PENGENDALIAN KEBUTUHAN BAHAN BAKU PANEL BAMBU MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP)

Kurniawan, Muhamad Dimas and Setiafindari, Widya (2025) PENGENDALIAN KEBUTUHAN BAHAN BAKU PANEL BAMBU MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP). Tugas Akhir thesis, University of Technology Yogyakarta.

[img] Text
5210611042 MUHAMAD DIMAS KURNIAWAN_ABSTRAK.pdf

Download (213kB)

Abstract

ABSTRAK PT Dekor Asia Jayakarya merupakan salah satu perusahaan yang bergerak dibidang Furniture dan Kerajinan. PT Dekor Asia Jayakarya memiliki ruang di hati masyarakat dalam maupun luar negeri. Selama priode setahun terahir bulan Januari sampai bulan Desember 2024 persediaan bahan baku mengalami overstock, perusahaan mengalami peningkatan produksi sebesar 37139pcs, yaitu meningkatnya jumlah stok sebesar 1139pcs dari 36000pcs yang dibutuhkan perusahaan selama 1 tahun. Diketahui estimasi biaya simpan perusahaan untuk Panel Bambu yaitu Rp 460.615.310 selama per bulan, jika tidak dilakukan evaluasi peningkatan produksi/overstock mempengaruhi biaya simpan (holding cost). Tujuan dari penelitian untuk mengendalikan persediaan bahan baku supaya tidak terjadi overstock, melakukan analisi menggunakan metode Material Requirement Planning (MRP). Teknik Lot Sizing, Lot for lot (LFL), Economic Order Quantity (EOQ) dan Priod Order Quantity (POQ). Hasil penelitian teknik lotting EOQ jika biaya simpan perusahaan Rp 460.615.310, dapat menghemat sebesar Rp 310.317.167 per bulan, dengan penggunaan biaya simpan Rp 150.298.143 per bulan. Total biaya simpan selama satu tahun didapatkan Rp 1.653.279.578. Solusi yang tepat, menggunakan teknik EOQ untuk meminimalkan untuk menekankan holding cost perusahaan karena overstock. Kata Kunci: Pengendalian Persediaan Bahan Baku, Material Requirement Planning, LFL, EOQ, POQ ABSTRACT PT Dekor Asia Jayakarya is one of the companies engaged in the field of Furniture and Crafts. PT Dekor Asia Jayakarya has been in the hearts of people both in Indonesia and abroad. During the last one-year period from January to December 2024, raw material inventory experienced overstock. The company experienced an increase in production of 37139pcs, namely an increase in the amount of stock by 1139pcs from 36000pcs needed by the company for 1 year. It is known that the estimated company's storage costs for Bamboo Panels are IDR 460,615,310 per month, if no evaluation is carried out, the increase in production/overstock affects the storage costs (holding costs). The purpose of the study is to control raw material inventory so that overstock does not occur, conducting an analysis using the Material Requirement Planning (MRP) method. Lot Sizing, Lot for lot (LFL), Economic Order Quantity (EOQ) and Priod Order Quantity (POQ) techniques. The results of the EOQ lotting technique study show if the company's storage costs are IDR 460,615,310, it can save IDR 310,317,167 per month, with the use of storage costs of IDR 150,298,143 per month. The total storage cost for one year is Rp 1,653,279,578. The right solution is to use the EOQ technique to minimize the company's holding cost due to overstock. Keywords: Raw Material Inventory Control, Material Requirement Planning, LFL, EOQ, POQ

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Sains dan Teknologi > S1 Teknik Industri
Depositing User: Kaprodi S1 Teknik Industri UTY
Date Deposited: 19 Dec 2025 05:03
Last Modified: 19 Dec 2025 05:03
URI: http://eprints.uty.ac.id/id/eprint/19550

Actions (login required)

View Item View Item