mengevaluasi besaran beban secara fisik maupun mental yang sesuai dengan aktivitas serta hasil pengisian kuisioner oleh para karyawan, dan hasil ini tentunya berkorelasi dengan produktivitas kerja agar nantinya hal tersebut diketahui dan bisa di atasi yang kedepan tidak berdampak pada karyawan saat bekerja dan memberikan efek positif terhadap perusahaan dengan bekerja dengan produktif dan hasil pengukuran beban mental pekerja menggunakan nasa-tlx mendapatkan kategori indikator kebutuhan mental (MD) mendapatkan jumlah skor 1160, kebutuhan fisik (PD) 660,kebutuan waktu (TD) 1650,Perfomansi (P) 1820, usaha (FR) 1815, tingkat frustasi (EF) 595 sedangkan pengukuran beban fisik pekerja menggunakan metode cvl pada pekerja 5 dengan nilai rata-rata CVL 42 dan yang terendah dengan rata-rata nilai CVL 32,6 pada pekerja 9. Kata Kunci : Nasa-tlx, CVL, Beban Mental, Beban Fisik ABSTRACT The Brother Jogja is a business engaged in the welding and engineering fields that produces fences, canopies, chairs, neon boxes and tables. This business produces these products according to orders (Make To Order) from consumers, most of whom come from within the country. When viewed from the nature of production, namely make to order, it can be concluded that the product variations produced adjust to consumer orders or requests. Uncertain job distribution, such as 1 person can later work on 1-3 parts, this causes employees to feel exhausted and later there will be an overtime system which will later become a burden. The use of physical and mental load measurements with the CVL and NASA-TLX approaches aims to be able to evaluate the amount of physical and mental loads that are in accordance with the activities and results of filling out questionnaires by employees, and these results certainly correlate with work productivity so that later this is known and can be used. overcome in the future does not have an impact on employees while working and has a positive effect on the company by working productively and the results of measuring the mental load of workers using Nasa-TLX get the category of indicators of mental needs (MD) get a total score of 1160, physical needs (PD) 660, needs time (TD) 1650, Performance (P) 1820, effort (FR) 1815, level of frustration (EF) 595 while measuring the physical load of workers using the cvl method on workers 5 with an average CVL value of 42 and the lowest with an average value CVL 32.6 in worker 9. Keywords: Nasa-tlx, CVL, Mental Burden, Physical Burden

Item Type: Thesis (["eprint_fieldopt_thesis_type_tugasakhir" not defined])
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 27 Jul 2023 01:52
Last Modified: 27 Jul 2023 01:52
URI: http://eprints.uty.ac.id/id/eprint/13220

Actions (login required)

View Item View Item