Javitz, Lazuardi Hanggara and Nugroho, Andung Jati (2024) PENENTUAN BEBAN KERJA TERHADAP PRODUKTIVITAS KERJA KARYAWAN DENGAN METODE WORK LOAD ANALYSIS STUDI KASUS PT DEWI MAHASADU. Tugas Akhir thesis, University of Technology Yogyakarta.
Text
5200611016 Lazuardi Hanggara Javitz-ABSTRAK.pdf Download (155kB) |
Abstract
ABSTRAK PT Dewi Mahasadu merupakan usaha yang bergerak di bidang pembuatan fashion handbags dan accessories yang berbasis handmade yang memproduksi tas rajut, dompet dan aksesoris lainnya. PT. Dewi Mahasadu dalam divisi produksi mempunyai waktu jam kerja pada hari Senin-Sabtu, dengan waktu kerja pekerja adalah hanya 1 shift, selama 8 jam per hari. Dimulai dari pagi pukul 08.00 – 17.00 WIB dengan ketentuan jam istirahat 1 jam pada pukul 12.00 – 13.00. Data jam kerja karyawan ini akan dipergunakan dalam proses perhitungan work sampling. Aktivitas karyawan akan dikelompokkan menjadi 2 aktivitas, yaitu aktivitas produktif dan non produktif (idle) yang nantinya akan diakumulasikan sesuai dengan waktu pengamatan work sampling. Setelah ditentukan interval waktu pengamatan sebagaimana tertera pada perhitungan, maka dapat diketahui data terkait waktu produktif dan non produktif yang dilakukan selama 3 hari, dengan pengamatan hari ke-1 pada tanggal 21 Maret 2024, pengamatan hari ke-2 pada tanggal 22 Maret 2024, dan pengamatan hari ke-3 pada tanggal 23 maret 2024. Perhitungan beban kerja menggunakan metode Work Load Analysis dibagi menjadi 3 (tiga) hari. Hari pertama besaran beban kerjanya yaitu 92%, hari kedua yaitu 91%, dan hari ketiga yaitu 89%. Beban kerja tersebut dapat dikatakan tidak overload karena kurang dari 100%. Usulan perbaikan maka dari itu, perusahaan lebih memperhatikan beban kerja yang diberikan pada karyawan agar produktivitas mengalami peningkatan sesuai target perusahaan. Bagi peneliti, peneliti sebaiknya melakukan penelitian tentang beban kerja pada bagian divisi lainnya. Kata Kunci : Produktivitas, Karyawan, Work Sampling, Work Load Analysis ABSTRACT PT Dewi Mahasadu is a company that specializes in creating handmade fashion handbags and accessories such as knitted bags, wallets, and other items. PT. Dewi Mahasadu in the production division has working hours from Monday to Saturday, with employees working a single 8-hour shift per day. The working hours will be from 08.00 to 17.00 WIB, with a one-hour break from 12.00 to 13.00. The data on the working hours of this employee will be used to calculate work sampling. The employees' activities will be categorized into productive and non-productive (idle) activities, which will be later summed up based on the work sampling observation time. Once the observation time interval has been determined per the calculation, data about both productive and non-productive time can be viewed for 3 days. The first day of observation will be on March 21, 2024, the second day on March 22, 2024, and the third day on March 23, 2024. The workload calculation using the Work Load Analysis method is divided into 3 days. The workload on the first day was 92%; on the second day, it was 91%; and on the third day, it was 89%. Since the workload is less than 100%, it can be considered as not overloaded. To enhance productivity in line with the company's objectives, it is recommended that the company closely monitors the workload assigned to employees. Additionally, researchers are advised to explore workload patterns in different departments for further analysis. Keywords: Productivity, Employees, Work Sampling, Work Load Analysis
Item Type: | Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir) |
---|---|
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Sains dan Teknologi > S1 Teknik Industri |
Depositing User: | Kaprodi S1 Teknik Industri UTY |
Date Deposited: | 04 Dec 2024 03:56 |
Last Modified: | 04 Dec 2024 03:56 |
URI: | http://eprints.uty.ac.id/id/eprint/17003 |