Analisis Anggaran dan Realisasi Biaya Operasional PDAM Tirta Binangun Kabupaten Kulon Progo Tahun 2018-2020

Lestari, Novi, Junaidi Dr., M.Si., Ak., CA. (2021) Analisis Anggaran dan Realisasi Biaya Operasional PDAM Tirta Binangun Kabupaten Kulon Progo Tahun 2018-2020. Tugas Akhir thesis, Universitas Teknologi Yogyakarta.

[img]
Preview
Text
3180111067_Novi Lestari_Abstrak_Periode 2_2020-2021.pdf

Download (8kB) | Preview

Abstract

This study aims to determine and analyze the budget and realization of operational costs at PDAM Tirta Binangun, Kulon Progo Regency. The analysis used in this study is using analysis of variance, where if the operational cost budget is greater than the realization of the operational cost budget, a favorable difference occurs. Meanwhile, if the operational cost budget is smaller than the actual operational cost budget, there will be an unfavorable difference. The Unfavorable difference is caused because the company is less effective in estimating the amount of operational costs in each description or each item in each year, so that some items of operational costs are not controlled and make the budget much different from its realization. Then the amount of uncontrolled costs can affect the profits obtained by PDAM Tirta Binangun, Kulon Progo Regency.

Item Type: Thesis (Skripsi, Tugas Akhir or Kerja Praktek) (Tugas Akhir)
Uncontrolled Keywords: Budget and realization, Operational Cost, Variance.
Subjects: H Social Sciences > HB Economic Theory
Divisions: Fakultas Ekonomi dan Bisnis > D3 Akuntansi
Depositing User: Prodi Akuntansi Diploma
Date Deposited: 23 Sep 2021 09:40
Last Modified: 13 Oct 2021 06:57
URI: http://eprints.uty.ac.id/id/eprint/8264

Actions (login required)

View Item View Item