Items where Author is "Saputro, Cahyo Dita"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 69.

Thesis (Skripsi, Tugas Akhir or Kerja Praktek)

Saputro, Cahyo Dita and Setiawan, Wira (2023) PERBAANDINGAN DESAIN STRUKTUR DAN BIAYA PC-I GIRDER DAN PC-T GIRDER DENGAN BENTANG 30,8 METER COMPARISON OF STRUCTURE DESIGN AND COST OF PC-I GIRDER AND PC-T GIRDER WITH SPAN OF 30.8 METERS. Tugas Akhir thesis, University Technology Yogyakarta.

Manan, Rizal Abdul and Saputro, Cahyo Dita (2022) ANALISIS FAKTOR PRODUKTIVITAS ALAT BERAT PEKERJAAN GALIAN MENGGUNAKAN ANALYTICAL HIERARCHY PROCESS (AHP) PRODUCTIVITY FACTOR ANALYSIS OF HEAVY EQUIPMENT WORKING EXCURSION USING ANALYTICAL HIERARCHY PROCESS (AHP). Tugas Akhir thesis, University Technology Yogyakarta.

Mustika, Gilang and Saputro, Cahyo Dita (2022) ANALISIS KRITERIA PENENTUAN PEMENANG LELANG JASA KONSTRUKSI MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS (AHP) CRITERIA ANALYSIS OF WINNING CONSTRUCTION SERVICES TENDER USING ANALYTIC HIERARCHY PROCESS (AHP) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Rahman, Andika Fatur and Saputro, Cahyo Dita (2022) ANALISIS PENJADWALAN PROYEK PEMBANGUNAN SABO DAM KALI OPAK MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM) SCHEDULING ANALYSIS OF THE SABO DAM KALI OPAK DEVELOPMENT PROJECT USING THE PRECEDENCE DIAGRAM METHOD (PDM). Tugas Akhir thesis, University Technology Yogyakarta.

Aditya, Bima and Saputro, Cahyo Dita (2022) ANALISIS PRODUKTIVITAS KELOMPOK ALAT BERAT PADA PEKERJAAN CUTTING DENGAN METODE MPDM (METHOD PRODUCTIVITY DELAY MODEL) PRODUCTIVITY ANALYSIS OF HEAVY EQUIPMENT GROUP ON CUTTING WORK WITH MPDM METHOD (METHOD PRODUCTIVITY DELAY MODEL) (Case study: Tepus JJLS Development Project – Jerukwudel Gunungkidul) (Studi kasus: Proyek Pembangunan JJLS Tepus – Jerukwudel Gunungkidul). Tugas Akhir thesis, University Technology Yogyakarta.

Vauzi, M Ihwan Nur and Saputro, Cahyo Dita (2022) ANALISIS PRODUKTIVITAS TENAGA KERJA pada PEKERJAAN KOLOM dengan METODE TIME STUDY (Studi Kasus : Proyek Pembangunan Masjid Walidah Dahlan UNISA) ANALYSIS OF LABOR PRODUCTIVITY ON COLUMN WORK WITH TIME STUDY METHOD (Case Study: UNISA Walidah Dahlan Mosque Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Nurrohman, Miftakhul and Saputro, Cahyo Dita (2022) ANALISIS RISIKO PROYEK PEMBANGUNAN JALAN PADA PEKERJAAN GALIAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) (Studi Kasus: JJLS paket Tepus – Jerukwudel Kabupaten Gunungkidul) RISK ANALYSIS OF ROAD CONSTRUCTION PROJECTS IN EXCUREMENT WORKS ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (Case Study: JJLS package Tepus – Jerukwudel, Gunungkidul Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Yulia, Eva and Saputro, Cahyo Dita (2022) EVALUASI MANAJEMEN LALU LINTAS AKIBAT AKTIVITAS PASAR KOLOMBO TERHADAP KINERJA RUAS JALAN KALIURANG YOGYAKARTA EVALUATION OF TRAFFIC MANAGEMENT DUE TO COLOMBO MARKET ACTIVITIES ON THE PERFORMANCE OF THE KALIURANG ROAD SEGMENT, YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Dewi, Yuski Puspita and Saputro, Cahyo Dita (2022) ANALISA KELAYAKAN INVESTASI PERUMAHAN ROCK REGENCY KABUPATEN KULON PROGO DENGAN METODE NET PRESENT VALUE (NPV) FEASIBILITY ANALYSIS OF ROCK REGENCY HOUSING INVESTMENT IN KULON PROGO REGENCY USING NET PRESENT VALUE (NPV) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Kreisiananta Dwi and Saputro, Cahyo Dita (2022) ANALISIS MANAJEMEN RISIKO PEKERJAAN KOLOM PADA PROYEK REVO TOWN MALL DAN STASIUN TRANSIT LRT BEKASI BARAT RISK MANAGEMENT ANALYSIS OF COLUMN WORK ON REVO TOWN MALL PROJECT AND BEKASI BARAT LRT TRANSIT STATION. Tugas Akhir thesis, University Technology Yogyakarta.

Lukito, Wahyu Adha and Saputro, Cahyo Dita (2022) ANALISIS MODEL HUBUNGAN VOLUME, KECEPATAN DAN KEPADATAN LALU LINTAS (Studi Kasus: Jalan Wates (Simpang Wirobrajan-Simpang Jujur) ANALYSIS OF RELATIONSHIP MODEL VOLUME, SPEED, AND TRAFFIC DENSITY (Case Study: Jalan Wates (Wirobrajan-Simpang Honest). Tugas Akhir thesis, University Technology Yogyakarta.

Hafizh, Muhammad Rafi Taufiqul and Saputro, Cahyo Dita (2022) ANALISIS PERBANDINGAN BIAYA UPAH TENAGA KERJA BERDASARKAN PERATURAN MENTERI PUPR NOMOR 1 TAHUN 2022 DENGAN PENGAMATAN LAPANGAN COMPARISONAL ANALYSIS OF LABOR WAGE COSTS BASED ON THE REGULATION OF THE MINISTER OF PUPR NUMBER 1 OF 2022 WITH FIELD OBSERVATIONS. Tugas Akhir thesis, University Technology Yogyakarta.

Sari, Evi Purnama and Saputro, Cahyo Dita (2022) ANALISIS PERBANDINGAN LINTASAN KRITIS MENGGUNAKAN METODE CPM DAN PDM (Studi Kasus : Proyek Pembangunan Sarana Pengendali Banjir Sungai Bogowonto dan Anak Sungainya) COMPARISONAL ANALYSIS OF CRITICAL CROSS USING CPM AND PDM METHODS (Case Study: Construction of the Bogowonto River and its tributaries Flood Control Facility Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Latif M, Choirul Abdul and Saputro, Cahyo Dita (2022) ANALISIS PERBANDINGAN PERHITUNGAN VOLUME PEKERJAAN BETON BERTULANG DENGAN METODE SOFTWARE AUTODESK REVIT DAN KONVENSIONAL COMPARISONAL ANALYSIS OF REINFORCED CONCRETE WORKING VOLUME CALCULATIONS WITH AUTODESK REVIT AND CONVENTIONAL SOFTWARE METHODS. Tugas Akhir thesis, University Technology Yogyakarta.

Milani, Wanda Dwi and Saputro, Cahyo Dita (2022) ANALISIS PERBANDINGAN UPAH TENAGA KERJA AKTUAL PEKERJAAN DINDING DENGAN PERMEN PUPR NOMOR 1 TAHUN 2022 (Studi Kasus Proyek Gedung Samanea Wholesale Market Cikupa) COMPARISON ANALYSIS OF ACTUAL LABOR WAGES FOR WALL WORK WITH PERMEN PUPR NUMBER 1 OF 2022 (Case Study of Cikupa Wholesale Market Samanea Building Project). Tugas Akhir thesis, University Technology Yogyakarta.

Sukma, Mellania Naga and Saputro, Cahyo Dita (2022) ANALISIS PRODUKTIVITAS PEKERJAAN GALIAN TANAH DENGAN PONTON PADA PEKERJAAN KOLAM TAMBAT DAN KOLAM RETENSI (Studi Kasus : Proyek Pengendalian Banjir dan Rob Sungai Loji – Banger Paket 1) PRODUCTIVITY ANALYSIS OF SOIL EXCUREMENT WORKS WITH PONTONS ON MOORING POOL AND RETENTION POOL WORKS (Case Study: Loji River Flood and Rob Control Project – Banger Package 1). Tugas Akhir thesis, University Technology Yogyakarta.

Nirmalasari, Stefany and Saputro, Cahyo Dita (2022) ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PROYEK KONSTRUKSI BERDASARKAN LABOUR UTILIZATION RATE (LUR) (Studi Kasus : Revitalisasi Gedung Dormitory Student Center STTN BATAN) LABOR PRODUCTIVITY ANALYSIS ON A CONSTRUCTION PROJECT BASED ON LABOR UTILIZATION RATE (LUR) (Case Study: Revitalization of the Dormitory Student Center Building STTN BATAN). Tugas Akhir thesis, University Technology Yogyakarta.

Ardianto, Ardianto and Saputro, Cahyo Dita (2022) ANALISIS PROPORSI SUMBER DAYA TENAGA KERJA TERHADAP BIAYA KONSTRUKSI PEMBANGUNAN PERUMAHAN STUDI KASUS : (PERUMAHAN VILLA ARGOMULYO DI SEDAYU KABUPATEN BANTUL) ANALYSIS OF THE PROPORTION OF LABOR RESOURCES TO CONSTRUCTION COSTS OF HOUSING DEVELOPMENT CASE STUDY : (VILLA ARGOMULYO HOUSING IN SEDAYU, BANTUL REGENCY). Tugas Akhir thesis, University Technology Yogyakarta.

Dewanto, Novendra Ari and Saputro, Cahyo Dita (2022) ANALISIS RISIKO SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI PADA PEKERJAAN STRUKTUR ATAS MENGGUNAKAN ANALYTIC HIERACHY PROCESS (AHP) (Studi Kasus: Masjid Walidah Dahlan UNISA ) Novendra Ari D[1] Cahyo Dita saputro, S.T., M.T[2] RISK ANALYSIS OF CONSTRUCTION SAFETY MANAGEMENT SYSTEMS ON TOP STRUCTURE WORKS USING ANALYTIC HIERACHY PROCESS (AHP) (Case Study: Walidah Dahlan Mosque UNISA ). Tugas Akhir thesis, University Technology Yogyakarta.

Winurintyas, Vidya Adenisa and Saputro, Cahyo Dita (2022) IDENTIFIKASI DAN ANALISIS RISIKO KECELAKAAN KERJA DENGAN METODE FAILURE MODE AND EFFECT ANALYSIS (FMEA) IDENTIFICATION AND ANALYSIS OF OCCUPATIONAL ACCIDENT RISK USING FAILURE MODE AND EFFECT ANALYSIS (FMEA) METHOD). Tugas Akhir thesis, University Technology Yogyakarta.

Refna, Gema Dwi and Saputro, Cahyo Dita (2022) PERENCANAAN PENJADWALAN PROYEK BANGUNAN BERTINGKAT MENGGUNAKAN MICROSOFT PROJECT Studi Kasus : Proyek Pembangunan Pabrik dan Kantin PT. Farmosa Bag Indonesia SCHEDULE PLANNING OF STATE BUILDING PROJECTS USING MICROSOFT PROJECT Case Study : Factory and Canteen Construction Project of PT. Farmosa Bag Indonesia. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Ramadhan Jana and Saputro, Cahyo Dita (2022) STUDI PERBANDINGAN MANAJEMEN PENGENDALIAN MATERIAL DENGAN MENGGUNAKAN METODE ECONOMIC ORDER QUANTITY (EOQ) DAN METODE PROGRAM DINAMIS COMPARATIVE STUDY OF MATERIAL CONTROL MANAGEMENT USING THE ECONOMIC ORDER QUANTITY (EOQ) METHOD AND THE DYNAMIC PROGRAM METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Nur Razak, Muhammad Fathurrahman and Saputro, Cahyo Dita (2022) ANALISIS PENERAPAN LEAN CONSTRUCTION PADA PROYEK PEMBANGUNAN GEDUNG (Studi Kasus: Proyek Pembangunan Gedung Badan Penyelenggaraan Jaminan Sosial (BPJS) Kesehatan Sleman) ANALYSIS OF LEAN CONSTRUCTION IMPLEMENTATION IN BUILDING DEVELOPMENT PROJECTS (Case Study: Sleman Health Social Security Administering Agency (BPJS) Building Project). Tugas Akhir thesis, University Technology Yogyakarta.

Hidaya, Nur Afif and Saputro, Cahyo Dita (2022) ANALISIS SITE LAYOUT MENGGUNAKAN MULTI OBJECTIVES FUNCTION PADA PERUMAHAN (Studi Kasus : Perumahan Bale Pandawa Kabupaten Purworejo) ANALYSIS OF SITE LAYOUT USING MULTI OBJECTIVES FUNCTION IN HOUSING (Case Study: Bale Pandawa Housing, Purworejo Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Maulana, Indra and Saputro, Cahyo Dita (2021) ANALISIS SISA MATERIAL KERAMIK BERDASARKAN POLA LANTAI (Studi Kasus: Bangunan Gedung DPRD Sleman) ANALYSIS OF RESIDUAL CERAMIC MATERIALS BASED ON FLOOR PATTERN (Case Study: Sleman DPRD Building). Tugas Akhir thesis, University Technology Yogyakarta.

Chana, Winda Rafi and Saputro, Cahyo Dita (2021) ANALISIS CLASH DETECTION MENGGUNAKAN SOFTWARE REVIT DAN NAVISWORKS MANAGE PADA GEDUNG POLSEK DEPOK BARAT CLASH DETECTION ANALYSIS USING REVIT AND NAVISWORKS MANAGE SOFTWARE AT POLSEK BUILDING DEPOK BARAT. Tugas Akhir thesis, University Technology Yogyakarta.

Supri, - and Saputro, Cahyo Dita (2021) ANALISIS PENGARUH PEMBAGIAN ZONA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING (Studi Kasus: Proyek Pembangunan Gedung Rawat Jalan 4 Lantai Rumah Sakit Brayat Minulya) ANALYSIS OF THE EFFECT OF ZONE DIVISION ON COST AND TIME ON FORMS WORK (Case Study: 4-Story Outpatient Building Project at Brayat Minulya Hospital). Tugas Akhir thesis, University Technology Yogyakarta.

Supri, Supri and Saputro, Cahyo Dita (2021) ANALISIS PENGARUH PEMBAGIAN ZONA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING (Studi Kasus: Proyek Pembangunan Gedung Rawat Jalan 4 Lantai Rumah Sakit Brayat Minulya) ANALYSIS OF THE EFFECT OF ZONE DIVISION ON COST AND TIME ON FORMS WORK (Case Study: 4-Story Outpatient Building Project at Brayat Minulya Hospital). Tugas Akhir thesis, University Technology Yogyakarta.

Akbar, Rendy and Saputro, Cahyo Dita (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN KERAMIK DENGAN METODE WORK STUDY (Studi Kasus Gedung DPRD SLeman) ANALYSIS OF LABOR PRODUCTIVITY OF CERAMIC INSTALLATION USING WORK STUDY METHOD (Case Study of SLeman DPRD Building). Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Okta Dwicahya and Saputro, Cahyo Dita (2021) OPTIMASI SITE LAYOUT MENGGUNAKAN MULTI OBJECTIVES FUNCTION Studi Kasus : Proyek Pembangunan Laboratorium Riset Alam Sutera Indonesia, Bogor, Jawa Barat OPTIMIZATION OF SITE LAYOUT USING MULTI OBJECTIVE FUNCTION Case Study: Natural Silk Research Laboratory Development Project Indonesia, Bogor, West Java. Tugas Akhir thesis, University Technology Yogyakarta.

Faustina, Arneta and Saputro, Cahyo Dita (2021) PENJADWALAN ULANG MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (Studi Kasus : Proyek Pembangunan Jalur Kereta Api Bandara Yogyakarta International Airport) SCHEDULING USING PRECEDENCE DIAGRAM METHOD (PDM) (Case Study: Yogyakarta International Airport Railroad Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Devita, Astri Ayu and Saputro, Cahyo Dita (2021) STUDI KOMPARASI PRODUKTIVITAS DAN WAKTU PENGECORAN MENGGUNAKAN CONCRETE BUCKET DAN CONCRETE PUMP PADA PEMBANGUNAN GEDUNG KANTOR (Studi Kasus: Proyek Pembangunan Kantor ACC Digital Operation Center Yogyakarta) COMPARATIVE STUDY OF PRODUCTIVITY AND TIME OF CASTING USING CONCRETE BUCKET AND CONCRETE PUMP IN OFFICE BUILDING CONSTRUCTION (Case Study: ACC Digital Operation Center Yogyakarta Office Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Nasution, Muhammad Adlisyah Rahman and Saputro, Cahyo Dita (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN PANEL LANTAI AUTOCLAVED AERATED CONCRETE DENGAN PLAT BETON KONVENSIONAL Studi Kasus: Proyek Pembangunan Puskesmas Gondangrejo COMPARISON ANALYSIS OF COST AND TIME FOR AUTOCLAVED AERATED CONCRETE FLOOR PANEL WORK WITH CONVENTIONAL CONCRETE Slabs Case Study: Gondangrejo Community Health Center Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Fitri, Banowati Azalia and Saputro, Cahyo Dita (2021) ANALISIS PERCEPATAN PELAKSANAAN PROYEK BERDASARKAN PENAMBAHAN TENAGA KERJA (Studi Kasus : Proyek Pembangunan Rumah Susun Ponpes Baitul Izza, Kabupaten Wonogiri, Jawa Tengah) ANALYSIS OF ACCELERATION OF PROJECT IMPLEMENTATION BASED ON ADDITIONAL LABOR (Case Study: Baitul Izza Islamic Boarding School Flat Construction Project, Wonogiri Regency, Central Java). Tugas Akhir thesis, University Technology Yogyakarta.

Munawaroh, Elis Siti and Saputro, Cahyo Dita (2021) ANALISIS PERENCANAAN WAKTU DAN SUMBER DAYA TENAGA KERJA PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Rumah Susun A Politeknik PU Semarang) ANALYSIS OF TIME PLANNING AND MANPOWER RESOURCES ON CONSTRUCTION PROJECTS (Case Study: Construction Project of Flat A of Semarang PU Polytechnic). Tugas Akhir thesis, University Technology Yogyakarta.

Praditya, Radete Wisnu and Saputro, Cahyo Dita (2021) ANALISIS VALUE ENGINEERING PADA STRUKTUR PONDASI PROYEK HOTEL PATRA MALIOBORO YOGYAKARTA ENGINEERING VALUE ANALYSIS ON THE FOUNDATION STRUCTURE OF THE PATRA MALIOBORO HOTEL PROJECT YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Zamaini, Jois and Saputro, Cahyo Dita (2021) PERENCANAAN PENJADWALAN PROYEK MENGGUNAKAN METODE PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) PADA PROYEK JEMBATAN PROJECT SCHEDULING PLANNING USING THE PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) METHOD ON THE BRIDGE PROJECT. Tugas Akhir thesis, University Technology Yogyakarta.

Fridayanti, Novella and Saputro, Cahyo Dita (2020) ANALISIS DIRECT WASTE STRUKTUR KOLOM PADA PROYEK PEMBANGUNAN GEDUNG Studi Kasus Proyek Pembangunan Masjid Fadil Umar Yogyakarta DIRECT WASTE ANALYSIS OF COLUMN STRUCTURE IN A BUILDING DEVELOPMENT PROJECT A Case Study of Yogyakarta Fadil Umar Mosque Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

Ardito, Aditya Arif and Saputro, Cahyo Dita (2020) ANALISIS PENGARUH PENAMBAHAN POZZOLAN TONGKOL JAGUNG TERHADAP KUAT GESER MORTAR PASANGAN BATU BATA ANALYSIS OF THE EFFECT OF ADDING CORN COB POZZOLAN ON MORTAR SHIFT STRENGTH OF BRICK PAIRS. Tugas Akhir thesis, University Technology Yogyakarta.

Rosniati, Nia Amelia and Saputro, Cahyo Dita (2020) ANALISIS PERBANDINGAN INDEKS PADA PEKERJAAN KOLOM BERDASARKAN PERATURAN MENTERI PUPR28-2016 DAN LAPANGAN Studi Kasus Proyek Pengembangan Komplek Masjid Fadhli Umar Kotabaru Yogyakarta INDEX COMPARATIVE ANALYSIS ON COLUMN WORK BASED ON REGULATION OF THE MINISTER OF PUPR 28-2016 AND THE FIELD A Case Study of the Fadhli Umar Mosque Complex Development Project, Kotabaru Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Wahyudi, Iqbal and Saputro, Cahyo Dita (2020) ANALISIS PERBANDINGAN PRODUKTIVITAS TENAGA KERJA PEKERJAAN PASANGAN DINDING MENGGUNAKAN BATA MERAH DAN BATA RINGAN STUDI KASUS PROYEK REHABILITAS BANGUNAN PASAR PRAWIROTAMAN COMPARATIVE ANALYSIS OF LABOR PRODUCTIVITY OF WALL PAIRS USING RED BRICK AND LIGHTWEIGHT BRICKS, A CASE STUDY OF THE PRAWIROTAMAN MARKET BUILDING REHABILITY PROJECT. Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Dominikus Oktangada Kurnia and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS DAN BIAYA ALAT BERAT EXCAVATOR STUDI KASUS PERTAMBANGAN PASIR SUNGAI GENDOL EXCAVATOR EQUIPMENT PRODUCTIVITY AND COST ANALYSIS ON GENDOL RIVER SAND MINING CASE STUDY. Tugas Akhir thesis, University Technology Yogyakarta.

Rusdianto, Wisnu and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS TENAGA KERJA PROYEK KONSTRUKSI PADA PEKERJAAN PEMBESIAN (Studi Kasus: Rehabilitasi Pasar Prawirotaman Kota Yogyakarta) LABOR PRODUCTIVITY ANALYSIS OF THE CONSTRUCTION PROJECT IN CONSTRUCTION WORK (Case Study: Rehabilitation of Prawirotaman Market in Yogyakarta City). Tugas Akhir thesis, University Technology Yogyakarta.

Aprizaldi, Muhammad Faris and Saputro, Cahyo Dita (2020) ANALISIS RISIKO KECELAKAAN KERJA DALAM PENGGUNAAN TOWER CRANE DENGAN METODE ANALITYCAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Gedung Teaching Industry Leraning Center (TILC) Sekolah Vokasi UGM RISK ANALYSIS OF WORK ACCIDENTS IN THE USE OF TOWER CRANE USING ANALITYCAL HIERARCHY PROCESS (AHP) METHOD A Case Study of the UGM Vocational School Teaching Industry Center (TILC) Building Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

Agustin, Nia and Saputro, Cahyo Dita (2020) ANALISIS RISIKO KECELAKAAN KONSTRUKSI PROYEK PEMBANGUNAN UNDERPASS DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Underpass Kentungan Yogyakarta RISK ANALYSIS OF CONSTRUCTION ACCIDENTS UNDERPASS DEVELOPMENT PROJECT WITH ANALYTICAL HIERARCHY PROCESS (AHP) METHOD A Case Study of the Yogyakarta Kentungan Underpass Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Muntiyawati, Muntiyawati and Saputro, Cahyo Dita (2020) ANALSISI PERBANDINGAN INDEKS PADA BALOK DAN PLAT LANTAI BERDASARKAN PERMEN PUPR28-2016 DAN LAPANGAN Studi Kasus pada Proyek Pengembangan Komplek Masjid Fadhli Umar Kotabaru Yogyakarta ANALYSIS OF INDEX COMPARISON ON BEAMS AND FLOOR PLAT BASED ON PUPR REGULATION 28-2016 AND FIELD A Case Study on the Development Project for the Fadhli Umar Mosque Complex, Kotabaru Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

GERFIAN PUTRA, DHANYKO NOVAS BINTANG and Saputro, Cahyo Dita (2020) Optimasi Site Layout Menggunakan Multi Objectives Function Studi Kasus Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM Site Layout Optimization Using Multi Objectives Functions A Case Study of the UGM Vocational School Teaching Industry Learning Center (TILC) Building Project. Tugas Akhir thesis, University Technology Yogyakarta.

Wathoni, Khaerul and Saputro, Cahyo Dita (2020) ANALISIS PELAKSANAAN PENGECORAN KOLOM DENGAN METODE BERTAHAP DAN KESELURUHAN TERHADAP BIAYA DAN WAKTU PROYEK (Studi Kasus : Proyek Pembangunan Gedung Rektorat UST Yogyakarta) ANALYSIS OF THE IMPLEMENTATION OF COLUMN CASTING WITH THE STAGE AND ENTIRE METHODS OF THE COST AND TIME OF THE PROJECT (Case Study: UST Yogyakarta Rectorate Building Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Kustiadi, Wahyu and Saputro, Cahyo Dita (2020) ANALISIS PENENTUAN BOX GIRDER TERHADAP APLIKASI PC-I GIRDER PADA STRUKTUR ATAS JEMBATAN SEJIWAN DI PURWOREJO ANALYSIS OF BOX GIRDER DETERMINATION ON PC-I GIRDER APPLICATIONS IN THE UPPER STRUCTURE OF THE SEJIWAN BRIDGE IN PURWOREJO. Tugas Akhir thesis, University Technology Yogyakarta.

Ginanjar, Mantep and Saputro, Cahyo Dita (2020) ANALISIS PERBANDINGAN BIAYA BEKISTING KOLOM DAN BALOK MENGGUNAKAN MULTIPLEK BIASA DENGAN MULTIPLEK TEGOFILM (Studi Kasus: Proyek Pembangunan Gedung Layanan Alumni Universitas Negeri Yogyakarta) COMPARATIVE ANALYSIS OF COST OF COLUMN AND BEAM FORMWORK USING ORDINARY AND TEGOFILM MULTIPLEX (Case Study: Yogyakarta State University Alumni Service Building Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Pramuditya, Yudha and Saputro, Cahyo Dita (2020) ANALISIS PERBANDINGAN PENAMBAHAN TENAGA KERJA DAN PENAMBAHAN JAM KERJA (LEMBUR) TERHADAP BIAYA DAN WAKTU MENGGUNAKAN METODE CRASH PROGRAM (Studi Kasus Proyek Pembangunan Gedung Kuliah C Siti Moendjiah Universitas ‘Aisyiyah Yogyakarta) COMPARATIVE ANALYSIS OF LABOR AND WORKING HOURS ADDITIONS ON COST AND TIME USING THE CRASH PROGRAM METHOD (Case Study of C Siti Moendjiah Lecture Building Construction University ‘Aisyiyah Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Utama, Joshika Pradirga and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS DAN BIAYA ALAT BERAT EXCAVATOR PADA PROYEK PERUMAHAN ANALYSIS OF PRODUCTIVITY AND EXCAVATOR HEAVY EQUIPMENT COSTS IN HOUSING PROJECTS. Tugas Akhir thesis, University Technology Yogyakarta.

Taufiq, Akbar Rozzaqi and Saputro, Cahyo Dita (2020) ANALISIS PRODUKTIVITAS KELOMPOK TENAGA KERJA PADA PEKERJAAN BEKESTING BALOK, PLAT LANTAI, DAN KOLOM (StudiKasus: Pembangunan ApartemenYudhistiraYogyakarta) ANALYSIS OF PRODUCTIVITY OF LABOR IN WORKING BEAMS, FLOOR PLATES, AND COLUMNS (Case Study: Yogyakarta Yudhistira Apartment Development). Tugas Akhir thesis, University Technology Yogyakarta.

Alkuratuaini, Anis and Saputro, Cahyo Dita (2020) EVALUASI BIAYA DAN KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN JALAN TOL NGAWI-KERTOSONO EVALUATION OF THE COST AND PERFORMANCE OF THE TIME OF THE NGAWI-KERTOSONO TOLL ROAD DEVELOPMENT PROJECT. Tugas Akhir thesis, University Technology Yogyakarta.

Perdana, Kurnia Putra and Saputro, Cahyo Dita (2020) PENERAPAN METODE KONSEP NILAI HASIL (EARNED VALUE CONCEPT) DALAM PENGENDALIAN PROYEK (Studi Kasus Proyek Pembangunan Gedung Kantor OJK Daerah Istimewa Yogyakarta) APPLICATION OF EARNED VALUE CONCEPT METHOD IN PROJECT CONTROL (Case Study of the OJK Office Building Construction Project in Yogyakarta Special Region). Tugas Akhir thesis, University Technology Yogyakarta.

Imtihan, Rizal Fathul and Saputro, Cahyo Dita (2019) ANALISIS PERBANDINGAN BIAYA DAN WAKTU BERDASARKAN TAHAPAN PELAKSANAAN PEMBESIAN KOLOM (Studi Kasus Proyek Pembangunan Gedung Rektorat Universitas Sarjanawiyata Tamansiswa (UST) Yogyakarta) ANALYSIS OF COMPARISON OF TIME AND COST COMPARISON BASED ON THE IMPLEMENTATION STAGE OF COLUMN EXPANSION (Case Study of the Construction Project of the Sarjanawiyata Tamansiswa University (UST) Rectorate Building in Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Mohamad Eka Bimantara and Saputro, Cahyo Dita (2019) ANALISIS PERBANDINGAN BIAYA PADA PEKERJAAN STRUKTUR PELAT LANTAI KONVENSIONAL DAN PELAT LANTAI FLOORDECK Studi Kasus: Gedung IRNA RSUD Wates, Kulon Progo COMPARISON ANALYSIS OF COSTS ON STRUCTURAL WORK ON CONVENTIONAL FLOOR PLATE AND FLOORDECK FLOOR PLATE Case Study: IRNA Building at Wates Hospital, Kulon Progo. Tugas Akhir thesis, University Technology Yogyakarta.

Febrianti, Erika and Saputro, Cahyo Dita (2019) ANALISIS PERBANDINGAN EFEKTIFITAS PENGGUNAAN FASILITAS PENYEBERANGAN PELICAN CROSSING DENGAN JEMBATAN PENYEBERANGAN ORANG Studi Kasus: Jurang Mundu Ruas Jalan Cepresan Kemusu Boyolali COMPARISON ANALYSIS OF THE EFFECTIVENESS OF THE USE OF PELICAN CROSSING FACILITIES WITH THE PEOPLE BRIDGE Case Study: Jurang Mundu Kemusu Boyolali Cepresan Road Section. Tugas Akhir thesis, University Technology Yogyakarta.

Wicaksono, Arum Gusti and Saputro, Cahyo Dita (2019) ANALISIS PRODUKTIVITAS DAN BIAYA OPERASIONAL TOWER CRANE PADA PROYEK GEDUNG Studi Kasus Proyek Pembangunan Laboratorium Terpadu Universitas Ahmad Dahlan ANALYSIS OF PRODUCTIVITY AND COST OF TOWER CRANE OPERATIONAL IN BUILDING PROJECTS Case Study of Ahmad Dahlan University Integrated Laboratory Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Other

Bhaskara, Adwitya and Saputro, Cahyo Dita and Ismaili, Abul Fida and Agustin, Nia and Alim, Syawaluddin (2022) similarity check THE PREVENTIVE PRIORITY PLAN BASED ON THE CAUSALITY ANALYSIS OF THE CONSTRUCTION ACCIDENT A CASE STUDY: CONSTRUCTION PROJECT OF KENTUNGAN UNDERPASS. Politeknik Negeri Jakarta, Construction and Material Journal.

Saputro, Cahyo Dita Cek Similarity Jurnal: Analisis Manajemen Risiko Proyek Bangunan Gedung Bertingkat Dengan Metode Severity Index. Universitas Teknologi Yogyakarta.

Arndarnijariah, Faqi Fesyaputri and Saputro, Cahyo Dita Cek Similarity Jurnal: Analisis Penilaian Kinerja Green Building Pada Proyek Rehabilitasi Bangunan Pasar Prawirotaman Kota Yogyakarta. Universitas Teknologi Yogyakarta.

Aprizaldi, Muhammad Faris and Saputro, Cahyo Dita Cek Similarity Jurnal: Analisis Risiko Kecelakaan Kerja dalam Penggunaan Tower Crane dengan Metode Analitycal Hierarchy Process (AHP) (Studi Kasus Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM. Universitas Teknologi Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Agustin, Nia HKI: Analisis Kausalitas Kecelakaan Konstruksi Dengan Pendekatan Fault Tree Analysis (FTA). Universitas Teknologi Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Agustin, Nia Peer Review HKI: Rencana Prioritas Preventif Berdasarkan Analisis Kausalitas Kecelakaan Konstruksi. Universitas Teknologi Yogyakarta.

Aprizaldi, Muhammad Faris and Saputro, Cahyo Dita Peer Review Jurnal Analisis Risiko Kecelakaan Kerja dalam Penggunaan Tower Crane dengan Metode Analitycal Hierarchy Process (AHP) (Studi Kasus Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM. Universitas Teknologi Yogyakarta.

Saputro, Cahyo Dita Peer Review: Analisis Manajemen Risiko Proyek Bangunan Gedung Bertingkat Dengan Metode Severity Index. Universitas Teknologi Yogyakarta.

Arndarnijariah, Faqi Fesyaputri and Saputro, Cahyo Dita Peer Review: Analisis Penilaian Kinerja Green Building Pada Proyek Rehabilitasi Bangunan Pasar Prawirotaman Kota Yogyakarta. Universitas Teknologi Yogyakarta.

Bhaskara, Adwitya and Saputro, Cahyo Dita and Benadikta, Firdamarsha and Alim, Syawaluddin and Setiawan, Danny Similarity Analisis Kausalitas Kecelakan Konstruksi dengan Pendekatan Analogi Fault Tree Analysis (FTA). Teknik Sipil UTY. (Unpublished)

This list was generated on Fri Apr 26 23:06:19 2024 WIB.