Items where Author is "Bhaskara, Adwitya"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 92.

Lorenza, Yayan and Bhaskara, Adwitya (2022) ANALISIS PERCEPATAN PEKERJAAN DENGAN MENGGUNAKAN METODE FAST TRACK &TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Kantor Walikota Kendari) ANALYSIS OF ACCELERATION OF JOB USING FAST TRACK & TIME COST TRADE-OFF METHOD (Case Study: Kendari Mayor Office Building Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Ufriyaldi, Igit and Bhaskara, Adwitya (2022) ANALISIS RESIKO KESELAMATAN KONSTRUKSI PEKERJAAN JALAN MENGGUNAKAN METODE IBPRP DAN CONSTRUCTION SAFETY ANALYSIS (CSA) (Studi Kasus Proyek Pekerjaan Peningkatan Jalan Tanjung Sari Kecamatan Kundur,Kabupaten Karimun) CONSTRUCTION SAFETY RISK ANALYSIS OF ROAD WORKS USING IBPRP METHODS AND CONSTRUCTION SAFETY ANALYSIS (CSA) (Case Study of the Tanjung Sari Road Improvement Project, Kundur District, Karimun Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Pratama, Alfian Agus and Bhaskara, Adwitya (2022) IDENTIFIKASI RISIKO KESELAMATAN KONSTRUKSI DENGAN CONSTRUCTION SAFETY ANALYSYS (CSA) DAN IBPRP (Studi Kasus: Pekerjaan Syruktur Atas Proyek Pembangunan Fasilitas Kawasan Geodiversitas Indonesia Di Karangsambung) IDENTIFICATION OF CONSTRUCTION SAFETY RISK WITH CONSTRUCTION SAFETY ANALYSIS (CSA) AND IBPRP (Case Study: Structural Work on the Facility Development Project for the Indonesian Geodiversity Area in Karangsambung). Tugas Akhir thesis, University Technology Yogyakarta.

Pratama, Alfian Agus and Bhaskara, Adwitya (2022) IDENTIFIKASI RISIKO KESELAMATAN KONSTRUKSI DENGAN CONSTRUCTION SAFETY ANALYSYS (CSA) DAN IBPRP (Studi Kasus: Pekerjaan Syruktur Atas Proyek Pembangunan Fasilitas Kawasan Geodiversitas Indonesia Di Karangsambung) IDENTIFICATION OF CONSTRUCTION SAFETY RISK WITH CONSTRUCTION SAFETY ANALYSIS (CSA) AND IBPRP (Case Study: Structural Work on the Facility Development Project for the Indonesian Geodiversity Area in Karangsambung). Tugas Akhir thesis, University Technology Yogyakarta.

Zakaria, Gifari and Bhaskara, Adwitya (2022) ANALISIS KOMBINASI ALAT BERAT BERDASARKAN EFEKTIVITAS, EFISIENSI, & PRODUKTIFITAS WAKTU Studi Kasus Pembangunan Bendungan Jragung Kb. Semarang HEAVY EQUIPMENT COMBINATION ANALYSIS BASED ON EFFECTIVENESS, EFFICIENCY, & TIME PRODUCTIVITY Case Study of the Construction of the Jragung Dam Kb. Semarang. Tugas Akhir thesis, University Technology Yogyakarta.

Loe, Ludgerus P.R Asa Moruk and Bhaskara, Adwitya (2022) ANALISIS KONSEP NILAI HASIL ( ACWP, BCWP DAN BCWS ) PROYEK PEMBANGUNAN SPAM KARTAMANTUL TAHAP II, KAP 300 L/DET – PROV, D.I YOGYAKARTA ANALYSIS OF THE RESULT VALUE CONCEPT ( ACWP, BCWP AND BCWS ) KARTAMANTUL SPAM DEVELOPMENT PROJECT PHASE II, KAP 300 L/DET – PROV, D.I YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Otolua, Rendi Ramdhani and Bhaskara, Adwitya (2022) ANALISIS OPTIMALISASI PENJADWALAN PADA PROYEK DENGAN PROGRAM PROJECT MICROSOFT STUDI KASUS PROYEK GEDUNG FAKULTAS EKONOMI & BISNIS UNIVERSITAS MURIA KUDUS SCHEDULING OPTIMIZATION ANALYSIS OF PROJECTS WITH MICROSOFT PROGRAM CASE STUDY PROJECT BUILDING FACULTY OF ECONOMICS & BUSINESS MURIA KUDUS UNIVERSITY. Tugas Akhir thesis, University Technology Yogyakarta.

Maulana, Kholif Ikhsan and Bhaskara, Adwitya (2022) ANALISIS PERBANDINGAN BIAYA ANTARA BEKISTING KONVENSIONAL DAN BEKISTING TEGOFILM PADA PROYEK KONTRUKSI (Studi Kasus: Proyek Pembangunan Gedung Kantor Cabang Bri Sukoharjo) COST COMPARISON ANALYSIS BETWEEN CONVENTIONAL FORMS AND TEGOFILM FORMS ON A CONSTRUCTION PROJECT (Case Study: Bri Sukoharjo . Branch Office Building Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Septyanasari, Intan and Bhaskara, Adwitya (2022) ANALISIS PERENCANAAN KESELAMATAN KONSTRUKSI SUB STRUCTURE DECK ARCH BRIDGE Berdasarkan Permen PUPR No. 10 Tahun 2021 SUB STRUCTURE DECK ARCH BRIDGE CONSTRUCTION PLAN ANALYSIS Based on the PUPR Ministerial Decree No. 10 Year 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Putri, Sekar Wangsa and Bhaskara, Adwitya (2022) ANALISIS PERENCANAAN KESELAMATAN KONSTRUKSI UPPER STRUCTURE JEMBATAN DECK ARCH Berdasarkan Permen PUPR No. 10 Tahun 2021 ANALYSIS OF SAFETY PLANNING OF UPPER STRUCTURE BRIDGE DECK ARCH CONSTRUCTION Based on the PUPR Ministerial Decree No. 10 Year 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Apriansyah, Ilham Yudi and Bhaskara, Adwitya (2022) EFEKTIVITAS BONGKAR MUAT PETI KEMAS PT. PELABUHAN INDONESIA IV (PERSERO) CABANG KENDARI TERHADAP COST OPERASIONAL MENGGUNAKAN METODE MONTE CARLO EFFECTIVENESS OF CONTAINING UNLOADING PT. PORT OF INDONESIA IV (PERSERO) KENDARI BRANCH TO OPERATIONAL COST USING MONTE CARLO METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Hastha, Anggara and Bhaskara, Adwitya (2022) EVALUASI EFEKTIVITAS SIMPANG BERSINYAL Studi Kasus Simpang Jl. Tajem, Maguwoharjo, Kecamatan Depok, Kabupaten Sleman EVALUATION OF THE EFFECTIVENESS OF SIGNIFICANT INCHANGES Intersection Case Study Jl. Tajem, Maguwoharjo, Depok District, Sleman Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Melasari, Aan and Bhaskara, Adwitya (2022) EVALUASI KESELAMATAN KONTRUKSI PADA PEKERJAAN ERECTION DENGAN MAPPING LAYOUT BERBASIS SIG (SISTEM INFORMASI GEOGRAFI) (Studi Kaus : Proyek Pembangunan Jembatan Rangka Baja Kec. Madukara) EVALUATION OF CONSTRUCTION SAFETY ON ERECTION WORK WITH MAPPING LAYOUT BASED ON GIS (GEOGRAPHIC INFORMATION SYSTEM) (Case Study: Steel Frame Bridge Construction Project, Madukara District). Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Giska Ayunisa Rizky and Bhaskara, Adwitya (2022) MANAJEMEN KESELAMATAN KONTRUKSI PEKERJAAN STRUKTUR BAWAH JEMBATAN PELENGKUNG MURNI DENGAN ACUAN PERMEN PUPR NO 10 TAHUN 2021 CONSTRUCTION SAFETY MANAGEMENT OF PURE ARCH BRIDGE SUB-STRUCTURE WORK WITH REFERENCE TO PUPR REGULATION NO. 10 OF 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Astaghotsah, Gian and Bhaskara, Adwitya (2022) OPTIMASI BIAYA PEMBUATAN BATAKO MENGGUNAKAN LIMBAH ABU SEKAM PADI SEBAGAI SUBTITUSI SEMEN DENGAN PERSENTASE 10%, 20% DAN 30% OPTIMIZATION OF COSTS FOR MAKING BRICK USING RICE HUSK ASH WASTE AS A CEMENT SUBSTITUTION WITH 10%, 20% AND 30% PERCENTAGES. Tugas Akhir thesis, University Technology Yogyakarta.

Darmawan, Rahayu Rosalinda and Bhaskara, Adwitya (2022) PEMODELAN RENCANA ANGGRARAN BIAYA KESELAMATAN KONSTRUKSI STRUKTUR ATAS JEMBATAN PELENGKUNG MURNI DENGAN ACUAN PERMEN PUPR N0. 10 TAHUN 2021 MODELING OF THE CONSTRUCTION SAFETY COST BUDGET PLAN FOR PURE ARCH BRIDGE WITH REFERENCE PERMEN PUPR N0. 10 YEAR 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Vidianto, Diyaz and Bhaskara, Adwitya (2022) PENGARUH PANDEMI COVID-19 TERHADAP BIAYA DAN WAKTU KONSTRUKSI PADA PANDEMI COVID-19 BERDASARKAN INMEN PUPR NO 2 TAHUN 2020 THE EFFECT OF THE COVID-19 PANDEMIC ON CONSTRUCTION COSTS AND TIME IN THE COVID-19 PANDEMIC BASED ON PUPR INMEN No. 2 YEAR 2020. Tugas Akhir thesis, University Technology Yogyakarta.

Fernanda, Hendra and Bhaskara, Adwitya (2022) PENGARUH PENAMBAHAN POLIMER PET PADA ASPAL DENGAN Kajian Penambahan Polimer PET Pada Aspal Sebanyak 5%, 10% EFFECT OF ADDING PET POLYMER ON ASPHALT Study of Addition of PET Polymer to Asphalt 5%, 10%. Tugas Akhir thesis, University Technology Yogyakarta.

Pratiwi1, Nitaya Dita and Bhaskara, Adwitya (2022) PERANCANGAN KONSEP KESELAMATAN KONSTRUKSI Struktur Atas Jembatan Pelengkung Murni ½ Lantai Berdasarkan PERMEN PUPR No.10 Tahun 2021 CONSTRUCTION SAFETY DESIGN Superstructure of Pure Arch Bridge ½ Floor Based on PERMEN PUPR No. 10 of 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Febrianty, Dwi Putri and Bhaskara, Adwitya (2022) PERANCANGAN KONSEP KESELAMATAN KONSTRUKSI STRUKTUR BAWAH JEMBATAN PELENGKUNG MURNI ½ LANTAI BERDASARKAN PERMEN PUPR NO. 10 TAHUN 2021 THE DESIGN OF THE CONSTRUCTION SAFETY CONCEPT OF THE PURE ARCH ½ FLOOR BRIDGE UNDER STRUCTURE BASED ON THE PUPR REGULATION NO. 10 YEARS 2021. Tugas Akhir thesis, University Technology Yogyakarta.

Mustakim, Tio Sapag Iman and Bhaskara, Adwitya (2022) PERBANDINGAN BIAYA DAN KUAT TEKAN PADA BATAKO NORMAL DENGAN BATAKO CAMPURAN LIMBAH KERAMIK SUBTITUSI PASIR PERSENTASE 10%, 20% DAN 30% COMPARISON OF COST AND COMPRESSIVE STRENGTH OF NORMAL BRIDGE WITH CERAMIC WASTE BRIDGE WITH SAND SUBSTITUTION PERCENTAGE 10%, 20% AND 30%. Tugas Akhir thesis, University Technology Yogyakarta.

Rozzi, Lalu Fahrul and Bhaskara, Adwitya (2022) PROYEKSI PEMBOROSAN TENAGA KERJA TERINTEGRASI DENGAN IMPLEMENTASI MANAJEMEN KONSTRUKSI RAMPING (Studi Kasus: Proyek Pembangunan Bendungan Jragung Paket III Kabupaten Semarang) INTEGRATED LABOR WASTE PROJECTIONS WITH LEAN CONSTRUCTION MANAGEMENT IMPLEMENTATION (Case Study: Jragung Dam Construction Project Package III Semarang Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Notty, Samuel Rianton and Bhaskara, Adwitya (2022) PROYEKSI SISA MATERIAL TERINTEGRASI DENGAN IMPLEMENTASI MANAJEMEN KONSTRUKSI RAMPING (Studi Kasus : Proyek Pembangunan Gedung Smart and Green Learning Center (SGLC) Universitas Gadjah Mada) PROJECTION OF REST OF MATERIALS INTEGRATED WITH LEAN CONSTRUCTION MANAGEMENT IMPLEMENTATION (Case Study: Smart and Green Learning Center (SGLC) Building Project, Universitas Gadjah Mada). Tugas Akhir thesis, University Technology Yogyakarta.

Zain, Theresia Julietta Servio and Bhaskara, Adwitya (2022) PROYEKSI SISA MATERIAL TERINTEGRASI DENGAN IMPLEMENTASI MANAJEMEN KONSTRUKSI RAMPING (Studi Kasus: Proyek Pembangunan Bendungan Jragung Paket III Kabupaten Semarang) PROJECTION OF REST OF MATERIALS INTEGRATED WITH LEAN CONSTRUCTION MANAGEMENT IMPLEMENTATION (Case Study: Jragung Dam Construction Project Package III Semarang Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Ismaili, Abul Fida and Agustin, Nia and Alim, Syawaluddin (2022) similarity check THE PREVENTIVE PRIORITY PLAN BASED ON THE CAUSALITY ANALYSIS OF THE CONSTRUCTION ACCIDENT A CASE STUDY: CONSTRUCTION PROJECT OF KENTUNGAN UNDERPASS. Politeknik Negeri Jakarta, Construction and Material Journal.

Gepzy, Gally and Bhaskara, Adwitya (2022) ANALISIS PERBANDINGAN BIAYA MATERIAL BEKISTING ANTARA MULTIPLEK DENGAN TEGOFILM PADA GEDUNG BERTINGKAT (Studi Kasus: Pembangunan Gedung Dormitory LIPI Karangsambung) MATERIAL COST COMPARISON ANALYSIS FORM BETWEEN MULTIPLE WITH TEGOFILM IN-STORE BUILDING (Case Study: Construction of the LIPI Karangsambung Dormitory Building). Tugas Akhir thesis, University Technology Yogyakarta.

Sedyo Gumelar Ade Setiawan, Dwi and Bhaskara, Adwitya (2022) ANALISIS PERBANDINGAN NILAI EKONOMIS BEKISTING MULTIPLEK DAN BEKISTING TEGOFILM PADA KOLOM DAN BALOK (Studi Kasus Proyek Pembangunan Gedung Rumah Sakit Prima Sehat Pekalongan) ECONOMIC VALUE COMPARISON ANALYSIS MULTIPLEX FORM AND TEGO FILM FORM ON COLUMN AND BEAM. Tugas Akhir thesis, University Technology Yogyakarta.

Prabadijaya, Sukma Tesa and Bhaskara, Adwitya (2022) ANALISIS PERCEPATAN PROYEK DENGAN MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus: Proyek Pembangunan Gedung Geodiversity Karangsambung) PROJECT ACCELERATION ANALYSIS WITH USING THE TIME-COST TRADE-OFF METHOD (Case Study: Karangsambung Geodiversity Building Project). Tugas Akhir thesis, University Technology Yogyakarta.

Allo, Risky Irianto Girik and Bhaskara, Adwitya (2022) ANALISIS WASTE MATERIAL DENGAN PENERAPAN LEAN CONSTRUCTION (Studi Kasus : Proyek Pembangunan Fasilitas Kawasan Geodiversitas Indonesia Karangsambung Paket 2) WASTE MATERIAL ANALYSIS WITH LEAN CONSTRUCTION APPLICATION (Case Study: Karangsambung Indonesia Geodiversity Area Facility Development Project Package 2). Tugas Akhir thesis, University Technology Yogyakarta.

Sinthia, Monica and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN RISIKO KESELAMATAN KERJA DENGAN MENGGUNAKAN METODE SEVERITY INDEX (Studi Kasus : Proyek Pembangunan Apartemen Barsa City) ANALYSIS OF OCCUPATIONAL SAFETY RISK MANAGEMENT USING SEVERITY INDEX METHOD (Case Study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Purnomo, Alika Andi and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN PRODUKTIVITAS PADA PEKERJAAN KOLOM DAN BALOK BERDASARKAN PERMEN PUPR 28-2016 DAN LAPANGAN Studi Kasus : Proyek Renovasi Pembangunan Masjid FMIPA UGM COMPARATIVE ANALYSIS OF PRODUCTIVITY ON COLUMN AND BEAM WORK BASED ON PUPR Ministerial Decree 28-2016 AND FIELD METHOD Case Study : Renovation Project for Mosque Construction of FMIPA UGM Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Hialendra, Diuta and Bhaskara, Adwitya (2021) EVALUASI REKAYASA NILAI DENGAN MENGGUNAKAN ANALISIS SEMI-ESTIMASI PADA SHEARWALL (Studi Kasus: Pembangunan Rumah Susun Univ. Ris Maduma) EVALUATION OF VALUE ENGINEERING USING SEMI-ESTIMATION ANALYSIS ON SHEARWALL (Case Study: Construction of Flats at Ris Maduma Univ.). Tugas Akhir thesis, University Technology Yogyakarta.

Wardani, Widya and Bhaskara, Adwitya (2021) ANALISIS EFISIENSI WAKTU DAN BIAYA BERDASARKAN KOMBINASI ALAT BERAT PADA PEKERJAAN STRUKTUR BAWAH Studi Kasus: Proyek Pembangunan Jalur Kereta Api New Yogyakarta International Airport TIME AND COST EFFICIENCY ANALYSIS BASED ON HEAVY EQUIPMENT COMBINATIONS ON LOWER STRUCTURE WORKS Case Study: New Yogyakarta International Airport Railroad Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

Zai, Ebenhaezer and Bhaskara, Adwitya (2021) ANALISIS KONSTRUKSI RAMPING PADA PERENCANAAN DESAIN BALOK Studi Kasus: Pembangunan Rumah Susun RIS Maduma ANALYSIS OF LEAN CONSTRUCTION ON BEAM DESIGN PLANNING Case Study: Construction of RIS Maduma Flats. Tugas Akhir thesis, University Technology Yogyakarta.

Damanik, Divan Yoan Alvino and Bhaskara, Adwitya (2021) ANALISIS KONSTRUKSI RAMPING PADA PERENCANAAN DESAIN KOLOM Studi Kasus: Proyek Pembangunan Gedung Rusunawa Universitas Ris Maduma LEAN CONSTRUCTION ANALYSIS IN COLUMN DESIGN PLANNING Case Study: Ris Maduma University Rusunawa Building Project. Tugas Akhir thesis, University Technology Yogyakarta.

Alpiansyah, Alpiansyah and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN KESELAMATAN KONSTRUKSI DENGAN MENGGUNAKAN METODE IBPRPR DAN BOWTIE (Studi Kasus: Proyek Pembangunan Underpass Bulak Kapal (MYC)) CONSTRUCTION SAFETY MANAGEMENT ANALYSIS USING IBPRPR AND BOWTIE METHODS (Case Study: Bulak Kapal (MYC) Underpass Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Wardani, Jayani Kusuma and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN LIMBAH BAHAN MATERIAL KONSTRUKSI DENGAN KONSEP GREEN CONSTRUCTION (Studi Kasus: Proyek Pembangunan Apartemen Barsa City) CONSTRUCTION MATERIAL WASTE MANAGEMENT ANALYSIS WITH GREEN CONSTRUCTION CONCEPT (Case Study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Wanandi, Titus Patrik and Bhaskara, Adwitya (2021) ANALISIS OPTIMALISASI PENJADWALAN PADA PROYEK DENGAN MICROSOFT PROJECT Studi Kasus Proyek Proyek Pembangunan Gedung Student Center Politeknik Negeri Indramayu SCHEDULING OPTIMIZATION ANALYSIS ON PROJECTS WITH MICROSOFT PROJECT Case Study of the Indramayu State Polytechnic Student Center Building Project Project. Tugas Akhir thesis, University Technology Yogyakarta.

Meilani, Cindy Duwi and Bhaskara, Adwitya (2021) ANALISIS OPTIMALISASI PENJADWALAN PADA PROYEK MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Proyek Pembangunan Gedung Asrama Terpadu MTsN 1 Semarang) SCHEDULING OPTIMIZATION ANALYSIS ON PROJECTS USING MICROSOFT PROJECT (Case Study of the Integrated Dormitory Building Project for MTsN 1 Semarang). Tugas Akhir thesis, University Technology Yogyakarta.

Permadi, Nandya Sutan and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN INDEKS PEKERJAAN BETON BERTULANG PADA PILE CAP DAN TIE BEAM BERDASARKAN PERMEN PUPR 28-2016 DAN LAPANGAN COMPARISONAL ANALYSIS OF REINFORCED CONCRETE WORK INDEX ON PILE CAP AND TIE BEAM BASED ON PUPR Ministerial Decree 28-2016 AND FIELD. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Andika Tri and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN METODE KONVENSIONAL FLOOR TO FLOOR DAN METODE SEMI-SISTEM CLIMBING Studi Kasus Pekerjaan Shearwall pada Proyek Pembangunan Apartement Barsa City Yogyakarta COMPARISON ANALYSIS OF CONVENTIONAL FLOOR TO FLOOR AND SEMI-CLIMBING METHODS Case Study of Shearwall's Work on the Yogyakarta Barsa City Apartment Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Rama, Hanif Farhan Setya and Bhaskara, Adwitya (2021) ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN DENGAN METODE FMEA DAN HAZOP (Studi Kasus: Proyek Rehabilitasi Bangunan Pasar Johar Selatan, Semarang) WORK ACCIDENT RISK ANALYSIS AT DEVELOPMENT PROJECTS WITH FMEA AND HAZOP METHODS (Case Study: South Johar Market Building Rehabilitation Project, Semarang). Tugas Akhir thesis, University Technology Yogyakarta.

Mubin, Muhammad Aziz and Bhaskara, Adwitya (2021) ANALISIS WASTE MANPOWER DENGAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus : Proyek Pembangunan Prasarana Pengendalian Banjir Kawasan Strategis Nyia Pada Das Serang (Ksn Yia) Kulon Progo) WASTE MANPOWER ANALYSIS WITH LEAN CONSTRUCTION MANAGEMENT APPLICATION (Case Study: Regional Flood Control Infrastructure Development Project Nyia's Strategic In Serang Watershed (Ksn Yia) Kulon Progo). Tugas Akhir thesis, University Technology Yogyakarta.

Jaladara, Raepaksi and Bhaskara, Adwitya (2021) ANALISIS WASTE MATERIAL DENGAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus: Proyek Pembangunan Prasarana Pengendali Banjir Kawasan Strategis NYIA Pada Das Serang (KSN YIA) Kulon Progo) WASTE MATERIAL ANALYSIS WITH LEAN CONSTRUCTION MANAGEMENT APPLICATION (Case Study: Flood Control Infrastructure Development Project for Strategic Areas of NYIA in Serang Watershed (KSN YIA) Kulon Progo). Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Christanto Febri and Bhaskara, Adwitya (2021) OPTIMALISASI PENJADWALAN PADA PEKERJAAN STRUKTUR DENGAN PROGRAM APLIKASI PRIMAVERA PROJECT PLANNER P3 Studi Kasus Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas Isip Universitas Jendral Soedirman SCHEDULING OPTIMIZATION ON STRUCTURE WORK WITH PRIMAVERA PROJECT PLANNER APPLICATION PROGRAM P3 Case Study of the Learning Service Building Project, Faculty of Social Sciences, Jendral Sudirman University. Tugas Akhir thesis, University Technology Yogyakarta.

Masagala, Alfatsya Mubian and Bhaskara, Adwitya (2021) OPTIMASI SITE LAYOUT MENGGUNAKAN MULTI OBJECTIVES FUNCTION (Studi kasus: Proyek Pembangunan Apartement Barsa City) SITE LAYOUT OPTIMIZATION USING MULTI OBJECTIVES FUNCTION (Case study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

ramadhan, Muhammad Risqi and Bhaskara, Adwitya (2021) PERBANDINGAN PRODUKTIVITAS PENGECORAN STRUKTUR KOLOM BALOK DAN PELAT LANTAI MENGGUNAKAN CONCRETE PUMP DAN CONCRETE BUCKET COMPARISON OF PRODUCTIVITY OF CASTING STRUCTURES OF BEAMS AND FLOOR Slabs USING CONCRETE PUMP AND CONCRETE BUCKET. Tugas Akhir thesis, University Technology Yogyakarta.

Bhaskara, Adwitya and Dita Saputro, Cahyo and Ismaili, Abul Fida and Agustin, Nia and Alim, Syawaluddin (2021) THE PREVENTIVE PRIORITY PLAN BASED ON THE CAUSALITY ANALYSIS OF THE CONSTRUCTION ACCIDENT A CASE STUDY: CONSTRUCTION PROJECT OF KENTUNGAN UNDERPASS. Politeknik Negeri Jakarta, Construction and Material Journal.

Dewi Sarahwati, Nuke and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No. 21 TAHUN 2019 Studi Kasus Pekerjaan Kolom Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jenderal Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PWPH No.21 of 2019 Case Study on Column Work for the Construction of Learning Services Building Project, Faculty of ISIP, Jenderal Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Galih Ramadani, Muhammad and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No.21 TAHUN 2019 Studi Kasus Pekerjaan Plat Lantai Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jendral Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PWPH No.21 of 2019 A Case Study of Floor Plate Work on the Learning Service Building Project of the Faculty of Social and Political Sciences, Jendral Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Setiabudi, Feri and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No.21 TAHUN 2019 Studi Kasus: Pekerjaan Struktur Balok Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jenderal Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PUPR No.21 of 2019 Case Study: Block Structure Work in the Learning Service Building Project of the Faculty of ISIP, Jenderal Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Salsabila Anggriyanto, Ahimsa and Bhaskara, Adwitya (2021) EVALUASI RISIKO PRODUKTIVITAS ALAT TERHADAP PEKERJAAN PENGECORAN DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Rumah Susun Aparatur Sipil Negara (ASN) Balai Besar Wilayah Sungai (BBWS) Serayu Opak RISK EVALUATION OF TOOL PRODUCTIVITY TOWARD CASTING WORK USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD Case Study of the Project for the Construction of the State Civil Apparatus Flats (ASN) Serayu Opak River Basin. Tugas Akhir thesis, University of Technology Yogyakarta.

Indria Wijaya, Prima and Bhaskara, Adwitya (2021) ANALISIS BIAYA PEKERJAAN BETON BERTULANG DENGAN MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Proyek Pembangunan Rusun Gowok, Yogyakarta) ANALYSIS OF WORK COST OF REPEATABLE CONCRETE USING THE MICROSOFT PROJECT (Case Study of Gowok Flat Development Project, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Riski Kurniawan, Riyan and Bhaskara, Adwitya (2021) ANALISIS IBPRP DAN JSA BERDASARKAN PERMEN PUPR NO. 21 TAHUN 2019 Studi Kasus : Pekerjaan Struktur Fondasi Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jendral Soedirman Purwokerto IBPRP AND JSA ANALYSIS BASED ON MINISTRY REGULATION PUPR NO. 21 YEAR 2019 Case Study: Work of Foundation Structures in the Learning Service Building Project of the Faculty of Social and Political Sciences, Jendral Soedirman Purwokerto University. Tugas Akhir thesis, University Technology Yogyakarta.

Bayu Pratama, Bagas and Bhaskara, Adwitya (2021) ANALISIS KUAT TEKAN INTERLOCK BRICK DENGAN BAHAN TAMBAH 10% EGGSHELL DAN 19%, 22%, 25% PUMICE TERHADAP BIAYA PRODUKSI ANALYSIS OF COMPRESSIVE STRENGTH OF INTERLOCK BRICK WITH 10% EGGSHELL ADDITIONAL MATERIALS AND 19%, 22%, 25% PUMICE ON PRODUCTION COSTS. Tugas Akhir thesis, University Technology Yogyakarta.

Balagaise, Alfred and Bhaskara, Adwitya (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA DI LAPANGAN PADA PEKERJAAN KOLOM, BALOK DAN PLAT LANTAI (Studi Kasus Proyek Pembangunan Gedung Kampus Universitas Jenderal Soedirman) ANALYSIS OF LABOR PRODUCTIVITY IN THE WORK OF BEAM COLUMNS AND FLOOR PLATES. Tugas Akhir thesis, University Technology Yogyakarta.

Rizqhi, Ahkmad and Bhaskara, Adwitya (2021) OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE LEAST COST ANALYSIS Studi Kasus Proyek Rehabilitasi Pasar Prawirotaman, Yogyakarta COST AND TIME OPTIMIZATION OF PROJECT USING LEAST COST ANALYSIS METHOD Case Study of Prawirotaman Market Rehabilitation Project, Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Alim, Syawaluddin and Bhaskara, Adwitya (2020) ANALISIS KAUSALITAS KECELAKAAN KONSTRUKSI BERDASARKAN PENILAIAN KONTRAKTOR DENGAN FAULT TREE ANALYSIS (FTA) Studi Kasus: Proyek Pembangunan Underpass Kentungan CONSTRUCTION ACCIDENT CAUSALITY ANALYSIS BASED ON CONTRACTOR ASSESSMENT WITH FAULT TREE ANALYSIS (FTA) A Case Study: Kentungan Underpass Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Benadikta, Firdamarsha and Bhaskara, Adwitya (2020) ANALISIS KAUSALITAS KECELAKAAN KONSTRUKSI BERDASARKAN PENILAIAN KONSULTAN PENGAWAS DENGAN FAULT TREE ANALYSIS (FTA) Studi Kasus Proyek Pembangunan Underpass Kentungan CONSTRUCTION ACCIDENT CAUSALITY ANALYSIS BASED ON ASSESSMENT OF SUPERVISORY CONSULTANTS WITH FAULT TREE ANALYSIS (FTA) Kentungan Underpass Development Project Case Study. Tugas Akhir thesis, University Technology Yogyakarta.

Silviati, Tresilia Diah and Bhaskara, Adwitya (2020) ANALISIS MANAJEMEN RISIKO DENGAN MENGGUNAKAN METODE THRESHOLD DAN ANALYTICAL HIERARCH PROCESS (AHP) Studi Kasus: Proyek Pembangunan Hotel Manohara Yogyakarta RISK MANAGEMENT ANALYSIS USING THRESHOLD AND ANALYTICAL HIERARCH PROCESS (AHP) METHOD A Case Study: Yogyakarta Manohara Hotel Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Grace, Marselina Wela and Bhaskara, Adwitya (2020) ANALISIS MANAJEMEN RISIKO DENGAN MENGGUNAKAN METODE THRESHOLD RISK DAN FAILURE MODE AND EFFECT ANALYSIS (FMEA) Studi Kasus: Proyek Pembangunan Hotel Manohara Yogyakarta RISK MANAGEMENT ANALYSIS USING THRESHOLD RISK METHOD AND FAILURE MODE AND EFFECT ANALYSIS (FMEA) A Case Study: Yogyakarta Manohara Hotel Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Maulana, Fuad Muhamad and Bhaskara, Adwitya (2020) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PROYEK DENGAN MENGGUNAKAN LINEAR SCHEDULING METHOD Studi Kasus: Proyek Pembangunan Jalan Madang-Jarak COMPARATIVE ANALYSIS OF PROJECT TIME AND COST USING LINEAR SCHEDULING METHOD A Case Study: Madang-Jarak Road Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Pernanda, Firman and Bhaskara, Adwitya (2020) ANALISIS PRODUKTIVITAS KOMBINASI ALAT BERAT DAN BIAYA PADA PEKERJAAN JALAN Studi Kasus: Proyek Rehabilitas/Pemeliharaan Jalan Suput-Kambitin Kalimantan Selatan ANALYSIS OF PRODUCTIVITY COMBINATION OF HEAVY EQUIPMENT AND COST IN ROAD WORK A Case Study: Project for Rehabilitation / Maintenance of Suput-Kambitin Road, South Kalimantan. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Tomy and Bhaskara, Adwitya (2020) ANALISIS RISIKO KONSTRUKSI DENGAN METODE SEVERITY INDEX (SI) TERHADAP MATRIK PROBABILITAS DAMPAK STUDI KASUS : GEDUNG STUDENT DORMITORY UNIVERISTAS MUHAMMADIYAH YOGYAKARTA CONSTRUCTION RISK ANALYSIS USING SEVERITY INDEX (SI) METHOD ON IMPACT PROBABILITY MATRIX CASE STUDY: STUDENT DORMITORY BUILDING MUHAMMADIYAH YOGYAKARTA UNIVERSITY. Tugas Akhir thesis, University Technology Yogyakarta.

Phandi, Mohamad Nafsin Al and Bhaskara, Adwitya (2020) ANALISIS VALUE ENGINEERING PADA PEKERJAAN KONSTRUKSI BEKISTING RUMAH SUSUN POLRI GOWOK UNTUK BINTARA ANALYSIS OF VALUE ENGINEERING IN THE CONSTRUCTION WORK OF THE POLRI GOWOK FLATS FOR BINTARA. Tugas Akhir thesis, University Technology Yogyakarta.

Pramata, Rama and Bhaskara, Adwitya (2020) EARNED VALUE CONCEPT TERHADAP BIAYA DAN WAKTU MENGGUNAKAN METODE CRASHING SHIFT KERJA EARNED VALUE CONCEPT TO COST AND TIME USING THE WORKING SHIFT CRASHING METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Ginting, Albert Atmaja and Bhaskara, Adwitya (2020) EVALUASI WASTE DAN PENERAPAN LEAN CONSTRUCTION Studi Kasus: Proyek Pembangunan Teaching Industry Learning Center (TILC) Universitas Gadjah Mada WASTE EVALUATION AND LEAN CONSTRUCTION APPLICATION A Case Study: Gadjah Mada University Teaching Industry Learning Center (TILC) Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Pratama, Muhammad Indra and Bhaskara, Adwitya (2020) KOMPARASI BIAYA DAN WAKTU PEKERJAAN TIANG PANCANG MENGGUNAKAN METODE HYDRAULIC STATIC PILE DRIVER DENGAN DROP HAMMER Studi Kasus Proyek Pembangunan Gedung Pusat Penelitian, Pendidikan, Dan Kebudayaan PP Muhammadiyah Yogyakarta COST AND TIME COMPARISON OF PILE WORK USING HYDRAULIC STATIC PILE DRIVER WITH DROP HAMMER A Case Study of the Project for the Construction of the Research, Education and Culture Center Building of PP Muhammadiyah Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Berlianti, Lia Anjar and Bhaskara, Adwitya (2020) MANAJEMEN SISA MATERIAL DAN LIMBAH KONSTRUKSI PADA PROYEK REHABILITASI PASAR PRAWIROTAMAN DENGAN KONSEP GREEN CONSTRUCTION MATERIAL REST AND CONSTRUCTION WASTE MANAGEMENT IN PRAWIROTAMAN MARKET REHABILITATION PROJECT WITH GREEN CONSTRUCTION CONCEPT. Tugas Akhir thesis, University Technology Yogyakarta.

Wahid, Muhammad Nur and Bhaskara, Adwitya (2020) PENJADWALAN ULANG (RESCHEDULE) DENGAN EVALUASI KONSEP NILAI HASIL (EARNED VALUE CONCEPT) Studi Kasus Proyek Peningkatan Jalan Wiyoro-Ngipik Kecamatan Banguntapan Kabupaten Bantul Yogyakarta RESCHEDULE WITH EARNED VALUE CONCEPT EVALUATION A Case Study of the Wiyoro-Ngipik Road Improvement Project in Banguntapan District, Bantul Regency, Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Oktavian, Titis and Bhaskara, Adwitya (2020) PENJADWALAN ULANG (RESCHEDULE) DENGAN EVALUASI KONSEP NILAI HASIL (EARNED VALUE CONCEPT) Studi Kasus Proyek Pembangunan Embung Serbaguna Tambaksari Kabupaten Cilacap Jawa Tengah RESCHEDULE WITH EARNED VALUE CONCEPT EVALUATION A Case Study of the Tambaksari Multipurpose Embung Development Project, Cilacap Regency, Central Java. Tugas Akhir thesis, University Technology Yogyakarta.

Hidayatulloh, Hidayatulloh and Bhaskara, Adwitya (2020) ANALISA RISIKO KONSTRUKSI DARI SUDUT PANDANG KONTRAKTOR PADA PROYEK PEMBANGUNAN JEMBATAN KALIWADER Studi Kasus Proyek Pembangunan Jembatan Kaliwader Kabupaten Purworejo CONSTRUCTION RISK ANALYSIS FROM CONTRACTOR VIEWS IN THE KALIWADER BRIDGE CONSTRUCTION PROJECT Case Study of the Kaliwader Bridge Construction Project in Purworejo Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Saputro, Ridho and Bhaskara, Adwitya (2020) ANALISIS PERBANDINGAN EFISIENSI DENGAN OVER TIME DAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (Studi Kasus : Proyek Penataan Embung Sendari Kecamatan Mlati, Kabupaten Sleman, Yogyakarta) COMPARATIVE ANALYSIS OF EFFICIENCY WITH OVER TIME AND LABOR ADDITION USING THE TIME COST TRADE OFF METHOD (Case Study: Sendari Reservoir Restructuring Project in Mlati District, Sleman Regency, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Aditya Pratama and Bhaskara, Adwitya (2020) ANALISIS PERBANDINGAN PRODUKTIVITAS DAN BIAYA OPERASIONAL TOWER CRANE DENGAN MOBILE CRANE PADA PROYEK GEDUNG Studi Kasus: Proyek Pembangunan RSUD Tidar Kota Magelang COMPARATIVE ANALYSIS OF PRODUCTIVITY AND OPERATIONAL COST BETWEEN TOWER CRANE AND MOBILE CRANE IN BUILDING PROJECTS Case Study: Development Project of RSUD Tidar, Magelang. Tugas Akhir thesis, University Technology Yogyakarta.

Muzaki, Agil Prima and Bhaskara, Adwitya (2020) ANALISIS PERCEPATAN WAKTU PROYEK DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI Studi Kasus: Proyek Pembangunan Gedung PMDPM RSUD Bumiayu Kabupaten Brebes ANALYSIS OF PROJECT TIME ACCELERATION BY ADDING OPTIMUM WORKING HOURS IN CONSTRUCTION PROJECTS Case Study: Building Project PMDPM Bumiayu District Hospital Brebes. Tugas Akhir thesis, University Technology Yogyakarta.

Nitake, Yosua and Bhaskara, Adwitya (2020) ANALISIS PERHITUNGAN PAYBACK PERIOD PROYEK PEMBANGUNAN GEDUNG FAKULTAS EKONOMI UNIVERSITAS SAM RATULANGI MANADO ANALYSIS OF PAYBACK PERIOD CALCULATION OF THE CONSTRACTION PROJECT OF FACULTY OF ECONOMIC BUILDING, SAM RATULANGI MANADO UNIVERSITY. Tugas Akhir thesis, University Technology Yogyakarta.

Ardiyanto, Rian and Bhaskara, Adwitya (2020) EVALUASI WAKTU PROYEK DENGAN METODE KONSEP NILAI HASIL (EARNED VALUE CONCEPT) (Studi Kasus Proyek Pembangunan Rusun Gowok, Yogyakarta) EVALUATION OF PROJECT TIME USING EARNED VALUE CONCEPT (Case Study of the Gowok Flats Construction Project, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

febriyanto, Dedy and Bhaskara, Adwitya (2020) PENENTUAN RISIKO KONTRAKTOR DENGAN METODE THRESHOLD RISK DAN AHP (ANALYTICAL HIERARCHY PROCESS) (StudiKasus: Proyek Pembangunan UnderpassSimpangKentungan Yogyakarta) DETERMINATION OF CONTRACTOR RISK USING THRESHOLD RISK AND AHP (ANALYTICAL HIERARCHY PROCESS) METHODS (Case Study: Jogja Underpass Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Wibowo, Fajar Khoni and Bhaskara, Adwitya (2020) PERBANDINGAN BIAYA TENAGA KERJA BORONGAN TERHADAP PERATURAN KEMENTRIAN PEKERJAAN UMUM NO. 28 TAHUN 2016 PADA PEKERJAAN PENULANGAN DAN PENGECORAN BALOK COMPARISON BETWEEN FIXED LUMP SUM PRICE AND REGULATION OF THE MINISTRY OF PUBLIC WORK NO. 28 OF 2016 IN BEAMING AND CASTING WORK. Tugas Akhir thesis, University Technology Yogyakarta.

Pamungkas, Petrus Kristiawan and Bhaskara, Adwitya (2020) PROJECT ACCELERATION PADA PEKERJAAN STRUKTUR JALAN DENGAN METODE SHIFT STUDI KASUS PROYEK PEMBANGUNAN RUAS JALAN GADING PLAYEN GUNUNGKIDUL PROJECT ACCELERATION ON THE ROAD STRUCTURE WORK USING THE SHIFT METHOD CASE STUDY OF ROAD CONSTRUCTION PROJECT GADING PLAYEN GUNUNGKIDUL. Tugas Akhir thesis, University Technology Yogyakarta.

Ardian, Ariska Suci and Bhaskara, Adwitya (2019) ANALISIS EFISIENSI DAN EFEKTIVITAS HARGA SATUAN PEKERJAAN BERDASARKAN UPAH BORONGAN DAN PERATURAN KEMENTRIAN PEKERJAAN UMUM NO. 28 TAHUN 2016 Studi Kasus: Dinding Pasangan Bata Proyek Pembangunan Gedung Fakultas Hukum Universitas Islam Indonesia ANALYSIS OF EFFICIENCY AND EFFECTIVENESS OF WORK UNIT PRICE BASED ON STORAGE WAGES AND REGULATION OF PUBLIC JOB MINISTRY NO. 28 of 2016 Case Study: Brick Wall Building Project of the Faculty of Law Building of the Islamic University of Indonesia. Tugas Akhir thesis, University Technology Yogyakarta.

Wahyudi, Arif and Bhaskara, Adwitya (2019) ANALISIS MANAJEMEN MATERIAL PROYEK DENGAN METODE JUST IN TIME STUDI KASUS PROJECT POLYPLEX NEW POLYSTER FACTORY SERANG, BANTEN ANALYSIS OF PROJECT MATERIAL MANAGEMENT USING JUST IN TIME METHOD CASE STUDY OF PROJECT POLYPLEX NEW POLYSTER FACTORY SERANG, BANTEN. Tugas Akhir thesis, University Technology Yogyakarta.

Susanto, Tri and Bhaskara, Adwitya (2019) ANALISIS PERBANDINGAN UPAH KERJA BORONGAN TERHADAP PERATURAN KEMENTRIAN PEKERJAAN UMUN NO. 28 TAHUN 2016 PADA PEKERJAAN BETON BERTULANG (Studi Kasus: Proyek Pembangunan Gedung Layanan Alumni Universitas Negeri Yogyakarta) ANALYSIS OF COMPARISON OF WORKING WAGES ON REGULATION OF THE MINISTRY OF GENERAL JOBS NO. 28 OF 2016 ON REINFORCED CONCRETE WORK (Case Study: Project for Building Alumni Services in Yogyakarta State University). Tugas Akhir thesis, University Technology Yogyakarta.

Utama, Ginanjar Suprayogi and Bhaskara, Adwitya (2019) ANALISIS PRODUKTIVITAS KELOMPOK TENAGA KERJA PADA PEKERJAAN PLESTERAN DINDING DENGAN METODE WORK STUDY (Studi Kasus Proyek Pembangunan Gedung Fakultas Hukum Universitas Islam Indonesia Kabupaten Sleman) ANALYSIS OF PRODUCTIVITY OF LABOR GROUPS ON WALL PLASTERING WORK WITH WORK STUDY METHOD (Case Study of Building Project of the Faculty of Law Building, Islamic University of Indonesia, Sleman Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Octaviana, Ipink and Bhaskara, Adwitya (2019) ANALISIS VALUE ENGINEERING FONDASI BORED PILE DENGAN FONDASI SUMURAN PADA JEMBATAN KRAGAN KABUPATEN KARANGANYAR ANALYSIS OF VALUE ENGINEERING BORED PILE FOUNDATION WITH WELL FOUNDATION IN KRAGAN BRIDGE, KARANGANYAR DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Sari, Intan Puspita Ratna and Bhaskara, Adwitya (2019) EVALUASI PROJECT ACCELERATION PADA PEKERJAAN STRUKTUR JEMBATAN DENGAN METODE OVER TIME (Studi Kasus: Proyek Pembangunan Jembatan Kragan Kabupaten Karanganyar) EVALUATE PROJECT ACCELERATION ON BRIDGE STRUCTURE WORK USING OVER TIME METHOD (Case Study: Kragan Bridge Construction Project in Karanganyar Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Purbiantoro, Alvian and Bhaskara, Adwitya (2019) FAULT TREE ANALYSIS DAN AUDIT AKURASI PADA PENERAPAN SISTEM MANAJEMEN KESELAMATAN KERJA KONSTRUKSI TERINTEGRASI Studi Kasus: Proyek Pembangunan Gedung Pelayanan (Fisik) RSUD Tidar Kota Magelang, Kontraktor B1 FAULT TREE ANALYSIS AND ACCURACY AUDITS ON APPLICATION INTEGRATED CONSTRUCTION WORK SAFETY MANAGEMENT SYSTEM Case Study: Service Building Construction Project (Physical) Tidar Regional Hospital Magelang City, B1 Contractor. Tugas Akhir thesis, University Technology Yogyakarta.

Pradana, Gigih and Bhaskara, Adwitya (2019) PENENTUAN RISIKO PROYEK KONTRUKSI SWAKELOLA DENGAN INTEGRASI THRESHOLD RISK DAN AHP (ANALYTICAL HIERACY PROCES) Studi Kasus Pembangunan Gedung Fakultas Ilmu Agama Islam Universitas Islam Indonesia DETERMINATION OF RISK OF SELF-MANAGED CONSTRUCTION PROJECTS WITH INTEGRATION OFTHRESHOLD RISK AND AHP (ANALYTICAL HIERACY PROCES) Case Study of the Building of the Faculty of Islamic Studies in the Islamic University of Indonesia. Tugas Akhir thesis, University Technology Yogyakarta.

Bhaskara, Adwitya and Nugraheni, Fitri and Hanafi, Nufrizal Faried (2019) Recommendation of Knockdown Building Design at Yogyakarta Sand Dunes (Restricted and Heritage Areas). In: Semesta Teknika Vol 22, No 1 (2019).

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Agustin, Nia HKI: Analisis Kausalitas Kecelakaan Konstruksi Dengan Pendekatan Fault Tree Analysis (FTA). Universitas Teknologi Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Agustin, Nia Peer Review HKI: Rencana Prioritas Preventif Berdasarkan Analisis Kausalitas Kecelakaan Konstruksi. Universitas Teknologi Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Setiawan, Danny Similarity Analisis Kausalitas Kecelakan Konstruksi dengan Pendekatan Analogi Fault Tree Analysis (FTA). Teknik Sipil UTY. (Unpublished)

This list was generated on Sun Dec 22 08:06:25 2024 WIB.