Items where Division is "Fakultas Sains dan Teknologi > S1 Teknik Sipil" and Year is 2021

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 347.

ARDIYANTO, AGUNG and Setiawan, Danny (2021) ANALISIS TRANSPORTASI DISTRIBUSI SEMEN GRESIK KABUPATEN KEBUMEN Studi Kasus: PT Jawa Berkat Utama TRANSPORTATION ANALYSIS OF GRESIK CEMENT DISTRIBUTION KEBUMEN DISTRICT Case study: PT Jawa Berkat Utama. Tugas Akhir thesis, University Technology Yogyakarta.

Abdul Ghoni, Fepad and Budianto Kromodiryo, Johan (2021) REDESAIN STRUKTUR DARI SRPMK MENJADI DUAL SYSTEM YAITU KOMBINASI SRPMK DENGAN SHEAR WALL PADA BANGUNAN RUMAH SAKIT PKU STIKES MUHAMMADIYAH KLATEN REDESIGNING THE STRUCTURE OF SRPMK TO A DUAL SYSTEM COMBINATING SRPMK WITH SHEAR WALL IN PKU STIKES HOSPITAL BUILDING MUHAMMADIYAH KLATEN. Tugas Akhir thesis, University of Technology Yogyakarta.

Aden Tarunatama Buana, Muhammad and Melyadi Putri, Nanda (2021) ANALISIS KEKERINGAN DENGAN METODE STATISTIK (METODE RUN DAN METODE PNI) Studi Kasus Daerah Aliran Sungai Kali Code DROUGHT ANALYSIS WITH STATISTICAL METHOD (RUN METHOD AND PNI METHOD) Code Watershed Case Study. Tugas Akhir thesis, University of Technology Yogyakarta.

Adextra Simanihuruk, Immanuel and A. Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH PECAHAN HEBEL DAN ABU CANGKANG SAWIT TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 0%, 22%, 25% DAN 28% THE INFLUENCE OF THE MIXING OF HEBEL FRAGED WASTE AND PALM OIL ASH ON THE PROPERLY DESIGNED LIGHTWEIGHT OF 20 MPA CONCRETE COMPRESSIVE STRENGTH WITH A PERCENTAGE OF 0%, 22%, 25% AND 28%. Tugas Akhir thesis, University Technology Yogyakarta.

Adhi Nuryanto, Danang and Setiawan, Danny (2021) PENGARUH PENGGUNAAN STYROFOAM SEBAGAI BAHAN TAMBAH ASPAL PENETRASI 60/70 DENGAN KADAR 1%, 2% DAN 3% PADA CAMPURAN ASPHALT CONCRETE-WEARING COURSE (AC-WC) THE EFFECT OF THE USE OF 1%, 2% AND 3% STYROFOAM AS A 60/70 PENETRATION ASPHALT ON ASPHALT CONCRETE-WEARING COURSE (AC-WC) MIXED. Tugas Akhir thesis, University Technology Yogyakarta.

Adi, Samun Rinasa and Masagala, Algazt Aryad (2021) PERENCANAAN ULANG STRUKTUR ATAS JEMBATAN KEBON AGUNG 2 MENGGUNAKAN SISTEM CABLE STAYED TOP STRUCTURE REDESIGN BRIDGE KEBON AGUNG 2 USING A CABLE STAYED SYSTEM. Tugas Akhir thesis, University Technology Yogyakarta.

Aditya, Desta Candra and Masagala, Algazt Aryad (2021) TINGKAT PENGARUH PENAMBAHAN SERAT NIPAH TERHADAP KUAT LENTUR BETON SERAT DENGAN PERSENTASE 0%; 0,06%; 0,09%; DAN 0,12% LEVEL OF INFLUENCE OF ADDITIONAL FIBER NIPAH WITH A PROCENTAGE OF 0%; 0.06%; 0.09%; AND 0.12% AGAINST FLEXURAL STRENGTH OF FIBER CONCRETE. Tugas Akhir thesis, University Technology Yogyakarta.

Adrian, Muhammad and Nuraini, Rika (2021) PEMETAAN MULTI-BENCANA PADA KAWASAN BANDARA YOGYAKARTA INTERNATIONAL AIRPORT MULTI- DISASTER MAPPING IN THE REGION YOGYAKARTA INTERNATIONAL AIRPORT. Tugas Akhir thesis, University Technology Yogyakarta.

Adyatma, Faza and Hendrasari, Ratna Septi (2021) ANALISIS DAERAH TERDAMPAK GENANGAN BANJIR DIDAERAH SUNGAI DOLOK SEMARANG ANALYSIS OF AREA AFFECTED BY FLOOD IN THE REGION DOLOK RIVER SEMARANG. Tugas Akhir thesis, University Technology Yogyakarta.

Agus Saputra, Varid and kurniati, Dwi (2021) REDESAIN GEDUNG EDUCATION FOR SUSTAINABLE DEVELOPMENT UNIVERSITAS GADJAH MADA DENGAN METODE FLAT SLAB & PENAMBAHAN KEPALA KOLOM REDESIGNING THE EDUCATION BUILDING FOR SUSTAINABLE DEVELOPMENT OF GADJAH MADA UNIVERSITY USING FLAT SLAB METHOD & ADDITIONAL COLUMN HEAD. Tugas Akhir thesis, University of Technology Yogyakarta.

Agustyan Prihantoro, Taufiq and Fida Ismaili, Abul (2021) ANALISIS LAIK FUNGSI JALAN PADA RUAS JALAN PURWOREJO-JOGJA KM 13 S/D KM 15 ANALYSIS OF ROAD FUNCTION FEASIBILITY AT THE KM 13 - KM 15 PURWOREJO-JOGJA ROAD. Tugas Akhir thesis, University of Technology Yogyakarta.

Ahmad, Syafiq and Nuraini, Rika (2021) PEMETAAN BENCANA GEMPA BUMI DAN AMBLESAN PADA JALUR KERETA API STASIUN KUTOWINANGUN SAMPAI STASIUN IJO MAPPING OF THE EARTHQUAKE DISASTER AND SUBSIDENCE ON THE KUTOWINANGUN STATION RAILWAY TO IJO STATION. Tugas Akhir thesis, University of Technology Yogyakarta.

Akbar, Fadhil and Asyifa, Adwiyah (2021) STABILISASI TANAH LEMPUNG EKSPANSIF MENGGUNAKAN 8% LIMBAH MARMER DAN 5%, 7%, 9% LIMBAH CANGKANG KERANG Studi Kasus Desa Kwagon, Kecamatan Godean, Kabupaten Sleman, Daerah Istimewa Yogyakarta EXPANSIVE CLAY SOIL STABILIZATION USING 8% MARBLE WASTE AND 5%, 7%, 9% WASTE OF SHELLS Case Study of Kwagon Village, Godean District, Sleman Regency, Yogyakarta Special Region. Tugas Akhir thesis, University of Technology Yogyakarta.

Akbar, Rendy and Saputro, Cahyo Dita (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA PEKERJAAN KERAMIK DENGAN METODE WORK STUDY (Studi Kasus Gedung DPRD SLeman) ANALYSIS OF LABOR PRODUCTIVITY OF CERAMIC INSTALLATION USING WORK STUDY METHOD (Case Study of SLeman DPRD Building). Tugas Akhir thesis, University Technology Yogyakarta.

Akmal, Alifian Maulida and Nuraini, Rika (2021) PENGARUH PENAMBAHAN ABU ARANG TEMPURUNG KELAPA TERHADAP PARAMETER KUAT GESER TANAH LEMPUNG THE EFFECT OF ADDING COCONUT SHELL COCONUT ASH ON THE PARAMETERS OF STRENGTH SHEARING CLAY SOIL. Tugas Akhir thesis, University Technology Yogyakarta.

Akmal, Alifian Maulida and Nuraini, Rika (2021) PENGARUH PENAMBAHAN ABU ARANG TEMPURUNG KELAPA TERHADAP PARAMETER KUAT GESER TANAH LEMPUNG THE EFFECT OF ADDING COCONUT SHELL COCONUT ASH ON THE PARAMETERS OF STRENGTH SHEARING CLAY SOIL. Tugas Akhir thesis, University Technology Yogyakarta.

Akmal Ari, Wildan and A. Masagala, Algazt (2021) SELF HEALING CONCRETE MENGGUNAKAN BAKTERI BACILLUS SP DAN SPOROSARCINA SP SEBAGAI SOLUSI PEMELIHARAAN BETON BERTULANG SELF HEALING CONCRETE USING BACILLUS SP AND SPOROSARCINA SP AS A SOLUTION FOR REINFORCED CONCRETE MAINTENANCE. Tugas Akhir thesis, University of Technology Yogyakarta.

Aldiani, Savira Putri and Setiawan, Danny (2021) ANALISIS DAMPAK LALU LINTAS FLY OVER TAPAL KUDA TANJUNG BARAT DAN LENTENG AGUNG JAKARTA (Studi Kasus Jl. Raya Lenteng Agung dan Jl. Lenteng Agung Raya) TRAFFIC IMPACT ANALYSIS OF FLY OVER TAPAL KUDA TANJUNG BARAT AND LENTENG AGUNG JAKARTA (Case Study on Jl. Raya Lenteng Agung and Jl. Lenteng Agung Raya). Tugas Akhir thesis, University Technology Yogyakarta.

Alfianita, Felin Dhea and Hendrasari, Ratna Septi (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH DI KECAMATAN SEDAYU KABUPATEN BANTUL (Studi Kasus PDAM Bantul Unit IKK Sedayu) ANALYSIS OF NEEDS AND AVAILABILITY CLEAN WATER IN SEDAYU DISTRICT BANTUL DISTRICT (Case Study of PDAM Bantul Unit IKK Sedayu). Tugas Akhir thesis, University Technology Yogyakarta.

Alfiona, Vera and Budianto Kromodiryo, Johan (2021) PENGARUH PENAMBAHAN CANGKANG KEONG (FLY ASH) DENGAN PERSENTASE 1%, 2% DAN 3% DAN SIKACIM CONCRETE ADDITIVE SEBESAR 0,7% TERHADAP KUAT TEKAN BETON THE EFFECT OF ADDITIONING CONCH SHELL (FLY ASH) WITH PERCENTAGE 1%, 2% AND 3% AND A MASSIVE CONCRETE ADDITIVE SYSTEM 0.7% AGAINST THE STRENGTH OF CONCRETE PRESS. Tugas Akhir thesis, University of Technology Yogyakarta.

Alpiansyah, Alpiansyah and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN KESELAMATAN KONSTRUKSI DENGAN MENGGUNAKAN METODE IBPRPR DAN BOWTIE (Studi Kasus: Proyek Pembangunan Underpass Bulak Kapal (MYC)) CONSTRUCTION SAFETY MANAGEMENT ANALYSIS USING IBPRPR AND BOWTIE METHODS (Case Study: Bulak Kapal (MYC) Underpass Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Aminudin, Mirza and Nuraini, Rika (2021) ANALISIS SPASIAL POTENSI KERAWANAN PADA JALUR KERETA API TERHADAP BENCANA AMBLESAN DAN TSUNAMI SPATIAL ANALYSIS OF VISIBILITY POTENTIAL IN RAILWAYS TOWARDS SUBSIDENCE AND TSUNAMI DISASTERS. Tugas Akhir thesis, University Technology Yogyakarta.

Andrian, Heru and Setiawan, Danny (2021) PENAMBAHAN STYROFOAM DENGAN KADAR 5%, 7%, DAN 9% SEBAGAI BAHAN TAMBAH PADA CAMPURAN HOT ROLLED SHEET-WEARING COURSE (HRS-WC) TERHADAP KARAKTERISTIK MARSHALL ADDITION OF 5%, 7%, AND 9% STYROFOAM TO HOT ROLLED SHEET-WEARING COURSE (HRS-WC) MIXING TO MARSHALL'S CHARACTERISTICS. Tugas Akhir thesis, University of Technology Yogyakarta.

Angga Kurniawan, Satria and Budianto, Johan (2021) ¬¬PENGARUH PEMANFAATAN LIMBAH DAUN JATI SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PRESENTASE 4,5%, 9% DAN 13,5% PENGUJIAN KUAT TEKAN INFLUENCE OF UTILIZATION OF TEAK LEAVES WASTE AS ADDITIONAL MATERIALS IN PAVING BLOCK WITH PRESENTAGE OF 4.5%, 9% AND 13.5% COMPRESSIVE STRENGTH TEST. Tugas Akhir thesis, University of Technology Yogyakarta.

Anggono, Rudi and Budianto, Johan (2021) PENGARUH PEMANFAATAN LIMBAH DAUN JATI SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PERSENTASE 1,5%, 6% DAN 10,5% PENGUJIAN KUAT TEKAN THE EFFECT OF THE UTILIZATION OF TEAK LEAVES AS AN ADDITIONAL MATERIAL IN PAVING BLOCK WITH A PERCENTAGE OF 1.5%, 6% AND 10.5% COMPRESSIVE STRENGTH TEST. Tugas Akhir thesis, University of Technology Yogyakarta.

Anggoro, Riyan Apriyanto and Budianto, Johan (2021) REDESAIN BANGUNAN GEDUNG TEACHING INDUSTRY LEARNING CENTER (TILC) MENGGUNAKAN RANGKA BAJA KONVENSIONAL (Studi Kasus : Proyek Gedung Sekolah Vokasi Teaching Industry Learning Center (TILC) UGM, Yogyakarta) REDESIGN OF TEACHING INDUSTRY LEARNING CENTER (TILC) BUILDING USING CONVENTIONAL STEEL FRAME (Case Study: Teaching Industry Learning Center (TILC) Vocational School Building Project UGM, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Annisa, Andi Syakiah and Nuraini, Rika (2021) PENGARUH PENAMBAHAN ABU BATU BARA TERHADAP PARAMETER KUAT GESER TANAH LEMPUNG EFFECT OF ADDITIONAL COAL ASH ON PARAMETERS OF SHEARING STRENGTH OF CLAY SOIL. Tugas Akhir thesis, University Technology Yogyakarta.

Anshar, Vira Claudya Artini and Ismaili, Abul Fida (2021) ANALISIS RISIKO KECELAKAAN DAN KESELAMATAN PADA PERLINTASAN SEBIDANG KERETA API WILAYAH DAOP VI YOGYAKARTA ACCIDENT AND SAFETY RISK ANALYSIS ON RAILROAD LEVEL CROSSING DAOP VI AREA, YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Antoni, Antoni and Masagala, Algazt Aryad (2021) PEMANFAATAN SAMPAH PLASTIK SEBAGAI PENGGANTI SEMEN PADA PEMBUATAN PAVING BLOCK DENGAN PERSENTASE 80%, 75%, 70 % UTILIZATION OF PLASTIC WASTE AS A SUBSTITUTE OF CEMENT IN PAVING BLOCK MANUFACTURING WITH A PERCENTAGE OF 80%, 75%, 70%. Tugas Akhir thesis, University Technology Yogyakarta.

Anynditia, Febi and Dita Saputro, Cahyo (2021) ANALISA PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN SHEAR WALL DENGAN METODE TIME STUDY Studi Kasus: Proyek Pembangunan Gedung Teaching Industry Learning Center (TILC) Universitas Gadjah Mada LABOR PRODUCTIVITY ANALYSIS ON SHEAR WALL WORK USING TIME STUDY METHOD Case Study: Gadjah Mada University Teaching Industry Learning Center (TILC) Building Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

Apliani Diala Rade, Kartini and Rika Nuraini, Rika Nuraini (2021) ANALISIS PEMBUATAN PETA ZONA RAWAN BENCANA BANJIR DAN BENCANA GEMPA BUMI MENGGUNAKAN PEMETAAN GEOGRAPHIC INFORMATION SYSTEM MAPPING ANALYSIS OF FLOOD AND EARTHQUAKE PRONE ZONES USING GEOGRAPHIC INFORMATION SYSTEM. Tugas Akhir thesis, University of Technology Yogyakarta.

Apriliyani, Nur Rahma and Budianto, Johan (2021) PERENCANAAN ULANG GEDUNG PERPUSTAKAAN DAN LABORATORIUM TERPADU MA N 2 YOGYAKARTA MENGGUNAKAN SNI 2847 : 2019 REDESIGN OF INTEGRATED LIBRARY AND LABORATORY BUILDING OF MA N 2 YOGYAKARTA USING SNI 2847 : 2019. Tugas Akhir thesis, University Technology Yogyakarta.

Arby Syahri, Ananda and Budianto Kromodiryo, Johan (2021) PENGARUH PEMANFAATAN LIMBAH BAMBU (FLY ASH) DENGAN PERSENTASE 0,5%, 1%, 1,5% DAN PLASTICIZER SEBAGAI BAHAN TAMBAH TERHADAP KUAT TEKAN BETON THE EFFECT OF THE UTILIZATION OF BAMBOO WASTE (FLY ASH) WITH A PERCENTAGE OF 0.5%, 1%, 1.5% AND PLASTICIZER AS AN ADDITIONAL MATERIAL TO THE CONCRETE COMPRESSIVE STRENGTH. Tugas Akhir thesis, University of Technology Yogyakarta.

Ardian Rachman, Reza and Kurniati, Dwi (2021) REKAYASA STRUKTUR GEDUNG OJK YOGYAKARTA MENGGUNAKAN METODE FLATSLAB DENGAN DROP PANELS OJK YOGYAKARTA BUILDING STRUCTURE ENGINEERING USING FLATSLAB METHOD WITH DROP PANELS. Tugas Akhir thesis, University Technology Yogyakarta.

Ardiansyah[, Beryl Punky and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH KARBIT TERHADAP BATA BETON PRESENTASE 7%, 9%, DAN 11% THE EFFECT OF WASTE CARBITE SUBSTITUTION ON CONCRETE BRICK PERCENTAGE 7%, 9%, AND 11%. Tugas Akhir thesis, University Technology Yogyakarta.

Arif Setiawan, Ahmad and Budianto, Johan (2021) PENGARUH PENAMBAHAN CANGKANG KEONG (FLY ASH) DENGAN PERSENTASE 4%, 5%, DAN 6% DAN SIKACIM CONCRETE ADDITIVE SEBESAR 0,7% TERHADAP KUAT TEKAN BETON THE EFFECT OF ADDITIONAL 4%, 5% AND 6% CONCRETE SHELLS (FLY ASH) AND A CONCRETE ADDITIVE SIKACIM OF 0.7% ON THE CONCRETE COMPRESSIVE STRENGTH. Tugas Akhir thesis, University of Technology Yogyakarta.

Aritama, Rizky Afi and Kurniati, Dwi (2021) PENGARUH PEMANFAATAN COCOPEAT SEBAGAI SUBSTITUSI PASIR TERHADAP BATA BETON DENGAN PERSENTASE 1,2%, 1,4%, 1,6% THE EFFECT OF UTILIZING COCOPEAT AS SAND SUBSTITUTION ON CONCRETE BRICK WITH PERCENTAGE 1.2%, 1.4%, 1.6%. Tugas Akhir thesis, University Technology Yogyakarta.

Artiyanti, Tanti and Fida Ismaili, Abul (2021) ANALISIS POTENSI LIKUIFAKSI AKIBAT GEMPA BUMI BERDASARKAN DATA CPT (CONE PENETRATION TEST). LIQUIFACTION POTENTIAL ANALYSIS DUE TO EARTHQUAKES BASED ON CPT (CONE PENETRATION TEST) DATA. Tugas Akhir thesis, University Technology Yogyakarta.

Arwanpitu, Nadya Fatimah Mutia and Ismaili, Abul Fida (2021) PENGARUH KUALITAS PELAYANAN, FASILITAS DAN TARIF TERHADAP KEPUASAN PENUMPANG PENGGUNA JASA KMP FERRY X THE INFLUENCE OF QUALITY OF SERVICES, FACILITIES AND RATES ON THE SATISFACTION OF PASSENGER OF KMP FERRY X. Tugas Akhir thesis, University Technology Yogyakarta.

Asyifa, Adwiyah and Nuraini, Rika and Ismaili, Abul Fida (2021) MODUL PRAKTIKUM MEKANIKA TANAH 2 GENAP 2020/2021. [Teaching Resource] (In Press)

Aulia Syifa, Yuniar and Melyadi Putri, Nanda (2021) ANALISIS STABILITAS BENDUNG PESAYANGAN TERHADAP GESER, GULING DAN PIPING AKIBAT BANJIR DENGAN BEBERAPA DEBIT TAHUN RENCANA ANALYSIS OF THE STABILITY OF PESAYANGAN WEIR TOWARDS SLIDING, ROLLING AND PIPING DUE TO FLOOD WITH SOME DEBIT PLAN YEARS. Tugas Akhir thesis, University of Technology Yogyakarta.

Awaluddin, Awaluddin and Setiawan, Danny (2021) EfEKTIVITAS PROGRAM TOL LAUT TERHADAP PENGIRIMAN LOGISTIK DAN DISPARITAS HARGA DI WILAYAH PROVINSI SULAWESI TENGGARA MENGGUNAKAN METODE AHP EFFECTIVENESS OF SEA TOLL PROGRAM ON LOGISTIC DELIVERY AND PRICE DISPARITY IN THE PROVINCE OF SOUTHEAST SULAWESI USING AHP METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Ayodya Hannodio, Muhammad and Septi Hendrasari, Ratna (2021) PREDIKSI TRANSPOR SEDIMEN PADA BENDUNG KAYANGAN PREDICTION OF SEDIMENT TRANSPORT ON KAYANGAN WEIR. Tugas Akhir thesis, University of Technology Yogyakarta.

Bahri, Adhe Rizki Wiradhana and Susilo, Dibyo (2021) OPTIMALISASI KAPASITAS RUANG PARKIR (STUDI KASUS: PUSAT PERBELANJAAN KOTA SAMARINDA) OPTIMIZATION OF PARKING SPACE CAPACITY (CASE STUDY: SHOPPING CENTER OF SAMARINDA CITY). Tugas Akhir thesis, University Technology Yogyakarta.

Balagaise, Alfred and Bhaskara, Adwitya (2021) ANALISIS PRODUKTIVITAS TENAGA KERJA DI LAPANGAN PADA PEKERJAAN KOLOM, BALOK DAN PLAT LANTAI (Studi Kasus Proyek Pembangunan Gedung Kampus Universitas Jenderal Soedirman) ANALYSIS OF LABOR PRODUCTIVITY IN THE WORK OF BEAM COLUMNS AND FLOOR PLATES. Tugas Akhir thesis, University Technology Yogyakarta.

Bangsawan, Sulthan Ramadhan and Budianto, Johan (2021) IMPLEMENTASI BUILDING INFORMATION MODELLING (BIM) STUDI KASUS : GEDUNG PARKIR KAMPUS 2 UTY IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) CASE STUDY : UTY SECOND CAMPUS PARKING BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Barbel, Saidina Ali and Kurniati, Dwi (2021) PENGARUH PEMANFAATAN COCOPEAT SEBAGAI SUBSTITUSI PASIR TERHADAP PAVING BLOCK DENGAN PERSENTASE 1,8%, 2%, 2,2% THE EFFECT OF COCOPEAT UTILIZATION AS SAND SUBSTITUTION ON PAVING BLOCK WITH PERCENTAGE 1.8%, 2%, 2.2%. Tugas Akhir thesis, University Technology Yogyakarta.

Bayu Pratama, Bagas and Bhaskara, Adwitya (2021) ANALISIS KUAT TEKAN INTERLOCK BRICK DENGAN BAHAN TAMBAH 10% EGGSHELL DAN 19%, 22%, 25% PUMICE TERHADAP BIAYA PRODUKSI ANALYSIS OF COMPRESSIVE STRENGTH OF INTERLOCK BRICK WITH 10% EGGSHELL ADDITIONAL MATERIALS AND 19%, 22%, 25% PUMICE ON PRODUCTION COSTS. Tugas Akhir thesis, University Technology Yogyakarta.

Bella A.A Zein, Chandra and Utomo, Puji (2021) ANALISIS POLA OPERASI EMBUNG UNIVERSITAS ISLAM INDONESIA UNTUK KEBUTUHAN AIR IRIGASI DI DESA UMBULMARTANI KEBUPATEN SLEMAN ANALYSIS OF INDONESIAN ISLAMIC UNIVERSITY RESERVOIR OPERATING PATTERNS FOR IRRIGATION WATER NEEDS IN UMBULMARTANI VILLAGE, SLEMAN DISTRICT. Tugas Akhir thesis, University of Technology Yogyakarta.

Bhaskara, Adwitya and Dita Saputro, Cahyo and Ismaili, Abul Fida and Agustin, Nia and Alim, Syawaluddin (2021) THE PREVENTIVE PRIORITY PLAN BASED ON THE CAUSALITY ANALYSIS OF THE CONSTRUCTION ACCIDENT A CASE STUDY: CONSTRUCTION PROJECT OF KENTUNGAN UNDERPASS. Politeknik Negeri Jakarta, Construction and Material Journal.

Brifandu Ilham, Deatama and Dita Saputro, Cahyo (2021) PENGARUH REDESIGN KONTRUKSI BAJA MENJADI BETON BERTULANG TERHADAP BIAYA PROYEK Studi Kasus Pada Proyek Gedung Astra Honda Bantul Yogyakarta THE EFFECT OF REDESIGNING STEEL CONTRUCTION TO REINFORCED CONCRETE ON PROJECT COST Case Study on the Astra Honda Bantul Yogyakarta Building Project. Tugas Akhir thesis, University of Technology Yogyakarta.

Buana, Satrya Aji Septa and Hendrasari, Ratna Septi (2021) ANALISIS KUALITAS DAN RENCANA PEMANFAATAN MATA AIR DI UMBUL SIDOMULYO QUALITY ANALYSIS AND UTILIZATION PLAN OF THE SPRING IN UMBUL SIDOMULYO. Tugas Akhir thesis, University Technology Yogyakarta.

Budi Prasetyo, Rian and Asyifa, Adwiyah (2021) ANALISIS EVAPOTRANSPIRASI POTENSIAL DENGAN RUMUS EMPIRIS DI DAERAH IRIGASI BANJAR CAHYANA KABUPATEN BANJARNEGARA POTENTIAL EVAPOTRANSPIRATION ANALYSIS WITH EMPIRICAL FORMULATIONS IN BANJAR CAHYANA IRRIGATION AREA, BANJARNEGARA DISTRICT. Tugas Akhir thesis, University of Technology Yogyakarta.

Budiantoro, Tri and Utomo, Puji (2021) ANALISIS KAPASITAS SUNGAI DENGAN PROGRAM HEC-RAS 4.1.0 TERHADAP DEBIT BANJIR KALA ULANG TERTENTU (Studi Kasus: DAS Winongo, Yogyakarta) RIVER CAPACITY ANALYSIS WITH HEC-RAS 4.1.0 PROGRAM ON FLOOD DISPOSAL AT CERTAIN RETURNS (Case Study: Winongo Watershed, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Budiharto, Kemal and Susilo, Dibyo (2021) ANALISIS KINERJA TERMINAL TIRTONADI SOLO DENGAN METODE SERVQUAL TIRTONADI SOLO TERMINAL PERFORMANCE ANALYSIS WITH SERVQUAL METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Busthomy, Ahmad Yazid Al and Masagala, Algazt Aryad (2021) ANALISIS PERBANDINGAN KEHILANGAN GAYA PRATEGANG PCI GIRDER DAN BOX GIRDER PADA JEMBATAN JELOK KABUPATEN GUNUNGKIDUL COMPARISONAL ANALYSIS OF PCI GIRDER AND BOX GIRDER prestressing LOSS ON JELOK BRIDGE, GUNUNGKIDUL REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Cahyani, Regita Tri and Nuraini, Rika (2021) ANALISIS DAYA DUKUNG TANAH PADA FONDASI DANGKAL DENGAN PERBANDINGAN METODE TERZAGHI DAN MEYERHOF ANALYSIS OF SOIL BEARING CAPACITY ON SHALLOW FOUNDATIONS USING COMPARISON OF TERZAGHI AND MEYERHOF METHODS. Tugas Akhir thesis, University Technology Yogyakarta.

Carlos Methlis Mone, David and Budianto, Johan (2021) PENGARUH PEMANFAATAN LIMBAH BAMBU (FLY ASH) DENGAN PERSENTASE 3,5%, 4%, 4,5% DAN PLASTICIZER SEBAGAI BAHAN TAMBAH TERHADAP KUAT TEKAN BETON THE EFFECT OF UTILIZATION OF BAMBOO WASTE (FLY ASH) WITH A PERCENTAGE OF 3.5%, 4%, 4.5% AND PLASTICIZER AS AN ADDITIONAL MATERIAL ON THE CONCRETE COMPRESSIVE STRENGTH. Tugas Akhir thesis, University of Technology Yogyakarta.

Chana, Winda Rafi and Saputro, Cahyo Dita (2021) ANALISIS CLASH DETECTION MENGGUNAKAN SOFTWARE REVIT DAN NAVISWORKS MANAGE PADA GEDUNG POLSEK DEPOK BARAT CLASH DETECTION ANALYSIS USING REVIT AND NAVISWORKS MANAGE SOFTWARE AT POLSEK BUILDING DEPOK BARAT. Tugas Akhir thesis, University Technology Yogyakarta.

Cipta Rizky Aji, Eka and Kurniati, Dwi (2021) REDESAIN GEDUNG PSLH UGM METODE FLAT SLAB DROP PANEL DAN COLUMN HEAD REDESIGN OF PSLH UGM BUILDING USING FLAT SLAB DROP PANEL AND COLUMN HEAD METHODS. Tugas Akhir thesis, University of Technology Yogyakarta.

Damanik, Divan Yoan Alvino and Bhaskara, Adwitya (2021) ANALISIS KONSTRUKSI RAMPING PADA PERENCANAAN DESAIN KOLOM Studi Kasus: Proyek Pembangunan Gedung Rusunawa Universitas Ris Maduma LEAN CONSTRUCTION ANALYSIS IN COLUMN DESIGN PLANNING Case Study: Ris Maduma University Rusunawa Building Project. Tugas Akhir thesis, University Technology Yogyakarta.

Damayanti, Fitri Krismon and Nuraini, Rika (2021) REDESAIN FONDASI GEDUNG STUDENT CENTER UNIVERSITAS ATMA JAYA YOGYAKARTA MENGGUNAKAN FONDASI PLAT RAKIT REDESIGNING STUDENT CENTER BUILDING FOUNDATION OF ATMA JAYA UNIVERSITY YOGYAKARTA USING RAFT PLATE FOUNDATION. Tugas Akhir thesis, University Technology Yogyakarta.

Darmawan, Doni and Nuraini, Rika (2021) ANALISIS BAHAYA GEMPA BUMI DAN AMBLESAN DI AREA JALUR KERETA API WATES - KUTOWINANGUN ANALYSIS OF THE EARTHQUAKE HAZARDS AND SUBSIDENCE IN WATES - KUTOWINANGUN RAILWAY AREA. Tugas Akhir thesis, University of Technology Yogyakarta.

Daud Nur Syafi’i, Abu and Kurniati, Dwi (2021) ANALISIS FLAT SLAB WITH DROP PANEL AND CAPITAL COLUMN GEDUNG ASRAMA PUTRI UNIVERSITAS AISYIYAH YOGYAKARTA (UNISA) DENGAN MENGGUNAKAN SOFTWARE ETABS v.17 FLAT SLAB ANALYSIS WITH DROP PANEL AND CAPITAL COLUMN ON THE FEMALE DORMITORY BUILDING OF AISYIYAH UNIVERSITY YOGYAKARTA (UNISA) USING ETABS v.17 SOFTWARE. Tugas Akhir thesis, University Technology Yogyakarta.

Devita, Astri Ayu and Saputro, Cahyo Dita (2021) STUDI KOMPARASI PRODUKTIVITAS DAN WAKTU PENGECORAN MENGGUNAKAN CONCRETE BUCKET DAN CONCRETE PUMP PADA PEMBANGUNAN GEDUNG KANTOR (Studi Kasus: Proyek Pembangunan Kantor ACC Digital Operation Center Yogyakarta) COMPARATIVE STUDY OF PRODUCTIVITY AND TIME OF CASTING USING CONCRETE BUCKET AND CONCRETE PUMP IN OFFICE BUILDING CONSTRUCTION (Case Study: ACC Digital Operation Center Yogyakarta Office Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Dewantoro, Bagus and Setiawan, Danny (2021) IDENTIFIKASI DAERAH RAWAN KECELAKAAN (BLACK SITE) DAN TITIK RAWAN KECELAKAAN (BLACK SPOT) Studi Kasus Ruas Jalan Magelang-Salatiga IDENTIFICATION OF ACCIDENT AREAS (BLACK SITE) AND ACCIDENT POINTS (BLACK SPOT) Case Study of the Magelang-Salatiga Road Section. Tugas Akhir thesis, university technology Yogyakarta.

Dewi, Mutiara Aprilianty Permata and Ismaili, Abul Fida (2021) PEMODELAN UMUR RENCANA TERHADAP OPTIMALISASI DESAIN PERKERASAN JALAN PADA RINGROAD UTARA YOGYAKARTA DESIGN LIFE MODELING FOR OPTIMIZATION OF ROAD PAVEMENT DESIGN IN THE NORTH RINGROAD OF YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Dewi Sarahwati, Nuke and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No. 21 TAHUN 2019 Studi Kasus Pekerjaan Kolom Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jenderal Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PWPH No.21 of 2019 Case Study on Column Work for the Construction of Learning Services Building Project, Faculty of ISIP, Jenderal Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Djiha, Syahrul Fadli and Utomo, Puji (2021) PENGEMBANGAN PELABUHAN MELALUI OPTIMALISASI PELAYANAN DENGAN PEMODELAN SIMULASI-MAKRO MENGGUNAKAN SOFTWARE ARENA (Studi Kasus:Pelabuhan Luwuk, Sulawesi Tengah) Port Development Through Service Optimization With Macro-Simulation Modeling Using Arena Software (Case Study: Luwuk Port, Central Sulawesi). Tugas Akhir thesis, University Technology Yogyakarta.

Durahman, Yoland Christanto S. and Utomo, Puji (2021) ANALISIS PROFIL MUKA AIR BANJIR PADA SUNGAI GAJAH WONG TERHADAP KALA ULANG TERTENTU DENGAN PROGAM HEC-RAS 5.0.7 (Studi Kasus: Sub DAS Gajah Wong, Jawa Tengah) FLOOD FACE PROFILE ANALYSIS IN RIVER ELEPHANT WONG AGAINST CERTAIN RETURNS WITH HEC-RAS 5.0.7 PROGRAM (Case Study: Gajah Wong Sub-watershed, Central Java). Tugas Akhir thesis, University Technology Yogyakarta.

Dwi Afrilianingtyas, Dania and Melyadi Putr, Nanda i (2021) STUDI PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH KOMUNAL PADA KECAMATAN GONDOKUSUMAN DAERAH ISTIMEWA YOGYAKARTA STUDY ON COMMUNAL WASTE WATER TREATMENT PLANNING IN GONDOKUSUMAN SUB-DISTRICT, YOGYAKARTA SPECIAL REGION. Tugas Akhir thesis, University of Technology Yogyakarta.

Dwi Apriyansyah, Rio and Fida Ismailli, Abul (2021) PEMANFAATAN LIMBAH ARANG CANGKANG KELAPA SAWIT SEBAGAI FILLER DENGAN KADAR 3.5%, 3.75%, 4%, 4.25% DAN 4.5% PADA CAMPURAN STONE MATRIX ASPHALT 0/8 TERHADAP KARAKTERISTIK MARSHALL UTILIZATION OF PALM OIL CHARCOAL WASTE AS FILLER WITH CONCENTS OF 3.5%, 3.75%, 4%, 4.25% AND 4.5% IN STONE MIXTURE OF MATRIX ASPHALT 0/8 ON MARSHALL'S CHARACTERISTICS. Tugas Akhir thesis, University of Technology Yogyakarta.

Dwi Prabowo, Hendra and Melyadi Putri, Nanda (2021) ANALISIS KEDALAMAN DAN POLA GERUSAN LOKAL TERHADAP 2 BENTUK PILAR DENGAN 2 KEDALAMAN BERBEDA (EKSPERIMEN) ANALYSIS OF DEPTH AND LOCAL SCOUR PATTERNS OF 2 PILLAR FORMS WITH 2 DIFFERENT DEPTH (EXPERIMENT). Tugas Akhir thesis, University Technology Yogyakarta.

Dwi Wicaksono, Wahyu and A. Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH PECAHAN HEBEL DAN ABU CANGKANG SAWIT TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 0%, 13%, 16% DAN 19% THE EFFECT OF THE MIXING OF HEBEL FRAGED WASTE AND PALM OIL ASH ON THE PROPERLY DESIGNED LIGHTWEIGHT OF 20 MPA CONCRETE PRESSURE WITH A PERCENTAGE OF 0%, 13%, 16% AND 19%. Tugas Akhir thesis, University of Technology Yogyakarta.

Dzakwan H, Muhammad and Kurniati, Dwi (2021) MODIFIKASI STRUKTUR GEDUNG RESEARCH AND INNOVATION CENTER OF DASRON HAMID UMY DENGAN MENGGUNAKAN KOLOM RECTANGULAR CONCRETE FILLED STEEL TUBE (RCFST)STRUCTURE MODIFICATION OF THE RESEARCH AND INNOVATION CENTER OF DASRON HAMID UMY BUILDING USING RECTANGULAR CONCRETE FILLED STEEL TUBE (RCFST) COLUMN. Tugas Akhir thesis, University Technology Yogyakarta.

Efendi Nasution, Syahrijal and bhaskara, Adwitya (2021) EVALUASI WAKTU PROYEK DENGAN KONSEP NILAI HASIL (EARNED VALUE CONCEPT) (Studi Kasus Proyek Pembangunan Gedung DPRD, Klaten) PROJECT TIME EVALUATION WITH EARNED VALUE CONCEPT (Case Study of the DPRD Building Construction Project, Klaten). Tugas Akhir thesis, University Technology Yogyakarta.

Eko Prabowo, Andri and A. Masagala, Algazt (2021) SELF HEALING CONCRETE MENGGUNAKAN BAKTERI BACILLUS SP DAN SPOROSARCINA SP SEBAGAI SOLUSI KERUSAKAN INFRASTRUKTUR BETON BERTULANG SELF HEALING CONCRETE USING BACTERI BACILLUS SP AND SPOROSARCINA SP AS A SOLUTION REINFORMED CONCRETE INFRASTRUCTURE DAMAGE. Tugas Akhir thesis, University of Technology Yogyakarta.

Enrico Souhuwat, Novi and Dita Saputro, Cahyo (2021) ANALISIS PERBANDINGAN BIAYA PEKERJAAN KOLOM ANTARA METODE BETON KONVENSIONAL DENGAN PRECAST ( Studi kasus Proyek Pembangunan Gedung Laboratorium Vokasi Kampus Wates Tahap 1 ) COMPARATIVE ANALYSIS OF COLUMN WORK COSTS USING CONVENTIONAL AND PRECAST CONCRETE METHODS (Case study of Wates Campus Vocational Laboratory Building Construction Project Phase 1). Tugas Akhir thesis, University Technology Yogyakarta.

Facatle, M Taufik A.S and Masagala, Algazt Aryad (2021) PEMANFAATAN LIMBAH MARMER SEBAGAI BAHAN CAMPUR AGREGAT HALUS DENGAN PERSENTASE 5%, 10%, 15%, DAN POTONGAN KAWAT BENDRAT 5% SEBAGAI BAHAN TAMBAH PAVING BLOCK UTILIZATION OF MARBLE WASTE AS A MIXED MATERIAL OF FINE AGGREGATE WITH A PERCENTAGE OF 5%, 10%, 15%, AND 5% BENDRAT WIRE CUTTING AS A PAVING BLOCK ADDITIONAL MATERIAL. Tugas Akhir thesis, University Technology Yogyakarta.

Fachrurriza, Hamda and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH KARBIT TERHADAP KUAT TEKAN BATA BETON PERSENTASE 1%, 3%, DAN 5% THE EFFECT OF WASTE CARBITE SUBSTITUTION ON THE COMPRESSION STRENGTH OF CONCRETE BRICK PERCENTAGE 1%, 3%, AND 5%. Tugas Akhir thesis, University Technology Yogyakarta.

Fadilla Yasmin, Alfira and Setiawan, Danny (2021) ANALISIS KAPASITAS TINGKAT PELAYANAN DAN KINERJA RUAS JALAN INSPEKSI KALIMALANG ANALYSIS OF SERVICE LEVEL CAPACITY AND PERFORMANCE OF ROAD INSPECTION KALIMALANG ROAD. Tugas Akhir thesis, University Technology Yogyakarta.

Fadlila, Muhammad Rizky and Budianto, Johan (2021) EVALUASI KINERJA STRUKTUR GEDUNG TAHAN GEMPA DENGAN ANALISIS PUSHOVER MENGGUNAKAN PROGRAM SAP2000 EVALUATION OF THE PERFORMANCE OF EARTHQUAKE-RESISTANT BUILDING STRUCTURES WITH PUSHOVER ANALYSIS USING SAP2000 PROGRAM. Tugas Akhir thesis, University Technology Yogyakarta.

Fahreza Suhada, Yafie and Septi Hendrasari, Ratna (2021) PERENCANAAN BANGUNAN PELINDUNG PANTAI GROIN DI PANTAI CIPARANTI KABUPATEN PANGANDARAN PLANNING OF GROIN BEACH PROTECTIVE BUILDING IN CIPARANTI BEACH, PANGANDARAN DISTRICT. Tugas Akhir thesis, University of Technology Yogyakarta.

Fahtoni, Hamzah and Melyadi Putri, Nanda (2021) ANALISIS MODEL PENGENDALIAN GERUSAN LOKAL PADA HILIR BENDUNG KOLAM OLAK TIPE VLUGHTER DENGAN PELINDUNG GROUNDSILL AMBANG DATAR DAN AMBANG PELIMPAH CONTROL MODEL OF LOCAL SCOUR IN DOWNSTREAM OF WEIR STILLING BASIN VLUGHTER TYPE WITH GROUNDSILL PROTECTION OF BED GINDLE WORK AND HEAD WORK FLAT. Tugas Akhir thesis, University of Technology Yogyakarta.

Falah, Khoirunnisa Nurul and Kurniati, Dwi (2021) PEMANFAATAN LIMBAH BATUBARA SEBAGAI SUBSTITUSI PASIR DENGAN PERSENTASE 50%, 75%, DAN 100% PADA BATAKO UTILIZATION OF COAL WASTE AS A SAND SUBSTITUTE WITH A PERCENTAGE OF 50%, 75%, AND 100% IN Brick. Tugas Akhir thesis, University Technology Yogyakarta.

Fatimah, Isma Yulfa and Ismaili, Abul Fida (2021) ANALISIS KERUSAKAN DAN TRACK QUALITY INDEX (TQI) PADA KOMPONEN JALAN REL Studi Kasus: Jalur Jogja-Wates Km 220-Km 224 DAOP 6 Yogyakarta ANALYSIS OF DAMAGE AND TRACK QUALITY INDEX (TQI) ON RAIL ROAD COMPONENTS Case Study: Jogja-Wates Line Km 220-Km 224 DAOP 6 Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Fatimah, Isma Yulfa and Ismaili, Abul Fida (2021) ANALISIS KERUSAKAN DAN TRACK QUALITY INDEX (TQI) PADA KOMPONEN JALAN REL Studi Kasus: Jalur Jogja-Wates Km 220-Km 224 DAOP 6 Yogyakarta ANALYSIS OF DAMAGE AND TRACK QUALITY INDEX (TQI) ON RAIL ROAD COMPONENTS Case Study: Jogja-Wates Line Km 220-Km 224 DAOP 6 Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Fatkhurrizki, Bayu and Budianto, Johan (2021) EVALUASI DESAIN STRUKTUR BETON BERTULANG BERDASARKAN SNI TAHUN 2019 Studi Kasus Gedung Pusat MAN 2 Kulon Progo EVALUATION OF REINFORCED CONCRETE STRUCTURE DESIGN BASED ON SNI IN 2019 Case Study of Central Building MAN 2 Kulon Progo. Tugas Akhir thesis, University Technology Yogyakarta.

Fatria, Adrian and Aryad Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH TEMPURUNG KELAPA TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 90%, 95%, DAN 100% THE EFFECT LEVEL OF COCONUT WASTE MIXING ON THE STRENGTH OF LIGHTWEIGHT DESIGNED CONCRETE 20 MPA WITH A 90%, 95% AND 100% PERCENTAGE. Tugas Akhir thesis, University of Technology Yogyakarta.

Faturrahman, Dwika and Kurniati, Dwi (2021) EVALUASI SISTEM PROTEKSI KEBAKARAN PADA BANGUNAN HOTEL ZODIAK BANDUNG EVALUATION OF FIRE PROTECTION SYSTEM IN BANDUNG ZODIAK HOTEL BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Faustina, Arneta and Saputro, Cahyo Dita (2021) PENJADWALAN ULANG MENGGUNAKAN METODE PRECEDENCE DIAGRAM METHOD (PDM) (Studi Kasus : Proyek Pembangunan Jalur Kereta Api Bandara Yogyakarta International Airport) SCHEDULING USING PRECEDENCE DIAGRAM METHOD (PDM) (Case Study: Yogyakarta International Airport Railroad Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Fauzi, Muhammad and Nuraini, Rika (2021) PEMETAAN MULTI-BENCANA PADA JALUR KERETA API LINTAS SELATAN DARI STA. WATES-STA. KUTOWINANGUN MULTI-DISASTER MAPPING ON TRAIN SOUTH LINE FROM WATES- RAILWAY STATION TO . KUTOWINANGUN RAILWAY STATION. Tugas Akhir thesis, University of Technology Yogyakarta.

Febrianto, Niken Enom and Kurniati, Dwi (2021) PEMANFAATAN LIMBAH BATU BARA SEBAGAI SUBTITUSI PASIR DENGAN PERSENTASE 5%, 55%, DAN 80% PADA BATAKO UTILIZATION OF WASTE COAL AS A SAND SUBSTITUTE WITH A PERCENTAGE OF 5%, 55%, AND 80% IN BATAKO. Tugas Akhir thesis, University Technology Yogyakarta.

Febrianto, Wahid and Dita Saputro, Cahyo (2021) ANALISIS KELAYAKAN INVESTASI PEMBANGUNAN PERUMAHAN MENGGUNAKAN METODE NET PRESENT VALUE Studi Kasus: Pembangunan Perumahan Bumi Progo Sejahtera FEASIBILITY ANALYSIS OF RESIDENTIAL DEVELOPMENT INVESTMENT USING NET PRESENT VALUE METHOD Case Study: Bumi Progo Sejahtera Housing Development. Tugas Akhir thesis, University Technology Yogyakarta.

Febriawan, Ivan and Setiawan, Danny (2021) ANALISA TRANSPORTASI UMUM DENGAN ADANYA COVID-19 PADA BANDARA, STASIUN dan TERMINAL ANALYSIS OF PUBLIC TRANSPORTATION WITH COVID-19 AT AIRPORTS, STATIONS AND TERMINALS. Tugas Akhir thesis, University Technology Yogyakarta.

Femi Saita, Nadila and Dita Saputro, Cahyo (2021) ANALISA MANAJEMEN RISIKO DENGAN KONSEP SEVERITY INDEX (SI) PADA PROYEK GEDUNG DARI SUDUT PANDANG KONTRAKTOR Studi Kasus Proyek Pembangunan Teaching Industry Learning Center (TILC) Universitas Gadjah Mada RISK MANAGEMENT ANALYSIS WITH THE CONCEPT OF SEVERITY INDEX (SI) IN THE BUILDING PROJECT FROM CONTRACTOR'S VIEW Case Study of Teaching Industry Learning Center (TILC) Development Project Gadjah Mada University. Tugas Akhir thesis, University of Technology Yogyakarta.

Ferdiansyah, Reza and Melyadi Putri, Nanda (2021) ANALISIS KEBUTUHAN AIR TANAMAN DAN KETERSEDIAAN AIR IRIGASI TERHADAP POLA TATA TANAM Studi Kasus: Saluran Induk Kalibawang ANALYSIS OF PLANT WATER NEEDS AND AVAILABILITY OF IRRIGATION WATER TO CROPPING PATTERNS Case Study: Kalibawang Main Channel. Tugas Akhir thesis, University of Technology Yogyakarta.

Fernando, Teguh and Utomo, Puji (2021) EVALUASI KINERJA KANTONG LUMPUR PADA BENDUNG SEKARSULI PERFORMANCE EVALUATION OF MUD BAGS AT SEKARSULI WEIR. Tugas Akhir thesis, University Technology Yogyakarta.

Ferniawan, Faizal Tedy and Asyifa, Adwiyah (2021) ANALISIS STABILITAS LERENG UNTUK UPAYA PENCEGAHAN TANAH LONGSOR DENGAN MENGGUNAKAN SIMPLIFED BISHOP METHOD DAN PROGRAM PLAXIS V.8.6. (Studi Kasus : Dusun Gayamharjo, Yogyakarta) SLOPE STABILITY ANALYSIS FOR LANDSLIDE PREVENTION USING SIMPLIFED BISHOP METHOD AND PLAXIS V.8.6 PROGRAM. (Case Study: Gayamharjo Hamlet, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Fesyaputri Arndarnijariah, Faqi and Dita Saputro, Cahyo (2021) ANALISIS PENILAIAN KINERJA GREEN BUILDING PADA PROYEK REHABILITASI BANGUNAN PASAR PRAWIROTAMAN KOTA YOGYAKARTA ANALYSIS OF GREEN BUILDING PERFORMANCE ASSESSMENT IN PRAWIROTAMAN MARKET BUILDING REHABILITATION PROJECT, YOGYAKARTA CITY. Tugas Akhir thesis, University of Technology Yogyakarta.

Firdauz, Adam and Hendrasari, Ratna Septi (2021) EVALUASI BAK SEDIMENTASI DAN PEMERIKSAAN AIR SALURAN INLET DAN OUTLET BAK SEDIMENTASI PDAM BANTUL UNIT IKK SEDAYU EVALUATION OF SEDIMENTATION TANK AND INSPECTION OF WATER INLET AND OUTLET SEDIMENTATION TANK AT BANTUL PDAM UNIT IKK SEDAYU. Tugas Akhir thesis, University Technology Yogyakarta.

Firdayanti S, Sella and Susilo, Dibyo (2021) PEMILIHAN MODEL HUBUNGAN ANTARA VOLUME, KECEPATAN DAN KEPADATAN LALU LINTAS (Studi Kasus: Jalan Panembahan Senopati, Kota Yogyakarta) SELECTION OF RELATIONSHIP MODEL BETWEEN VOLUME, SPEED AND TRAFFIC DENSITY (Case Study: Jalan Panembahan Senopati, Yogyakarta City). Tugas Akhir thesis, University Technology Yogyakarta.

Firhan Mahendra, Maulana and Setiawan, Danny (2021) ANALISIS LOGISTIK BARANG KARGO DI BANDARA YOGYAKARTA LOGISTIC ANALYSIS OF CARGO GOODS AT YOGYAKARTA AIRPORT. Tugas Akhir thesis, University Technology Yogyakarta.

Fitri, Banowati Azalia and Saputro, Cahyo Dita (2021) ANALISIS PERCEPATAN PELAKSANAAN PROYEK BERDASARKAN PENAMBAHAN TENAGA KERJA (Studi Kasus : Proyek Pembangunan Rumah Susun Ponpes Baitul Izza, Kabupaten Wonogiri, Jawa Tengah) ANALYSIS OF ACCELERATION OF PROJECT IMPLEMENTATION BASED ON ADDITIONAL LABOR (Case Study: Baitul Izza Islamic Boarding School Flat Construction Project, Wonogiri Regency, Central Java). Tugas Akhir thesis, University Technology Yogyakarta.

Fitriansyah, Muhammad Daffa and Utomo, Puji (2021) KAJIAN EROSI LAHAN DENGAN MENGGUNAKAN METODE MUSLE PADA DAS BENDUNGAN PAJENGKOLAN STUDY OF LAND EROSION USING MUSLE METHOD IN PAJENGKOLAN DAM WATERSHED. Tugas Akhir thesis, University Technology Yogyakarta.

Friscilya, Anisya and Ismaili, Abul Fida (2021) ANALISIS KERUSAKAN DAN TRACK QUALITY INDEX (TQI) PADA KOMPONEN JALAN REL (Sudi Kasus: Lintas Stasiun Wates – Stasiun Sentolo Km.516+300 – Km.520+300 Daerah Operasi 6 Yogyakarta) ANALYSIS OF DAMAGE AND TRACK QUALITY INDEX (TQI) ON RAIL ROAD COMPONENTS (Case Study: Cross Wates Station – Sentolo Station Km.516+300 – Km.520+300 Operational Area 6 Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Galih Ramadani, Muhammad and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No.21 TAHUN 2019 Studi Kasus Pekerjaan Plat Lantai Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jendral Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PWPH No.21 of 2019 A Case Study of Floor Plate Work on the Learning Service Building Project of the Faculty of Social and Political Sciences, Jendral Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Gentur Pratomo, Kevin and Aryad Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH TEMPURUNG KELAPA TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 60%, 65%, DAN 70% THE EFFECT LEVEL OF COCONUT WASTE MIXING ON THE STRENGTH OF LIGHTWEIGHT DESIGN CONCRETE 20 MPA WITH A PERCENTAGE OF 60%, 65%, AND 70%. Tugas Akhir thesis, University of Technology Yogyakarta.

Gibran M. Djafar, Virgiawan and Nuraini, Rika (2021) PENGARUH PENAMBAHAN BAKTERI BACILLUS SUBTILIS DENGAN METODE ENKAPSULASI HIDROGEL UNTUK SELF HEALING CONCRETE THE EFFECT OF ADDITIONAL BACILLUS SUBTILIS WITH THE HYDROGEL ENKAPSULATION METHOD FOR SELF HEALING CONCRETE. Tugas Akhir thesis, University Technology Yogyakarta.

Gradiyanto, Muhammad Kelvin and Nurhidayatullah, Eka Faisal (2021) REDESAIN STRUKTUR ATAS APARTEMEN EPICENTRUM SEPATAN MENGGUNAKAN KONSTRUKSI BAJA STRUCTURAL REDESIGN OF SEPATAN EPICENTRUM APARTMENT USING STEEL CONSTRUCTION. Tugas Akhir thesis, University Technology Yogyakarta.

Gumelar As’at, Fauzan and Nuriani, Rika (2021) BAKTERI BACILLUS SUBTILIS SEBAGAI AGEN SELF HEALING CONCRETE DENGAN VARIASI PERSENTASE DAN NILAI PH BACILLUS SUBTILIS AS A SELF HEALING CONCRETE AGENT WITH VARIATION OF PERCENTAGE AND PH VALUE. Tugas Akhir thesis, University of Technology Yogyakarta.

Hadi, Dita Listiyanto and Kurniati, Dwi (2021) ANALISIS PERBANDINGAN PERENCANAAN ULANG METODE PENEBALAN PELAT DENGAN KEPALA KOLOM DAN PELAT DATAR GEDUNG INSPEKTORAT COMPARISON ANALYSIS OF REPLANNING METHOD OF THICKNESS WITH COLUMN HEADS AND FLAT Slabs INSPECTORATE BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Hamza, Muhammad Aulia and Ismaili, Abul Fida (2021) ANALISIS EFEK KADAR AIR 2,5%, 3% DAN 3,5% DALAM AGREGAT CAMPURAN LAPISAN ASPAL BETON AC-WC DITINJAU DENGAN KARAKTERISTIK MARSHALL EFFECT ANALYSIS OF WATER CONTENT 2.5%, 3% AND 3.5% IN AGGREGATE MIXED ASPHALT CONCRETE LAYER AC-WC REVIEWING WITH MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University Technology Yogyakarta.

Hamzah, Seprianto and Fida Ismaili, Abul (2021) IDENTIFIKASI BENCANA PADA JALUR EVAKUASI GUNUNG MERAPI STUDI KASUS KABUPATEN SLEMAN DISASTER IDENTIFICATION ON THE EVACUATION LINE OF THE MERAPI MOUNTAIN CASE STUDY OF SLEMAN DISTRICT. Tugas Akhir thesis, University of Technology Yogyakarta.

Hari Tris Handika, Refri and Melyadi Putri, Nanda (2021) PERENCANAAN GROUNDSILL DI HILIR BENDUNG PESAYANGAN KABUPATEN TEGAL JAWA TENGAH GROUNDSILL PLANNING IN HILIR BENDUNG PESAYANGAN, TEGAL DISTRICT, CENTRAL JAVA. Tugas Akhir thesis, University of Technology Yogyakarta.

Hartandy, Satriyo Bagas and Masagala, Algazt Aryad (2021) ANALISIS KUAT TEKAN BETON DENGAN BATU APUNG 10 %, 15 %, 20 % SEBAGAI SUBSTITUSI AGREGAT KASAR DAN BUBUK TEPUNG TULANG 10 % SEBAGAI SUBSTITUSI SEMEN ANALYSIS OF CONCRETE COMPRESSIVE STRENGTH WITH PUMICE STONE 10 %, 15 %, 20 % AS A SUBSTITUTION OF COARD AGGREGATE AND BONE FLOUR POWDER 10 % AS CEMENT SUBSTITUTION. Tugas Akhir thesis, University Technology Yogyakarta.

Hendrawan, Riyan and Kurniati, Dwi (2021) REDESAIN GEDUNG EDUCATION FOR SUSTAINABLE DEVELOPMENT UNIVERSITAS GADJAH MADA YOGYAKARTA DENGAN METODE FLAT PLATE REDESIGN OF EDUCATION BUILDING FOR SUSTAINABLE DEVELOPMENT UNIVERSITY OF GADJAH MADA YOGYAKARTA WITH FLAT PLATE METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Heriyanto, Eka and Nurhidayatullah, Eka Faisal (2021) PERENCANAAN ULANG STRUKTUR ATAS JEMBATAN TRIRENGGO - PURWOREJO DENGAN MENGGUNAKAN PCI-GIRDER BETON PRATEGANG STRUCTURAL REDESIGN OF TRIRENGGO BRIDGE - PURWOREJO USING PRESTRESSED CONCRETE PCI-GIRDER. Tugas Akhir thesis, University Technology Yogyakarta.

Hialendra, Diuta and Bhaskara, Adwitya (2021) EVALUASI REKAYASA NILAI DENGAN MENGGUNAKAN ANALISIS SEMI-ESTIMASI PADA SHEARWALL (Studi Kasus: Pembangunan Rumah Susun Univ. Ris Maduma) EVALUATION OF VALUE ENGINEERING USING SEMI-ESTIMATION ANALYSIS ON SHEARWALL (Case Study: Construction of Flats at Ris Maduma Univ.). Tugas Akhir thesis, University Technology Yogyakarta.

Hidayat, Wahyu Nurul and Hendrasari, Ratna Septi (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH KECAMATAN BANJARNEGARA ANALYSIS OF CLEAN WATER DEMANDS AND AVAILABILITY IN BANJARNEGARA SUB-DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Hidayat Mursila, Fahmi and A. Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH PECAHAN HEBEL DAN ABU CANGKANG SAWIT TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 0%, 4%, 7% DAN 10% THE EFFECT OF THE MIXING OF HEBEL FRAGED WASTE AND PALM OIL ASH ON THE PROPERLY DESIGNED LIGHTWEIGHT OF 20 MPA CONCRETE PRESSURE WITH 0%, 4%, 7% AND 10% PERCENTAGE. Tugas Akhir thesis, University of Technology Yogyakarta.

Hidayatulloh, Agus and Masagala, Algazt Aryad (2021) STUDI EKSPERIMENTAL PERVIOUS CONCRETE RAMAH LINGKUNGAN DAN BERKELANJUTAN MENGGUNAKAN LIMBAH FIBER GLASS SEBAGAI BAHAN TAMBAH DENGAN KADAR 0,01%, 0,02%, 0,03% EXPERIMENTAL STUDY OF ENVIRONMENTALLY FRIENDLY AND SUSTAINABLE PERVIOUS CONCRETE USING WASTE FIBER GLASS AS ADDITIONAL MATERIALS AT LEVELS OF 0.01%, 0.02%, 0.03%. Tugas Akhir thesis, University Technology Yogyakarta.

Hijrawan, Jeri and Putri, Nanda Melyadi (2021) ANALISIS SISTEM PERPIPAAN PENYEDIAAN AIR BERSIH DI MENGGUNAKAN PROGRAM EPANET Studi Kasus : Perumahan Griya Pesona Ravelina, Kecamatan Kambu, Kota Kendari ANALYSIS OF CLEAN WATER SUPPLY PIPING SYSTEM USING EPANET PROGRAM Case Study : Griya Pesona Ravelina Housing, Kambu District, Kendari City. Tugas Akhir thesis, University Technology Yogyakarta.

Hisyam, Muhammad Syahrul and Asyifa, Adwiyah (2021) LISIS OPERASIONAL PELABUHAN PERIKANAN DI JUWANA ANALYSIS OF FISHERY PORT OPERATIONS IN JUWANA. Tugas Akhir thesis, University Technology Yogyakarta.

Hokon, Theresia C. S. (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR IRIGASI PADA DAERAH IRIGASI GAMPING ANALYSIS OF IRRIGATION WATER DEMAND AND AVAILABILITY IN GAMPING IRRIGATION AREA. Tugas Akhir thesis, University Technology Yogyakarta.

Huda, Muhammad Nailul and Utomo, Puji (2021) INDEKS PENGGUNAAN AIR (IPA) GUNA PENGHEMATAN AIR IRIGASI DI D.I SAPON KABUPATEN KULON PROGO WATER USE INDEX (IPA) FOR IRRIGATION WATER SAVING IN SAPON D.I. KULON PROGO REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Husen, Teguh Rivai and Budianto, Johan (2021) PEMODELAN DAN ANALISIS STRUKTUR GEDUNG MENGGUNAKAN METODE BIM (BUILDING INFORMATION MODELLING) BUILDING STRUCTURE MODELING AND ANALYSIS USING BIM (BUILDING INFORMATION MODELLING) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Hutapea, Ayesa Putri Nemargi and Kurniati, Dwi (2021) ANALISIS PERKUATAN BRACING TIPE Z PADA GEDUNG STUDENT CENTER ATMA JAYA YOGYAKARTA ANALYSIS OF TYPE Z BRACING REINFORCEMENT AT STUDENT CENTER ATMA JAYA YOGYAKARTA BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Hutapea1, Ayesa Putri Nemargi and Kurniati, Dwi (2021) ANALISIS PERKUATAN BRACING TIPE Z PADA GEDUNG STUDENT CENTER ATMA JAYA YOGYAKARTA ANALYSIS OF TYPE Z BRACING REINFORCEMENT AT STUDENT CENTER ATMA JAYA YOGYAKARTA BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Ichsan, Adhitya Nur and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH KARBIT DENGAN PERSENTASE 4%, 6%, DAN 8%SEBAGAI BAHAN CAMPURAN BATA BETON THE EFFECT OF WASTE CARBITE SUBSTITUTION WITH 4%, 6%, AND 8% PERCENTAGE AS A CONCRETE BRICK MIXTURE MATERIAL. Tugas Akhir thesis, University Technology Yogyakarta.

Ikhwani, Rofikul and Nurhidayatullah, Eka Faisal (2021) ANALISIS PERBANDINGAN STRUKTUR ATAS JEMBATAN MENGGUNAKAN TIPE I GIRDER PRATEGANG DENGAN BOX GIRDER PRATEGANG Studi Kasus : Jembatan Lungge Dukuh Mudal Kecamatan Temanggung Kabupaten Temanggung Jawa Tengah COMPARISONAL ANALYSIS OF THE STRUCTURE OF THE BRIDGE USING TYPE I prestressing GIRDER WITH BOX GIRDER prestressing Case Study : Lungge Dukuh Mudal Bridge, Temanggung District, Temanggung Regency, Central Java. Tugas Akhir thesis, University Technology Yogyakarta.

Imammudin, Taufik and Masagala, Algazt Aryad (2021) STUDI EKSPERIMENTAL PERVIOUS CONCRETE RAMAH LINGKUNGAN DAN BERKELANJUTAN MENGGUNAKAN LIMBAH FIBER GLASS SEBAGAI BAHAN TAMBAH DENGAN KADAR 0,07%, 0,08% & 0,09% EXPERIMENTAL STUDY OF ENVIRONMENTALLY FRIENDLY AND SUSTAINABLE PERVIOUS CONCRETE USING WASTE FIBER GLASS AS ADDITIONAL MATERIALS AT LEVELS OF 0.07%, 0.08% & 0.09%. Tugas Akhir thesis, University Technology Yogyakarta.

Indra Sukmana, Arya and Melyadi Putri, Nanda (2021) ANALISIS KEKERINGAN DENGAN METODE STATISTIK (METODE RUN DAN METODE PNI) Studi Kasus Daerah aliran Sungai Kali Gajah Wong DROUGHT ANALYSIS WITH STATISTICAL METHOD (RUN METHOD AND PNI METHOD) A Case Study of the Gajah Wong River Basin. Tugas Akhir thesis, University of Technology Yogyakarta.

Indria Wijaya, Prima and Bhaskara, Adwitya (2021) ANALISIS BIAYA PEKERJAAN BETON BERTULANG DENGAN MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus Proyek Pembangunan Rusun Gowok, Yogyakarta) ANALYSIS OF WORK COST OF REPEATABLE CONCRETE USING THE MICROSOFT PROJECT (Case Study of Gowok Flat Development Project, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Indriani, Ninda and Setiawan, Danny (2021) ANALISIS PERBANDINGAN DISTRIBUSI SEMEN PT. HOLCIM INDONESIA Tbk. SEBELUM MASA PANDEMI COVID-19 DAN PADA MASA COVID-19 COMPARATIVE ANALYSIS OF CEMENT DISTRIBUTION PT. HOLCIM INDONESIA TBK. BEFORE THE PANDEMIC TIME OF COVID-19 AND IN THE TIME OF COVID-19. Tugas Akhir thesis, University of Technology Yogyakarta.

Intan Puspo Awali, Dinik and Susilo, Dibyo (2021) EVALUASI KINERJA TERMINAL BUS TIPE A BERDASARKAN STANDAR PELAYANAN MINIMUM MENGGUNAKAN METODE IMPORTANCE PERFORMANCE ANALYSIS (Studi Kasus Terminal Bulupitu Purwokerto) PERFORMANCE EVALUATION OF TYPE A BUS TERMINALS BASED ON MINIMUM SERVICE STANDARDS USING IMPORTANCE PERFORMANCE ANALYSIS METHOD (Case Study of Bulupitu Purwokerto Terminal). Tugas Akhir thesis, University of Technology Yogyakarta.

Irawan, Didik Nur and Budianto, Johan (2021) REDESAIN MASJID AL-MUSTAQIM MENGGUNAKAN SISTEM STRUKTUR RANGKA BAJA REDESIGN OF AL-MUSTAQIM MOSQUE USING STEEL FRAME STRUCTURE SYSTEM. Tugas Akhir thesis, University Technology Yogyakarta.

Irfan, Muhammad and Nurhidayatullah, Eka Faisal (2021) PERBANDINGAN STRUKTUR ATAS JEMBATAN KERETA API TIPE WARREN TRUSS DENGAN TIPE K-TRUSS Studi Kasus : Jembatan Kali Abang, Karanganyar, Kebumen, Jawa Tengah COMPARISON OF THE TRAIN BRIDGE UPPER STRUCTURE TYPE WARREN TRUSS WITH TYPE K-TRUSS Case Study: Kali Abang Bridge, Karanganyar, Kebumen, Central Java. Tugas Akhir thesis, University Technology Yogyakarta.

Iskandar, Dian and Nuraini, Rika (2021) GIS SEBAGAI IDENTIFIKASI JALAN RAYA PANTURA TERHADAP POTENSI KERAWANAN BENCANA BANJIR RON DAN AMBLESAN Study Kasus Jalan Pantura Kecamatan Besuki-Panarukan Kabupaten Situbondo GIS AS IDENTIFICATION OF THE PANTURA HIGHWAY AGAINST POTENTIAL VULNERABILITIES TIDAL FLOOD DISASTER AND SUBSIDENCE Case Study of Pantura Road, Besuki-Panarukan District, Situbondo Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Iskandar, Diki and Masagala, Algazt Aryad (2021) PERANCANGAN ULANG STRUKTUR JEMBATAN MUJA MUJU JALUR LAMBAT KOTA YOGYAKARTA MENGGUNAKAN RANGKA BAJA TYPE BALTIMORE TRUSS STRUCTURE REDESIGN OF MUJA MUJU BRIDGE SLOW ROUTE IN YOGYAKARTA CITY USING STEEL FRAME TYPE BALTIMORE TRUSS. Tugas Akhir thesis, University Technology Yogyakarta.

Ismaili, Abul Fida and Setiawan, Danny (2021) MODUL DAN VIDEO PRAKTIKUM BAHAN PERKERASAN JALAN TA 2021/2022. [Teaching Resource]

Isro’i, Ahmad and Nurhidayatullah, Eka Faisal (2021) PERBANDINGAN DESAIN SERTA PERILAKU GEDUNG HOTEL DAN CONDOTEL-ATTURE LLOYD’S DENGAN BEBAN GEMPA RESPON SPEKTRUM DAN RIWAYAT WAKTU COMPARISON OF LLOYD'S HOTEL AND CONDOTEL-ATTURE BUILDING DESIGN AND BEHAVIOR WITH EARTHQUAKE LOADING RESPONSE SPECTRUM AND TIME HISTORY. Tugas Akhir thesis, University Technology Yogyakarta.

Jaladara, Raepaksi and Bhaskara, Adwitya (2021) ANALISIS WASTE MATERIAL DENGAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus: Proyek Pembangunan Prasarana Pengendali Banjir Kawasan Strategis NYIA Pada Das Serang (KSN YIA) Kulon Progo) WASTE MATERIAL ANALYSIS WITH LEAN CONSTRUCTION MANAGEMENT APPLICATION (Case Study: Flood Control Infrastructure Development Project for Strategic Areas of NYIA in Serang Watershed (KSN YIA) Kulon Progo). Tugas Akhir thesis, University Technology Yogyakarta.

Jatmiko, Adi and Nurhidayatullah, Eka Faisal (2021) KINERJA STRUKTUR DAN PROBABILITAS KERUSAKAN BANGUNAN GEDUNG RUANG DOSEN KAMPUS 1 UNIVERSITAS TEKNOLOGI YOGYAKARTA TERHADAP GEMPA STRUCTURE PERFORMANCE AND PROBABILITY OF BUILDING DAMAGE TO CAMPUS 1 UNIVERSITY OF TECHNOLOGY BUILDING TO EARTHQUAKE. Tugas Akhir thesis, University Technology Yogyakarta.

Jemision, Jemision and Masagala, Algazt Aryad (2021) PEMANFAATAN SAMPAH PLASTIK SEBAGAI PENGGANTI SEMEN PADA PEMBUATAN PAVING BLOCK DENGAN PERSENTASE 65%, 60%, 55% UTILIZATION OF PLASTIC WASTE AS A REPLACEMENT OF CEMENT IN PAVING BLOCK MANUFACTURE WITH PERCENTAGES 65%, 60%, 55%. Tugas Akhir thesis, University Technology Yogyakarta.

Joko Wahyu, Wawan and Susilo, Dibyo (2021) EVALUASI KINERJA SIMPANG BERSINYAL Studi Kasus : Simpang Jl. Colombo, Catur Tunggal, Kecamatan Depok, Kabupaten Sleman PERFORMANCE EVALUATION OF SIGNALED INTERSECTION Case Study: Simpang Jl. Colombo, Catur Tunggal, Depok District, Sleman Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Kapu, Irvan Raynerius and Budianto, Johan (2021) Pemodelan dan Analisis Struktur Gedung Menggunakan Metode BIM (Building Information Modelling) Studi Kasus: Gedung Rusun Prototype-Kota Tegal Modeling and Analysis of Building Structures Using the BIM (Building Information Modeling) Method Case Study: Prototype Flat Building-Kota Tegal. Tugas Akhir thesis, University Technology Yogyakarta.

Katulistiyanto, Riky and Susilo, Dibyo (2021) PEMILIHAN MODEL HUBUNGAN ANTARA VOLUME, KECEPATAN DAN KEPADATAN LALU LINTAS SELECTION OF THE RELATIONSHIP MODEL BETWEEN VOLUME, SPEED AND TRAFFIC DENSITY. Tugas Akhir thesis, University Technology Yogyakarta.

Khalsum, Umykhari and Nuraini, Rika (2021) PENGARUH PENAMBAHAN ABU CANGKANG KERANG TERHADAP PARAMETER KUAT GESER TANAH LEMPUNG THE EFFECT OF ADDING SHELL SHELL ASH ON THE PARAMETERS OF STRENGTH OF CLAY SOIL. Tugas Akhir thesis, University Technology Yogyakarta.

Kristiyawan, Cahyo Setyo Budi and Nurhidayatullah, Eka Faisal (2021) REDESAIN PERBANDINGAN SISTEM RANGKA PEMIKUL MOMEN KHUSUS DENGAN SISTEM RANGKA BRESING EKSENTRIS PADA STRUKTUR BAJA Studi Kasus Gedung PSLH dan ESD Universitas Gadjah Mada COMPARATIVE REDESIGN OF SPECIAL MOMENT RESISTANCE FRAME SYSTEM WITH ECENTRIC BRESSED FRAME SYSTEM IN STEEL STRUCTURE Case Study of PSLH and ESD Building Universitas Gadjah Mada. Tugas Akhir thesis, University Technology Yogyakarta.

Kumalasari, Evi Nur and Hendrasari, Ratna Septi (2021) ANALISIS NERACA AIR DAERAH ALIRAN SUNGAI CODE YOGYAKARTA WATER BALANCE ANALYSIS OF CODE YOGYAKARTA RIVER FLOW. Tugas Akhir thesis, University Technology Yogyakarta.

Kumalasari, Noorlinggar Swastika Dyah and Utomo, Puji (2021) ANALISIS PERENCANAAN PEMANENAN AIR HUJAN SEBAGAI POTENSI PENYEDIAAN AIR BERSIH Studi Kasus: Gedung Laboratorium Komputer Kampus 3 Universitas Ahmad Dahlan ANALYSIS OF RAINWATER HARVESTING PLANNING AS A POTENTIAL FOR CLEAN WATER SUPPLY Case Study: Computer Laboratory Building Campus 3 Ahmad Dahlan University. Tugas Akhir thesis, University Technology Yogyakarta.

Kuncahyo, Asdi and Susilo, Dibyo (2021) PEMILIHAN MODEL HUBUNGAN ANTARA VOLUME, KECEPATAN DAN KEPADATAN LALU LINTAS (Studi Kasus: Jalan KH. Ahmad Dahlan, Yogyakarta) SELECTION OF THE RELATIONSHIP MODEL BETWEEN VOLUME, SPEED AND TRAFFIC DENSITY (Case Study: Jalan KH. Ahmad Dahlan, Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Kurniawan, Dendi and Fida Ismaili, Abul (2021) PEMANFAATANLIMBAHARANG CANGKANGKELAPASAWIT SEBAGAI FILLER DENGAN KADAR 1%, 1,25%, 1,5%, 1,75% DAN 2% PADA CAMPURAN STONE MATRIX ASPHALT 0/8 TERHADAP KARAKTERISTIKMARSHALL UTILIZATION OF COCONUT SHELL CHARACTER AS FILLER WITH CONCENTS OF 1%, 1.25%, 1.5%, 1.75% AND 2% IN STONE MIXTURE OF MATRIX ASPHALT 0/8 TOWARD MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University of Technology Yogyakarta.

Kurniawan Wicaksana, Daniel and Kurniati, Dwi (2021) PERANCANGAN ULANG GEDUNG KANTOR PT. TATSUMI SERUNI INDONESIA - GRESIK MENGGUNAKAN METODE FLAT SLAB DROP PANEL REDESIGN OF THE OFFICE BUILDING OF PT. TATSUMI SERUNI INDONESIA - GRESIK USING THE FLAT SLAB DROP PANEL METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Kusuma, Aditya Hari and Masagala, Algazt Aryad (2021) STUDI EKSPERIMENTAL PERVIOUS CONCRETE RAMAH LINGKUNGAN DAN BERKELANJUTAN MENGGUNAKAN LIMBAH FIBER GLASS SEBAGAI BAHAN TAMBAH DENGAN KADAR 0,04%, 0,05% & 0,06% EXPERIMENTAL STUDY OF ENVIRONMENTALLY FRIENDLY AND SUSTAINABLE PERVIOUS CONCRETE USING WASTE FIBER GLASS AS ADDITIONAL INGREDIENTS AT LEVELS OF 0.04%, 0.05% & 0.06%. Tugas Akhir thesis, University Technology Yogyakarta.

Kusumawati, Erni and Nuraini, Rika (2021) PENGARUH PENAMBAHAN LIMBAH GYPSUM DAN ABU LIMBAH KERTAS TERHADAP STABILISASI TANAH LEMPUNG EFFECT OF ADDING GYPSUM WASTE AND PAPER ASH ON THE STABILIZATION OF CLAY SOIL. Tugas Akhir thesis, University Technology Yogyakarta.

Laras Ningtyas, Novita and Setiawan, Danny (2021) PERENCANAAN RUTE PERJALANAN ANGKUTAN WISATA DIENG WONOSOBO DENGAN METODE ALGORITMA FLOYD-WARSHALL TRAVEL ROUTE PLANNING FOR DIENG WONOSOBO TOURIST TRANSPORT WITH THE FLOYD-WARSHALL ALGORITHM METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Liftianto Hardono, Adhitya and Budianto Kromodiryo, Johan (2021) PENGARUH PENAMBAHAN CANGKANG KEONG (FLY ASH) DENGAN PERSENTASE 7%, 8%, 9% DAN SIKACIM CONCRETE ADDITIVE SEBESAR 0,7% TERHADAP KUAT TEKAN BETON EFFECT OF ADDITIONAL CONCRETE SHELLS (FLY ASH) WITH A PERCENTAGE OF 7%, 8%, 9% AND A CONCRETE ADDITIVE SIKACIM OF 0.7% ON THE STRENGTH OF CONCRETE PRESS. Tugas Akhir thesis, University of Technology Yogyakarta.

Lubis, Stevan Agustyas and Budianto, Johan (2021) PENGARUH PEMANFAATAN LIMBAH PLASTIK HD (HIGHT DENSITY) SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PERSENTASE 0.5% , 0,8% , DAN 1,1% PENGUJIAN KUAT TEKAN THE EFFECT OF UTILIZING HD (HIGH DENSITY) PLASTIC WASTE AS ADDITIONAL MATERIAL ON PAVING BLOCK WITH A PERCENTAGE OF 0.5% , 0.8% , AND 1.1% TESTING COMPRESSIVE STRENGTH. Tugas Akhir thesis, University Technology Yogyakarta.

Lusiantini, Shania and Ismaili, Abul Fida (2021) ANALISIS DAMPAK PEMBANGUNAN BANDARA DHOHO KEDIRI (DHOHO AIRPORT) TERHADAP KONDISI LINGKUNGAN DAN SOSIAL MASYARAKAT (Studi Kasus : Desa Grogol, Kec. Grogol, Kab. Kediri) IMPACT ANALYSIS OF DHOHO AIRPORT DEVELOPMENT (DHOHO AIRPORT) ON ENVIRONMENTAL AND SOCIAL CONDITIONS OF THE COMMUNITY (Case Study: Grogol Village, Grogol District, Kediri Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Mahendra, Wisnu and Budianto Kromodiryo, Johan (2021) PENGARUH PEMANFAATAN LIMBAH BAMBU (FLY ASH) DENGAN PERSENTASE 2%, 2,5%, 3% DAN PLASTICIZER SEBAGAI BAHAN TAMBAH TERHADAP KUAT TEKAN BETON EFFECT OF UTILIZATION OF BAMBOO WASTE (FLY ASH) WITH A PERCENTAGE OF 2%, 2.5%, 3% AND PLASTICIZER AS AN ADDITIONAL MATERIAL ON THE COMPRESSIVE STRENGTH OF CONCRETE. Tugas Akhir thesis, University of Technology Yogyakarta.

Maji, Dwi Fuad and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH ABU SEKAM PADI TERHADAP BATA BETON DENGAN PERSENTASE 3,5%, 7% DAN 10,5% THE EFFECT OF SUBSTITUTION OF RICE HUSK ASH WASTE ON CONCRETE BRICK WITH A PERCENTAGE OF 3.5%, 7% AND 10.5%. Tugas Akhir thesis, University Technology Yogyakarta.

Mali Mau, Xaveriani Unametri and Ismaili, Abul Fida (2021) ANALISIS KESTABILAN LERENG DENGAN PERKUATAN SOIL NAILING TERHADAP TIGA MODEL KEGAGALAN (Studi Kasus Proyek Pembangunan Bendungan Manikin) SLOPE STABILITY ANALYSIS WITH SOIL NAILING REINFORCEMENT AGAINST THREE FAILURE MODELS (Case Study of Manikin Dam Construction Project). Tugas Akhir thesis, University Technology Yogyakarta.

Marastyanto, Bagas and Nuraini, Rika (2021) ANALISIS POTENSI KERAWANAN BENCANA AMBLESAN DAN ANGIN PUTING BELIUNG PADA JALAN MAGELANG – BOYOLALI KABUPATEN BOYOLALI ANALYSIS OF POTENTIAL SUBSIDENCE AND WHIRLWIND ON MAGELANG STREET – BOYOLALI REGENCY BOYOLALI. Tugas Akhir thesis, University Technology Yogyakarta.

Mardika, Awit and Susilo, Dibyo (2021) PENGUJIAN KUAT LENTUR LAMINASI BALOK KAYU KRUING DAN KAYU JATI BELANDA BENDING STRENGTH TEST KRUING WOOD BEAM LAMINATION AND DUTCH TEAK WOOD. Tugas Akhir thesis, University Technology Yogyakarta.

Margianto, Rahmanu and Kurniati, Dwi (2021) ANALISIS FLAT SLAB DENGAN COLUMN HEAD GEDUNG ASRAMA PUTRI UNIVERSITAS AISYIYAH YOGYAKARTA (UNISA) MENGGUNAKAN SOFTWARE ETABS v.17 FLAT SLAB ANALYSIS WITH COLUMN HEAD ON FEMALE DORMITORY BUILDING OF YOGYAKARTA AISYIYAH UNIVERSITY (UNISA) USING ETABS v.17 SOFTWARE. Tugas Akhir thesis, University Technology Yogyakarta.

Margono, Agus and Ismaili, Abul Fida (2021) PERENCANAAN PENINGKATAN JALAN DARI FLEXIBLE PAVEMENT KE RIGID PAVEMENT PADA RUAS JALAN SERIBU DOLOK– SARAN PADANG DENGAN METODE NAASRA (Studi Kasus Jalan Propinsi Seribu Dolok - Saran Padang) PLANNING OF ROAD IMPROVEMENT FROM FLEXIBLE PAVEMENT TO RIGID PAVEMENT ON SERIBU DOLOK – SARAN PADANG ROAD USING NAASRA METHOD (Case Study of Seribu Dolok - Saran Padang Provincial Road). Tugas Akhir thesis, University Technology Yogyakarta.

Mario Dintais Talo Mau, Ronaldo and Setiawan, Danny (2021) EVALUASI TINGKAT KERUSAKAN JALAN MENGGUNAKAN METODE PAVEMENT CONDITION INDEX (PCI) ( Studi kasus : Jalan Poros Makassar-Maros Km 21-Km 24, Sulawesi Selatan ) ROAD DAMAGE LEVEL EVALUATION USING PAVEMENT CONDITION INDEX (PCI) METHOD (Case study: Jalan Poros Makassar-Maros Km 21-Km 24, South Sulawesi ). Tugas Akhir thesis, University Technology Yogyakarta.

Marvianto Herman, Rezha and Septi Hendrasari, Ratna (2021) ANALISIS DISTRIBUSI KABUTUHAN AIR BERSIH DENGAN SISTEM GRAVITASI MENGGUNAKAN SOFTWARE EPANET 2.0 (Studi Kasus: Desa Triharjo Kabupaten Bantul D.I. Yogyakarta) DISTRIBUTION ANALYSIS OF CLEAN WATER PLANT WITH GRAVITY SYSTEM USING EPANET 2.0 SOFTWARE (Case Study: Triharjo Village, Bantul D.I. Yogyakarta Regency). Tugas Akhir thesis, University of Technology Yogyakarta.

Masagala, Alfatsya Mubian and Bhaskara, Adwitya (2021) OPTIMASI SITE LAYOUT MENGGUNAKAN MULTI OBJECTIVES FUNCTION (Studi kasus: Proyek Pembangunan Apartement Barsa City) SITE LAYOUT OPTIMIZATION USING MULTI OBJECTIVES FUNCTION (Case study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Masagala, Algazt Aryad (2021) MODUL MATA KULIAH STRUKTUR BETON BERTULANG. In: MODUL MATA KULIAH STRUKTUR BETON BERTULANG. Mudaya, Universitas Teknologi Yogyakarta. ISBN -

Masagala, Algazt Aryad (2021) Peer Review Jurnal Perancangan Struktur Atas Jembatan Busur Baja Tipe Tied Arch Bridge Bentang 60 M (Studi Kasus: Jembatan Kali Putih, Magelang). Perancangan Struktur Atas Jembatan Busur Baja Tipe Tied Arch Bridge Bentang 60 M (Studi Kasus: Jembatan Kali Putih, Magelang), 6 (1). pp. 34-46. ISSN 2443-3187

Masagala, Algazt Aryad (2021) Similarity Check Jurnal Perancangan Struktur Atas Jembatan Busur Baja Tipe Tied Arch Bridge Bentang 60 M (Studi Kasus: Jembatan Kali Putih, Magelang). Perancangan Struktur Atas Jembatan Busur Baja Tipe Tied Arch Bridge Bentang 60 M (Studi Kasus: Jembatan Kali Putih, Magelang), 6 (1). pp. 34-46. ISSN 2443-3187

Maulana, Indra and Saputro, Cahyo Dita (2021) ANALISIS SISA MATERIAL KERAMIK BERDASARKAN POLA LANTAI (Studi Kasus: Bangunan Gedung DPRD Sleman) ANALYSIS OF RESIDUAL CERAMIC MATERIALS BASED ON FLOOR PATTERN (Case Study: Sleman DPRD Building). Tugas Akhir thesis, University Technology Yogyakarta.

Maulana Aji, Redha and Kurniati, Dwi (2021) PERENCANAAN ULANG GEDUNG RUMAH SAKIT GIGI DAN MULUT UGM PROF. SOEDOMO MENGGUNAKAN METODE FLAT SLAB DENGAN DROP PANEL DAN COLOUMN HEAD PEMBANGUNAN KONSTRUKSI GEDUNG RSGM UNIVERSITAS GADJAH MADA PROF. SOEDOMO REPLANNING OF PROF SOEDOMO'S DENTAL AND MOUTH HOSPITAL BUILDING, UGM, USING FLAT SLAB METHOD WITH DROP PANEL AND COLOUMN HEAD. Tugas Akhir thesis, University of Technology Yogyakarta.

Maulandani, Resa and Asyifa, Adwiyah (2021) ANALISIS TINGKAT BAHAYA EROSI PADA SUB DAS CITAPEN MENGGUNAKAN APLIKASI ARCGIS ANALYSIS OF EROSION HAZARD LEVEL IN CITAPEN SUBWAYS USING ARCGIS APPLICATION. Tugas Akhir thesis, University of Technology Yogyakarta.

Meda, Aulia Gervano Junior and Budianto, Johan (2021) REDESIGN STRUKTUR ATAS JEMBATAN MENJADI TYPE WARREN TRUSS WITH VERTICAL MENGGUNAKAN METODE BIM (BUILDING INFORMATION MODELLING) REDESIGN THE STRUCTURE OF THE BRIDGE INTO WARREN TRUSS WITH VERTICAL TYPE USING BIM (BUILDING INFORMATION MODELLING) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Meilani, Cindy Duwi and Bhaskara, Adwitya (2021) ANALISIS OPTIMALISASI PENJADWALAN PADA PROYEK MENGGUNAKAN PROGRAM MICROSOFT PROJECT (Studi Kasus Proyek Pembangunan Gedung Asrama Terpadu MTsN 1 Semarang) SCHEDULING OPTIMIZATION ANALYSIS ON PROJECTS USING MICROSOFT PROJECT (Case Study of the Integrated Dormitory Building Project for MTsN 1 Semarang). Tugas Akhir thesis, University Technology Yogyakarta.

Mubarok, Billy and Asyifa, Adwiyah (2021) ANALISIS DEBIT BANJIR RANCANGAN DAN PENGARUHNYA TERHADAP KENAIKAN MUKA AIR BANJIR DENGAN MENGGUNAKAN SOFTWARE HEC-RAS 4.1.0 (Studi Kasus: Sub-DAS Sungai Tenggang Semarang) FLOOD DEPOSIT ANALYSIS AND ITS EFFECT ON FLOOD LEVEL RISE USING HEC-RAS 4.1.0 SOFTWARE (Case Study: Sungai Tenggang Sub-watershed Semarang). Tugas Akhir thesis, University Technology Yogyakarta.

Mubin, Muhammad Aziz and Bhaskara, Adwitya (2021) ANALISIS WASTE MANPOWER DENGAN PENERAPAN LEAN CONSTRUCTION MANAGEMENT (Studi Kasus : Proyek Pembangunan Prasarana Pengendalian Banjir Kawasan Strategis Nyia Pada Das Serang (Ksn Yia) Kulon Progo) WASTE MANPOWER ANALYSIS WITH LEAN CONSTRUCTION MANAGEMENT APPLICATION (Case Study: Regional Flood Control Infrastructure Development Project Nyia's Strategic In Serang Watershed (Ksn Yia) Kulon Progo). Tugas Akhir thesis, University Technology Yogyakarta.

Muhaimin, Ahmad and Budianto, Johan (2021) PENGARUH PEMANFAATAN LIMBAH PLASTIK HD (HIGHT DENSITY) SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PERSENTASE 0.6% , 0,9% , DAN 1,3% PENGUJIAN KUAT TEKAN THE EFFECT OF THE UTILIZATION OF HD (HIGH DENSITY) PLASTIC WASTE AS ADDITIONAL MATERIAL ON PAVING BLOCK WITH A PERCENTAGE OF 0.6% , 0.9% , AND 1.3% TESTING COMPRESSIVE STRENGTH. Tugas Akhir thesis, University Technology Yogyakarta.

Muhammad Antula, Prayogi and Dita saputro, Cahyo (2021) EVALUASI KINERJA BANGUNAN SABO DAM TERHADAP PENGARUH BENCANA LAHAR DINGIN (Studi Kasus : Sabo Dam Kali Boyong Bo-Gs 2A) PERFORMANCE EVALUATION OF SABO DAM BUILDINGS ON THE EFFECT OF COLD LAVA DISASTER (Case Study: Sabo Dam Kali Boyong Bo-Gs 2A). Tugas Akhir thesis, University Technology Yogyakarta.

Mukti Ardianto, Dimas and Utomo, Puji (2021) EVALUASI KINERJA JARINGAN IRIGASI PENDOWO UNTUK MENINGKATKAN EFEKTIFITAS DAN EFISIENSI PENGELOLAAN AIR IRIGASI PERFORMANCE EVALUATION OF PENDOWO IRRIGATION NETWORK TO IMPROVE THE EFFECTIVENESS AND EFFICIENCY OF IRRIGATION WATER MANAGEMENT. Tugas Akhir thesis, University Technology Yogyakarta.

Multajamah, Sindy Syarifah and Ismaili, Abul Fida (2021) ANALISIS POTENSI LIKUIFAKSI TANAH BERDASARKAN METODE PENDEKATAN PERHITUNGAN NILAI STANDARD PENETRATION TEST (SPT) DAN CONE PENETROMETER TEST (CPT) (Studi Kasus: New Yogyakarta International Airport (NYIA)) ANALYSIS OF SOIL LIQUIFACTION POTENTIAL BASED ON STANDARD PENETRATION TEST (SPT) AND CONE PENETRATION TEST (CPT) CALCULATION METHODS (Case Study: New Yogyakarta International Airport (NYIA)). Tugas Akhir thesis, University Technology Yogyakarta.

Munawaroh, Elis Siti and Saputro, Cahyo Dita (2021) ANALISIS PERENCANAAN WAKTU DAN SUMBER DAYA TENAGA KERJA PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Rumah Susun A Politeknik PU Semarang) ANALYSIS OF TIME PLANNING AND MANPOWER RESOURCES ON CONSTRUCTION PROJECTS (Case Study: Construction Project of Flat A of Semarang PU Polytechnic). Tugas Akhir thesis, University Technology Yogyakarta.

Mustofa, Nedi and Nuraini, Rika (2021) IDENTIFIKASI RISIKO KECELAKAAN PERLINTASAN SEBIDANG KERETA API Studi Kasus: Jl. Prambanan Piyungan dan Jl. Pirak Patukan IDENTIFICATION OF RAILROAD LEVEL CROSSINGS ACCIDENT RISK Case Study: Jl. Prambanan Piyungan and Jl. Pirak Patukan. Tugas Akhir thesis, University Technology Yogyakarta.

Mutiara, Rindang and Melyadi Putri, Nanda (2021) PERENCANAAN BANGUNAN PELINDUNG PANTAI TIPE GROIN DI WILAYAH PERAIRAN PANTAI SIGANDU PLANNING OF GROIN TYPE BEACH PROTECTIVE BUILDINGS IN THE SIGANDU BEACH SEA AREA. Tugas Akhir thesis, University of Technology Yogyakarta.

Nasution, Muhammad Adlisyah Rahman and Saputro, Cahyo Dita (2021) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PEKERJAAN PANEL LANTAI AUTOCLAVED AERATED CONCRETE DENGAN PLAT BETON KONVENSIONAL Studi Kasus: Proyek Pembangunan Puskesmas Gondangrejo COMPARISON ANALYSIS OF COST AND TIME FOR AUTOCLAVED AERATED CONCRETE FLOOR PANEL WORK WITH CONVENTIONAL CONCRETE Slabs Case Study: Gondangrejo Community Health Center Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Nasution, Rosdiana and Asyifa, Adwiyah (2021) ANALISIS CURAH HUJAN DAN DEBIT BANJIR RENCANA YANG MENYEBABKAN BANJIR PADA SUB DAS KALI BERINGIN DI KOTA SEMARANG ANALYSIS OF RAINFALL AND FLOOD DISCHARGE PLAN THAT CAUSED FLOOD AT KALI BERINGIN SUB-WATERSHED IN SEMARANG CITY. Tugas Akhir thesis, University Technology Yogyakarta.

Niam, Zidha Alfan and Susilo, Dibyo (2021) ANALISIS TINGKAT KECELAKAAN LALU LINTAS DI JALAN YOGYAKARTA-WONOSARI Studi Kasus : Ruas Jalan KH Agus Salim dan Jalan Siyono-Playen TRAFFIC ACCIDENT RATE ANALYSIS ON YOGYAKARTA-WONOSARI ROAD Case Study : Jalan KH Agus Salim and Jalan Siyono-Playen. Tugas Akhir thesis, University Technology Yogyakarta.

Ningsih, Yunita Widya and Ismaili, Abul Fida (2021) PENGARUH VARIASI TEMPERATUR PEMADATAN DENGAN SUHU 100ºC, 105ºC, 110ºC, 115ºC DAN DAMPAKNYA TERHADAP KINERJA PERKERASAN HOT MIX ASPHALT THE EFFECT OF VARIATION OF COMPACTION TEMPERATURE OF 100ºC, 105ºC, 110ºC, 115ºC , ON THE PERFORMANCE OF HOT MIX ASPHALT PAVEMENT. Tugas Akhir thesis, University Technology Yogyakarta.

Nopriantoro, Dodi and Asyifa, Adwiyah (2021) ANALISIS POTENSI SUMBER MATA AIR DI SEPANJANG ALIRAN HILIR SUNGAI OPAK Studi Kasus Ds. Brintikan, Tirtomartani Sampai Hilir Sungai Opak ANALYSIS OF THE POTENTIAL OF WATER RESOURCES AROUND THE OPAK RIVER'S DOWNSTREAM (Case Study Ds. Brintikan, Tirtomartani Upstream of the Opak River). Tugas Akhir thesis, University Technology Yogyakarta.

Novianto, Anang and Asyifa, Adwiyah (2021) ANALISIS KUALITAS AIR PADA SUMBER MATA AIR DI ALIRAN SUNGAI OPAK (Studi Kasus : Ds. Brintikan, Tirtomartani sampai hilir DAS Opak) ANALYSIS OF WATER QUALITY IN THE SOURCE OF WATER IN THE FLOW OF OPAK RIVER (Case Study: Ds. Brintikan, Tirtomartani to the downstream of the Opak watershed). Tugas Akhir thesis, University Technology Yogyakarta.

Novitasari, Mega and Asyifa, Adwiyah (2021) PREDIKSI KEMAMPUAN IPAL SEWON DALAM MENGOLAH LIMBAH DENGAN JANGKA WAKTU 10 TAHUN KEDEPAN Studi Kasus : Instalasi Pengolahan Air Limbah (IPAL) Sewon Kabupaten Bantul SEWON WWTP CAPABILITY PREDICTION IN PROCESSING WASTE WITH A TIMELINE OF 10 YEARS Case Study : Sewon Wastewater Treatment Plant (WWTP) Bantul . Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Christanto Febri and Bhaskara, Adwitya (2021) OPTIMALISASI PENJADWALAN PADA PEKERJAAN STRUKTUR DENGAN PROGRAM APLIKASI PRIMAVERA PROJECT PLANNER P3 Studi Kasus Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas Isip Universitas Jendral Soedirman SCHEDULING OPTIMIZATION ON STRUCTURE WORK WITH PRIMAVERA PROJECT PLANNER APPLICATION PROGRAM P3 Case Study of the Learning Service Building Project, Faculty of Social Sciences, Jendral Sudirman University. Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Galang and Septi Hendrasari, Ratna (2021) ANALISIS PENGENDALIAN GERUSAN LOKAL PADA PILAR KAPSUL DI DAERAH TIKUNGAN MENGGUNAKAN BRONJONG BESI CONTROL ANALYSIS OF LOCAL DISTRIBUTION ON PILLAR CAPSULE IN BIKE AREA USING IRON GABIONS. Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Ilham Prasetya Adi and Utomo, Puji (2021) STUDI PERENCANAAN PENINGKATAN SISTEM DRAINASE PADA LANDASAN PACU BANDAR UDARA WIRASABA PURBALINGGA AKIBAT PERPANJANGAN LANDASAN PACU PLANNING STUDY OF DRAINAGE SYSTEM IMPROVEMENT AT WIRASABA PURBALINGGA AIRPORT AIRPORT RACE EXTENSION DUE TO RACE EXTENSION. Tugas Akhir thesis, University Technology Yogyakarta.

Nugroho, Novaro Oko and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH ABU SEKAM PADI TERHADAP BATA BETON DENGAN PRESENTASE 4%, 6%, 8% EFFECT OF RICE HUSK ASH WASTE SUBSTITUTION ON CONCRETE BRICK WITH PRESENTATION OF 4%, 6%, 8%. Tugas Akhir thesis, University Technology Yogyakarta.

Nur Indradiansyah, Fiqih and Asyifa, Adwiyah (2021) STABILISASI TANAH LEMPUNG EKSPANSIF MENGGUNAKAN 8% LIMBAH MARMER DAN 0%, 1%, 3% LIMBAH CANGKANG KERANG Studi Kasus Desa Kwagon, Kecamatan Godean, Kabupaten Sleman, Daerah Istimewa Yogyakarta STABILIZATION OF EXPANSIVE CLAY USING 8% MARBLE WASTE AND 0%, 1%, 3% WASTE OF Shells Case Study of Kwagon Village, Godean District, Sleman Regency, Yogyakarta Special Region. Tugas Akhir thesis, University of Technology Yogyakarta.

Nur Rofiq, Achmad and Nuraini, Rika (2021) IDENTIFIKASI POTENSI KERAWANAN BENCANA PADA JALUR KERETA API LINTAS SELATAN MENGGUNAKAN ArcGIS POTENTIAL IDENTIFICATION OF DISASTER HAZARD ON CROSS-SOUTH TRAIN LINE USING ArcGIS. Tugas Akhir thesis, University Technology Yogyakarta.

Nuraini, Rika (2021) Geomorphological Spatial Model of Risk Analysis for Natural Disasters in Heritage Railway Tunnel. Geomorphological Spatial Model of Risk Analysis for Natural Disasters in Heritage Railway Tunnel, 4 (2). pp. 1-13. ISSN 1755-1315

Nuraini, Rika and Ismaili, Abul Fida and Asyifa, Adwiyah (2021) Modul Praktikum Mekanika Tanah I. Universitas Teknologi Yogyakarta, Universitas teknologi Yogyakarta.

Nurbaety, Dwiasih and Setiawan, Danny (2021) ANALISIS DAMPAK LALU LINTAS (ANDALALIN) AKIBAT ADANYA PUSAT PERBELANJAAN (Studi Kasus : Hartono Mall Yogyakarta) TRAFFIC IMPACT ANALYSIS (ANDALALIN) DUE TO THE EXISTENCE OF A SHOPPING CENTER (Case Study: Hartono Mall Yogyakarta). Tugas Akhir thesis, University Technology Yogyakarta.

Nurhadi, Lasin and Masagala, Algazt Aryad (2021) UTILIZATION OF MARBLE WASTE AS A MIXTURE OF FINE AGGREGATE WITH A PERCENTAGE OF 35%, 40%, 45% AND 5% BENDRAT WIRE CUTTING AS A PAVING BLOCK ADDITIONAL MATERIAL. Tugas Akhir thesis, University Technology Yogyakarta.

Nurhasanah, Heny and Asyifa, Adwiyah (2021) KORELASI KUAT GESER DAN TEKAN BEBAS PADA TANAH LEMPUNG DENGAN BAHAN TAMBAH LIMBAH GIPSUM DAN LIMBAH PLASTIK (Studi Kasus Desa Banjarharjo, Kab. Kulon Progo) CORRELATION OF STRENGTH OF SHEARING AND FREE COMPRESSION IN CLAY WITH ADDITIONAL MATERIALS OF gypsum and plastic waste (Case Study in Banjarharjo Village, Kulon Progo Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Nurhidayat, Ade Ihwan and Setiawan, Danny (2021) ANALSIS TINGKAT KECELAKAAN LALU LINTAS DI KOTA YOGYAKARTA TRAFFIC ACCIDENT RATE ANALYSIS IN YOGYAKARTA CITY. Tugas Akhir thesis, University Technology Yogyakarta.

Nurochman, Taufik and Masagala, Algazt Aryad (2021) PENGARUH PENAMBAHAN SERAT NIPAH TERHADAP KUAT LENTUR BETON SERAT PERSENTASE 0%; 0,05%; 0,08% DAN 0,11% LEVEL OF INFLUENCE OF ADDITIONAL FIBER NIPAH WITH A PROCENTAGE OF 0%; 0,05%; 0,08% DAN 0,11% AGAINST FLEXURAL STRENGTH OF FIBER CONCRETE. Tugas Akhir thesis, University Technology Yogyakarta.

Octavianto, I Gede Suma and Putri, Nanda Melyadi (2021) ANALISIS STABILITAS BANGUNAN PENGENDALI SEDIMEN Studi Kasus: Sabo Dam PA-C4 Gunung Lemah, Sungai Pabelan, Kabupaten Magelang SEDIMENT CONTROL BUILDING STABILITY ANALYSIS Case Study: Sabo Dam PA-C4 Gunung Lemah, Pabelan River, Magelang Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Oka, Dimas Ahmad Adi Putra and Kurniati, Dwi (2021) ANALISIS NILAI SIMPANGAN (DRIFT) DAN GAYA DALAM MENGGUNAKAN BRACING KONSENTRIK TIPE-V TERBALIK Studi Kasus Gedung Student Center Universitas Atma Jaya Yogyakarta DRIFT AND INNER STYLE ANALYSIS USING INVERTED V-TYPE CONCENTRIC BRACING Case Study of Atma Jaya University Student Center Building, Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Paerunan, Rahul Sudiro and Ismaili, Abul Fida (2021) PENGARUH VARIASI TEMPERATUR PEMADATAN DENGAN SUHU 115°C, 120°C, 125°C, 130°C, TERHADAP KINERJA PERKERASAN ASPAL THE EFFECT OF VARIATION OF COMPACTION TEMPERATURE OF 115°C, 120°C, 125°C, 130°C, ON THE PERFORMANCE OF ASPHALT PAVEMENT. Tugas Akhir thesis, University Technology Yogyakarta.

Pambudi, Rifky Yanas and Masagala, Algazt Aryad (2021) TINGKAT PENGARUH PENAMBAHAN SERAT NIPAH TERHADAP KUAT LENTUR BETON SERAT DENGAN PERSENTASE 0%; 0,07%; 0,10% DAN 0,13% LEVEL OF INFLUENCE OF ADDITIONAL FIBER ON THE FLEXIBLE STRENGTH OF FIBER CONCRETE WITH THE PERCENTAGE OF 0%; 0.07%; 0.10% AND 0.13%. Tugas Akhir thesis, University Technology Yogyakarta.

Pangestu, Dimas Ageng and Susilo, Dibyo (2021) PERBANDINGAN MODEL HUBUNGAN ANTARA VOLUME KECEPATAN DAN KEPADATAN LALU LINTAS ( Studi Kasus: Jalan Laksda Adisucipto, Kota Yogyakarta ) COMPARISON OF RELATIONSHIP MODEL BETWEEN SPEED VOLUME AND TRAFFIC DENSITY (Case Study: Jalan Laksda Adisucipto, Yogyakarta City). Tugas Akhir thesis, University Technology Yogyakarta.

Pangestu, Odi and Setiawan, Danny (2021) OPTIMALISASI LAHAN PARKIR LIPPO PLAZA DAN PENGARUH AKTIVITAS LIPPO PLAZA TERHADAP KINERJA JALAN LAKSDA ADISUCIPTO OPTIMIZATION OF LIPPO PLAZA PARKING LAND AND THE EFFECT OF LIPPO PLAZA ACTIVITIES ON ROAD PERFORMANCE OF LAKSDA ADISUCIPTO. Tugas Akhir thesis, University Technology Yogyakarta.

Perdan, Fadila Pasha and Fida Ismaili, Abul (2021) Analisis Risiko Kecelakaan dan Keselamatan Pada Perlintasan Sebidang Kereta Api Wilayah Daop 6 Yogyakarta ANALYSIS OF ACCIDENT RISK AND SAFETY AT RAILROAD LEVEL CROSSING IN DOP 6 AREA YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Perdana Yoga, Gilang and Utomo, Puji (2021) KALIBRASI BANGUNAN UKUR DEBIT DAERAH IRIGASI PENDOWO MENGGUNAKAN ALAT CURRENT METER CALIBRATION OF THE PENDOWO IRRIGATION DEBIT MEASUREMENT BUILDING USING CURRENT METER CALIBRATION OF THE PENDOWO IRRIGATION DEBIT MEASUREMENT BUILDING USING CURRENT METER. Tugas Akhir thesis, University Technology Yogyakarta.

Permadi, Nandya Sutan and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN INDEKS PEKERJAAN BETON BERTULANG PADA PILE CAP DAN TIE BEAM BERDASARKAN PERMEN PUPR 28-2016 DAN LAPANGAN COMPARISONAL ANALYSIS OF REINFORCED CONCRETE WORK INDEX ON PILE CAP AND TIE BEAM BASED ON PUPR Ministerial Decree 28-2016 AND FIELD. Tugas Akhir thesis, University Technology Yogyakarta.

Permana Raharja, Aditya and Septi Hendrasari, Ratna (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH KECAMATAN BANJAR DAN KECAMATAN PURWAHARJA KOTA BANJAR ANALYSIS OF NEEDS AND AVAILABILITY OF CLEAN WATER IN BANJAR SUDDISTRICT AND PURWAHARJA SUBDISTRICT KOTA BANJAR. Tugas Akhir thesis, University of Technology Yogyakarta.

Prabowo, Aldhi and Melyadi Putri, Nanda (2021) PERENCANAAN BANGUNAN PEMECAH GELOMBANG DI PANTAI CIPARANTI KABUPATEN PANGANDARAN BREAK WATER BUILDING PLANNING IN CIPARANTI BEACH, PANGANDARAN DISTRICT. Tugas Akhir thesis, University of Technology Yogyakarta.

Prabowo, Bagus and Utomo, Puji (2021) EVALUASI KAPASITAS DRAINASE DI JL. RAYA JANTI – JL. KUSUMANEGARA KECAMATAN BANGUNTAPAN, BANTUL MENGGUNAKAN EPA SWMM 5.1 EVALUATION OF DRAINAGE CAPACITY AT JL. RAYA JANTI – JL. KUSUMANEGARA, BANGUNTAPAN DISTRICT, BANTUL USING EPA SWMM 5.1. Tugas Akhir thesis, University Technology Yogyakarta.

Prabowo, Chandra Wahyu and Setiawan, Danny (2021) ANALISIS TRANSPORTASI PENGANGKUTAN SAMPAH DI KABUPATEN PURWOREJO TRANSPORTATION ANALYSIS WASTE IN PURWOREJO DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Prabu, Herlambang Pangestu and Ismaili, Abul Fida (2021) PENGARUH PENAMBAHAN POLIMER PET PADA ASPAL DENGAN METODE BASAH Kajian Penambahan Polimer PET Pada Aspal Sebanyak 5%, 10%, dan 15% EFFECT OF ADDING PET POLYMER ON ASPHALT WITH WET METHOD Study of Addition of PET Polymer to Asphalt 5%, 10%, and 15%. Tugas Akhir thesis, University Technology Yogyakarta.

Pradana, Alvin and Septi Hendrasari, Ratna (2021) ANALISIS NERACA AIR PADA SUB DAERAH ALIRAN SUNGAI CODE YOGYAKARTA ANALYSIS OF WATER BALANCE IN YOGYAKARTA CODE RIVER FLOWS. Tugas Akhir thesis, University Technology Yogyakarta.

Pradana, Wisnu Ardi and Budianto, Johan (2021) PENGARUH PEMANFAATAN LIMBAH PLASTIK HD (HIGH DENSITY) SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PRESENTASE 0,7%, 1%, DAN 1,2% PENGUJIAN KUAT TEKAN THE EFFECT OF HD PLASTIC WASTE UTILIZATION (HIGH DENSITY) AS ADDITIONAL INGREDIENTS PAVING BLOCK WITH PRESENTATION 0.7%, 1%, AND 1.2% TESTING PRESSURE POWER. Tugas Akhir thesis, University Technology Yogyakarta.

Praditya, Radete Wisnu and Saputro, Cahyo Dita (2021) ANALISIS VALUE ENGINEERING PADA STRUKTUR PONDASI PROYEK HOTEL PATRA MALIOBORO YOGYAKARTA ENGINEERING VALUE ANALYSIS ON THE FOUNDATION STRUCTURE OF THE PATRA MALIOBORO HOTEL PROJECT YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Prakasa Putra, Nigo and Melyadi Putri, Nanda (2021) ANALISIS MODEL PENGENDALIAN GERUSAN LOKAL PADA PILAR BERBENTUK KAPSUL DENGAN PEMASANGAN TIRAI DAN BRONJONG (Eksperimen) ANALYSIS OF LOCAL SHIFT CONTROL MODELS IN PILLAR SHAPE OF CAPSULE WITH CURTAIN AND BRONJONG INSTALLATION (Experiment). Tugas Akhir thesis, University Technology Yogyakarta.

Prakoso, Aditiyas and Asyifa, Adwiyah (2021) STABILISASI TANAH LEMPUNG EKSPANSIF MENGGUNAKAN 8% LIMBAH MARMER DAN 11%, 13%, 15% LIMBAH CANGKANG KERANG EXPANSIVE CLAY SOIL STABILIZATION USING 8% MARBLE WASTE AND 11%, 13%, 15% WASTE OF SHELLS. Tugas Akhir thesis, University of Technology Yogyakarta.

Pramudya, Raynaldo Dhimas Renggo and Setiawan, Danny (2021) ANALISIS LAIK FUNGSI TEKNIS JALAN PADA RUAS RUAS JALAN PIYUNGAN – PRAMBANAN KM 7 S/D KM 9 TECHNICAL ROAD WORTHINESS ANALYSIS ON THE PIYUNGAN – PRAMBANAN ROAD SEGMENTS KM 7 TO KM 9. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetiyo, Andy and Septi Hendrasari, Ratna (2021) ANALISIS POLA TATA TANAM PADA DAERAH IRIGASI BORO KABUPATEN PURWOREJO ANALYSIS OF PLANTING PATTERNS IN BORO IRRIGATION AREA, PURWOREJO DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetya Marsudi, Duta and Asyifa, Adwiyah (2021) ANALISIS KUALITAS AIR PADA SUMBER MATA AIR DI ALIRAN SUNGAI OPAK (Studi Kasus: Ds. Wukirsari, Cangkringan Sampai Brintikan, Tirtomartani, Kalasan, DAS Opak) ANALYSIS OF WATER QUALITY IN THE SOURCE OF WATER IN THE OPAK RIVER (Case Study: Ds. Wukirsari, Cangkringan to Brintikan, Tirtomartani, Kalasan, DAS Opak). Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Adi and Budianto, Johan (2021) EVALUASI KINERJA BANGUNAN GEDUNG FAKULTAS KEDOKTERAN UNIVERSITAS SWADAYA GUNUNG JATI DENGAN ANALISIS PUSHOVER MENGGUNAKAN PROGRAM SAP2000 PERFORMANCE EVALUATION OF BUILDING FACULTY OF MEDICINE UNIVERSITY OF GUNUNG JATI WITH PUSHOVER ANALYSIS USING SAP2000 PROGRAM. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Anggi and Melyadi Putri, Nanda (2021) ANALISIS STABILITAS LERENG BENDUNGAN SERMO KABUPATEN KULON PROGO SLOPE STABILITY ANALYSIS OF THE SERMO DAM, KULON PROGO DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Bayu and Masagala, Algazt Aryad (2021) ANALISIS KUAT TEKAN INTERLOCK BRICK DENGAN BUBUK CANGKANG TELUR 10% SEBAGAI BAHAN SUBSTITUSI SEMEN DAN BATU APUNG 28%;31%;34% SEBAGAI BAHAN SUBSTITUSI AGREGAT KASAR ANALYSIS OF COMPRESSIVE STRENGTH OF INTERLOCK BRICK WITH 10% EGG SHELL POWDER AS CEMENT AND PUUM STONE SUBSTITUTION MATERIAL 28%;31%;34% AS COARD AGGREGATE SUBSTITUTION MATERIAL. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Eko and Setiawan, Danny (2021) PENILAIAN KONDISI JEMBATAN RANGKA BAJA MENGGUNAKAN BRIDGE MANAGEMENT SYSTEM (BMS) DI KAB. PURWOREJO ASSESSMENT OF THE CONDITION OF STEEL FRAME BRIDGE USING BRIDGE MANAGEMENT SYSTEM (BMS) IN KAB. PURWOREJO. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Sigit Jati and Putri, Nanda Melyadi (2021) ANALISIS KEBUTUHAN AIR BERSIH PADA SUMBER MATA AIR MUDAL DESA HARGOREJO KABUPATEN KULON PROGO CLEAN WATER NEED ANALYSIS ON THE SOURCE OF MUDAL WATER HARGOREJO VILLAGE, KULON PROGO REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Subuh Eko and Asyifa, Adwiyah (2021) REDESAIN FONDASI TIANG PANCANG KE FONDASI BORE PILE (Studi Kasus Pembangunan Hotel The Manohara Yogyakarta) PILE FOUNDATION DESIGN TO BORE PILE FOUNDATION (Case Study of The Manohara Hotel Yogyakarta Development). Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo, Vicki Adi and Nurhidayatullah, Eka Faisal (2021) KERENTANAN BANGUNAN AKIBAT GEMPA BERDASARKAN PUSHOVER ANALYSIS DAN METODE HAZUS MH VULNERABILITY OF BUILDING DUE TO EARTHQUAKE BASED ON PUSHOVER ANALYSIS AND HAZUS MH METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Prasetyo Wibowo, Dedy and Budianto, Johan (2021) REDESAIN STRUKTUR ATAS BETON BERTULANG BERDASARKAN SNI 1726:2012 MENGGUNAKAN PETA GEMPA 2017 Studi Kasus: Gedung Tower B Apartemen Tamansari Cendekia 20 Lantai REDESIGN OF THE STRUCTURE OF REINFORCED CONCRETE BASED ON SNI 1726: 2012 USING MAP 2017 EARTHQUAKE Case Study: Tower B Building of the Tamansari Cendekia Apartment20 Floor. Tugas Akhir thesis, University of Technology Yogyakarta.

Pratama, Andi Moh. Elfanno Risman and Asyifa, Adwiyah (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH DI WILAYAH KECAMATAN WONOMULYO KABUPATEN POLEWALI MANDAR ANALYSIS OF CLEAN WATER NEEDS AND AVAILABILITY IN THE REGION OF WONOMULYO DISTRICT, POLEWALI MANDAR REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Pratama Asdar, Saputra and Aryad Masagala, Algazt (2021) TINGKAT PENGARUH CAMPURAN LIMBAH TEMPURUNG KELAPA TERHADAP KUAT TEKAN BETON RINGAN TEPAT RANCANG 20 MPA DENGAN PERSENTASE 75%, 80%, DAN 85% THE EFFECT LEVEL OF COCONUT WASTE MIXING ON THE STRENGTH OF LIGHTWEIGHT DESIGN CONCRETE 20 MPA WITH A PERCENTAGE OF 75%, 80%, AND 85%. Tugas Akhir thesis, University of Technology Yogyakarta.

Prayoga, Dede Ikhsan and Susilo, Dibyo (2021) ANALISIS KETERLAMBATAN DAN KUALITAS HASIL PEKERJAAN PADA PROYEK KONSTRUKSI ANALYSIS OF DELAYS AND QUALITY OF WORK RESULTS ON CONSTRUCTION PROJECTS. Tugas Akhir thesis, University Technology Yogyakarta.

Priatama, Kresna Bayu and Nuraini, Rika (2021) ANALISIS STABILITAS TANAH LEMPUNG MENGGUNAKAN LIMBAH ABU AMPAS TEBU DAN ABU DAUN BAMBU ANALYSIS OF CLAY STABILITY USING BAGASSE ASH AND BAMBOO LEAF ASH. Tugas Akhir thesis, University Technology Yogyakarta.

Priatna, Alfri Putra and Kurniati, Dwi (2021) ANALISIS PERBANDINGAN STRUKTUR PELAT CENDAWAN DENGAN PENEBALAN PELAT DAN KEPALA KOLOM PADA GEDUNG INSPEKTORAT YOGYAKARTA COMPARISONAL ANALYSIS OF THE STRUCTURE OF THE FULFIL PLATE WITH THE THICKNESS OF THE Slabs and Column Heads in the YOGYAKARTA INSPECTORATE BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Pribadi, Galih Bagas and Putri, Nanda Melyadi (2021) ANALISIS STABILITAS DAN EFEKTIVITAS SABO DAM PA C-SROWOL, SUNGAI PABELAN, KABUPATEN MAGELANG STABILITY AND EFFECTIVENESS ANALYSIS OF SABO DAM PA C-SROWOL, PABELAN RIVER, MAGELANG REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Prihambogo1, Yoga and Budianto, Johan (2021) EVALUASI LEVEL KINERJA STRUKTUR GEDUNG TERHADAP GEMPA DENGAN MENGGUNAKAN PUSHOVER ANALYSIS EVALUATION OF BUILDING STRUCTURE PERFORMANCE LEVEL AGAINST EARTHQUAKE USING PUSHOVER ANALYSIS. Tugas Akhir thesis, University Technology Yogyakarta.

Purnomo, Alika Andi and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN PRODUKTIVITAS PADA PEKERJAAN KOLOM DAN BALOK BERDASARKAN PERMEN PUPR 28-2016 DAN LAPANGAN Studi Kasus : Proyek Renovasi Pembangunan Masjid FMIPA UGM COMPARATIVE ANALYSIS OF PRODUCTIVITY ON COLUMN AND BEAM WORK BASED ON PUPR Ministerial Decree 28-2016 AND FIELD METHOD Case Study : Renovation Project for Mosque Construction of FMIPA UGM Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Purnomo, Eko and Utomo, Puji (2021) PEMODELAN SPASIAL BENCANA KEKERINGAN DENGAN MENGGUNAKAN STANDARDIZED PRECIPITATION INDEX (SPI) DI KABUPATEN BANTUL DROUGHT DISASTER SPATIAL MODELING USING THE STANDARDIZED PRECIPITATION INDEX (SPI) IN BANTUL REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Purnomo, Sigit and Kurniati, Dwi (2021) ANALISIS PERKUATAN GEDUNG MENGGUNAKAN BRACING TIPE-X PADA GEDUNG STUDENT CENTER UNIVERSITAS ATMA JAYA YOGYAKARTA STRENGTHENING ANALYSIS OF BUILDING USING TYPE-X BRACING AT THE STUDENT CENTER BUILDING OF ATMA JAYA UNIVERSITY YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Purnomojati, Aldino and Kurniati, Dwi (2021) REDESIGN GEDUNG RUMAH SAKIT GIGI DAN MULUT UGM Prof. Soedomo DENGAN MENGGUNAKAN METODE FLAT SLAB REDESIGNING Prof.SOEDOMO BUILDING USING FLAT SLAB METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Purwanto, Hari and Nuraini, Rika (2021) EFISIENSI LUBANG RESAPAN BIOPORI (LRB) PADA BEBERAPA TANAH Studi Kasus : Komplek Perumahan Sleman, Perumahan Glagahsari, Perumahan Piyungan EFFICIENCY OF BIOPORY INFILTRATION HOLES (LRB) ON SOME SOILS Case Study : Sleman Housing Complex, Glagahsari Housing, Piyungan Housing. Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Okta Dwicahya and Saputro, Cahyo Dita (2021) OPTIMASI SITE LAYOUT MENGGUNAKAN MULTI OBJECTIVES FUNCTION Studi Kasus : Proyek Pembangunan Laboratorium Riset Alam Sutera Indonesia, Bogor, Jawa Barat OPTIMIZATION OF SITE LAYOUT USING MULTI OBJECTIVE FUNCTION Case Study: Natural Silk Research Laboratory Development Project Indonesia, Bogor, West Java. Tugas Akhir thesis, University Technology Yogyakarta.

Putra, Rizky Rio Firmansyah and Budianto, Johan (2021) PERANCANGAN ULANG GEDUNG RUMAH SAKIT JIH PURWOKERTO DENGAN MENGGUNAKAN SNI 1726:2019 DAN SNI 2847:2019 REDESIGN OF JIH PURWOKERTO HOSPITAL BUILDING USING SNI 1726:2019 AND SNI 2847:2019. Tugas Akhir thesis, University Technology Yogyakarta.

Putri, Rizky Arianti and Ismaili, Abul Fida (2021) EVALUASI KINERJA PELAYANAN BANDARA INTERNASIONAL JAWA BARAT BERDASARKAN PRESEPSI PENUMPANG DENGAN MENGGUNAKAN METODE STRUCTURAL EQUATION MODELLING (SEM) EVALUATION OF WEST JAVA INTERNATIONAL AIRPORT SERVICE PERFORMANCE BASED ON PASSENGER PERCEPTION USING STRUCTURAL EQUATION MODELING (SEM) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Putri Nurdiyanti, Aliva and Fida Ismaili, Abul (2021) ANALISIS KAPASITAS DAN KEBUTUHAN PARKIR BANDARA (Studi Kasus Bandara Yogyakarta International Airport) ANALYSIS OF AIRPORT PARKING CAPACITY AND NEEDS (Yogyakarta International Airport Case Study). Tugas Akhir thesis, University Technology Yogyakarta.

Raharjo, Puji and Utomo, Puji (2021) ANALISIS PENGARUH SEDIMENTASI TERHADAP EFISIENSI PEREDAMAN BANJIR DI WADUK SEMPOR THE EFFECT OF SEDIMENTATION ON THE EFFICIENCY OF FLOOD REDUCTION IN SEMPOR RESERVOIR. Tugas Akhir thesis, University Technology Yogyakarta.

Raharjo, Slamet and Fida Ismaili, Abul (2021) PENGARUH PENAMBAHAN POLIMER PP DENGAN KADAR 5%, 10%, DAN 15% PADA CAMPURAN ASPAL AC-WC TERHADAP KARAKTERISTIK MARSHALL THE EFFECT OF ADDITIONAL POLYMER PP WITH A CONTENT OF 5%, 10%, AND 15% IN AC-WC Asphalt Mixture ON MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University Technology Yogyakarta.

Rahayu, Igun and Nurhidayatullah, Eka Faisal (2021) REDESAIN GEDUNG BRI CABANG ADISUCIPTO YOGYAKARTA MENGGUNAKAN STRUKTUR RANGKA BAJA REDESIGN OF THE ADISUCIPTO YOGYAKARTA BRANCH BRI BUILDING USING STEEL FRAME STRUCTURE. Tugas Akhir thesis, University Technology Yogyakarta.

Rahayuningsih, Lailatul and Putri, Nanda Melyadi (2021) PERINGATAN DINI BANJIR LAHAR DINGIN GUNUNG MERAPI Studi Kasus: Pos Pengamatan Babadan Kabupaten Magelang EARLY WARNING FOR MOUNT MERAPI COLD LAVAFLOOD Case Study: Babadan Observation Post, Magelang Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Rahmadani, Enrico Daniel and Kurniati, Dwi (2021) ANALISIS PERKUATAN STRUKTUR MENGGUNAKAN BRACING KONSENTRIK TIPE-V PADA GEDUNG STUDENT CENTER UNIVERSITAS ATMA JAYA YOGYAKARTA STRUCTURAL REINFORCEMENT ANALYSIS USING TYPE-V CONCENTRIC BRACING AT STUDENT CENTER BUILDING, ATMA JAYA UNIVERSITY YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Rahman, Uray Ridho Ichsanul and Kurniati, Dwi (2021) PEMANFAATAN LIMBAH BATU BARA SEBAGAI SUBSTITUSI PASIR DENGAN PERSENTASE 30%, 60%, DAN 90% PADA BATAKO UTILIZATION OF WASTE COAL AS A SAND SUBSTITUTE WITH A PERCENTAGE OF 30%, 60%, AND 90% IN BATAKO. Tugas Akhir thesis, University Technology Yogyakarta.

Rahmatuloh, Adi and Utomo, Puji (2021) ANALISIS LAJU EROSI DAN SEDIMENTASI PADA DAS BENDUNG PAJENGKOLAN ANALYSIS OF EROSION AND SEDIMENTATION RATE AT THE PAJENGKOLAN DAM WATERSHED. Tugas Akhir thesis, University Technology Yogyakarta.

Rahmiaty, Aulia Vemil and Ismaili, Abul Fida (2021) INVESTIGASI FORENSIK PERKERASAN LENTUR PADA JALAN BATANGHARI II-ZONA LIMA (SP.PEL) PROVINSI JAMBI FORENSIC INVESTIGATION OF FLEXIBLE PAVEMENT ON ROAD BATANGHARI II-ZONE FIVE (SP.PEL) JAMBI PROVINCE. Tugas Akhir thesis, University Technology Yogyakarta.

Rama, Hanif Farhan Setya and Bhaskara, Adwitya (2021) ANALISIS RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN DENGAN METODE FMEA DAN HAZOP (Studi Kasus: Proyek Rehabilitasi Bangunan Pasar Johar Selatan, Semarang) WORK ACCIDENT RISK ANALYSIS AT DEVELOPMENT PROJECTS WITH FMEA AND HAZOP METHODS (Case Study: South Johar Market Building Rehabilitation Project, Semarang). Tugas Akhir thesis, University Technology Yogyakarta.

Ramadhan, Fandy Riki and Kurniati, Dwi (2021) ANALISIS PERMODELAN GEDUNG RESEARCH INNOVATION CENTER UMY MENGGUNAKAN KOLOM CIRCULAR CONCRETE FILLED STEEL TUBE MODELING ANALYSIS OF THE UMY RESEARCH INNOVATION CENTER BUILDING USING CIRCULAR CONCRETE FILLED STEEL TUBE COLUMN. Tugas Akhir thesis, University Technology Yogyakarta.

Randy Vitoryan, Muhamad and Dita Saputro, Cahyo (2021) ANALISIS RISIKO KESELAMATAN KERJA DALAM PENGGUNAAN PASSENGER HOSIT DENGAN METODE ANALITYCAL HIERARCHY PROCESS (AHP) (Studi Kasus Proyek Pembangunan Hotel Dhika Universe) SAFETY RISK ANALYSIS IN USING PASSENGER HOSIT WITH ANALITYCAL HIERARCHY PROCESS (AHP) METHOD (Case Study of the Dhika Universe Hotel Development Project). Tugas Akhir thesis, University of Technology Yogyakarta.

Rediyatno, Apram and Dita Saputro, Cahyo (2021) ANALISIS PRODUKTIVITAS PEKERJA PADA PEKERJAAN DINDING DENGAN METODE TIME STUDY (STUDI KASUS : PROYEK PEMBANGUNAN GEDUNG TILC UNIVERSITAS GADJAH MADA) ANALYSIS OF WORKER PRODUCTIVITY IN WALL WORK WITH TIME STUDY METHOD (CASE STUDY: TILC BUILDING DEVELOPMENT PROJECT, GADJAH MADA UNIVERSITY). Tugas Akhir thesis, University Technology Yogyakarta.

Rehing, Yacobus Heran and Masagala, Algazt Aryad (2021) ANALISIS KUAT TEKAN BETON DENGAN BONE-MEAL 10% SUBSTITUSI SEMEN DAN PUMICE 25%;30%;35% SUBSTITUSI AGREGAT KASAR ANALYSIS OF CONCRETE COMPRESSIVE STRENGTH WITH 10% BONE-MEAL SUBSTITUTION OF CEMENT AND PUMICE 25%;30%;35% COARD AGGREGATE SUBSTITUTION. Tugas Akhir thesis, University Technology Yogyakarta.

Riski, Ikhlas and Hendrasari, Ratna Septi (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH WILAYAH PELAYANAN PDAM TIRTA SEJUK KABUPATEN GAYO LUES ANALYSIS OF CLEAN WATER NEEDS AND AVAILABILITY AREA OF PDAM TIRTA SEJUK SERVICES, GAYO LUES REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Riski Kurniawan, Riyan and Bhaskara, Adwitya (2021) ANALISIS IBPRP DAN JSA BERDASARKAN PERMEN PUPR NO. 21 TAHUN 2019 Studi Kasus : Pekerjaan Struktur Fondasi Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jendral Soedirman Purwokerto IBPRP AND JSA ANALYSIS BASED ON MINISTRY REGULATION PUPR NO. 21 YEAR 2019 Case Study: Work of Foundation Structures in the Learning Service Building Project of the Faculty of Social and Political Sciences, Jendral Soedirman Purwokerto University. Tugas Akhir thesis, University Technology Yogyakarta.

Rizaldi, Dedy and Asyifa, Adwiyah (2021) NILAI KUAT GESER TEKAN BEBAS PADA TANAH LEMPUNG AKIBAT PENAMBAHAN LIMBAH PLASTIK DAN LIMBAH GIPSUM (Studi Kasus Desa Banjarharjo, Kab. Kulon Progo) VALUE OF FREE COMPRESSIVE SHEARING ON CLAY SOIL DUE TO ADDITIONAL PLASTIC WASTE AND gypsum waste (Case Study in Banjarharjo Village, Kulon Progo Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Rizaldi, La Ode Muh. Reza Pahlasi and Budianto, Johan (2021) RE-DESAIN BANGUNAN TEKNIK SIPIL DENGAN METODE BUILDING INFORMATION MODELING (BIM) Studi Kasus Bangunan Gedung Fakutas Tekik Universitas Tidar Magelang RE-DESIGN OF CIVIL ENGINEERING BUILDING WITH BUILDING INFORMATION MODELING (BIM) METHOD Case Study of Tekik Faculty of Engineering, Tidar University, Magelang. Tugas Akhir thesis, University Technology Yogyakarta.

Rizqhi, Ahkmad and Bhaskara, Adwitya (2021) OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE LEAST COST ANALYSIS Studi Kasus Proyek Rehabilitasi Pasar Prawirotaman, Yogyakarta COST AND TIME OPTIMIZATION OF PROJECT USING LEAST COST ANALYSIS METHOD Case Study of Prawirotaman Market Rehabilitation Project, Yogyakarta. Tugas Akhir thesis, University Technology Yogyakarta.

Robani, Wahyu and Budianto, Johan (2021) PENGUJIAN KUAT LENTUR KAYU BALOK LAMINASI SENGON DAN MAHONI TESTING THE FLEXURAL STRENGTH OF SENGON AND MAHOGANY LAMINATED BEAMS. Tugas Akhir thesis, University Technology Yogyakarta.

Robbani, Faizal Jundi and Nurhidayatullah, Eka Faisal (2021) ANALISIS BANGUNAN BERTINGKAT DENGAN PERBANDINGAN SNI 1726-2012 DAN SNI 1726-2019 (Studi Kasus: Bangunan Gedung STIKES Madani Yogyakarta) COMPARATIVE ANALYSIS OF STORE BUILDING USING SNI 1726-2012 AND SNI 1726-2019 (Case Study: STIKES Madani Yogyakarta Building). Tugas Akhir thesis, University Technology Yogyakarta.

Rosyada, Amrina and Setiawan, Danny (2021) ANALISIS DAMPAK LALU LINTAS (ANDALALIN) DI KAWASAN PABRIK PT. HWASEUNG INDONESIA JEPARA TRAFFIC IMPACT ANALYSIS IN THE FACTORY AREA OF PT. HWASEUNG INDONESIA JEPARA. Tugas Akhir thesis, University Technology Yogyakarta.

Roziqi, Afi Maulana and Putri, Nanda Melyadi (2021) ANALISIS FUNGSI BANGUNAN PENGENDALI SEDIMEN (Studi Kasus: Sabo Dam PA-C5 Kojor, Sungai Pabelan, Kabupaten Magelang) FUNCTION ANALYSIS OF SEDIMENT CONTROL BUILDING (Case Study: Sabo Dam PA-C5 Kojor, Pabelan River, Magelang Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Ruhimat, Nizar and Dita Saputro, Cahyo (2021) PENGARUH PENJADWALAN TERHADAP SUMBER DAYA TENAGA KERJA KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus: Proyek Pembangunan Gedung Rumah Sakit PKU STIKES Muhammadiyah Kabupaten Klaten) EFFECTS OF SCHEDULING USING MICROSOFT PROJECT FOR CONSTRUCTION WORKER RESOURCES (Case Study: The Development Project of the Hospital of STIKES PKU Muhammadiyah in Klaten Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Sagala, Lidya Daryati Angeli and Asyifa, Adwiyah (2021) HUBUNGAN PARAMETER KUAT GESER DAN TEKAN BEBAS TANAH LEMPUNG VARIASI PENAMBAHAN LIMBAH GYPSUM DAN LIMBAH PLASTIK Studi Kasus Desa Banjarharjo, Kecamatan Kalibawang, Kabupaten Kulon Progo, Jawa Tengah PARAMETER RELATIONSHIP OF SHEAR STRENGTH AND COMPRESSIVE FREE OF CLAY SOIL VARIATION OF ADDITION OF GYPSUM WASTE AND PLASTIC WASTE Case Study Of Banjarharjo Village, Kalibawang District, Kulon Progo Regency, Central Java. Tugas Akhir thesis, University Technology Yogyakarta.

Sagina, Muhammad and Asyifa, Adwiyah (2021) STUDI OPTIMASI POLA PENGOPERASIAN WADUK MALAHAYU DI KABUPATEN BREBES UNTUK KEBUTUHAN IRIGASI STUDY ON OPTIMIZATION OF THE OPERATING PATTERN OF MALAHAYU CONTROL IN BREBES DISTRICT FOR IRRIGATION NEEDS. Tugas Akhir thesis, University of Technology Yogyakarta.

Saibatul Hamdi, Muhammad and Asyifa, Adwiyah (2021) ANALISIS POTENSI SUMBER MATA AIR PADA ALIRAN SUNGAI OPAK (Studi Kasus: Ds. Wukirsari, Cangkringan Sampai Brintikan, Tirtomartani, Kalasan, DAS Opak) ANALYSIS OF POTENTIAL SOURCES OF WATER SPRING IN OPAK RIVER FLOW (Case Study: Ds. Wukirsari, Cangkringan to Brintikan, Tirtomartani, Kalasan, Opak Watershed. Tugas Akhir thesis, University Technology Yogyakarta.

Salam, Fadli and Ismaili, Abul Fida (2021) ANALISIS DURASI DAN KEBUTUHAN PARKIR PADA BADAN JALAN KALIURANG DAN JALAN GEJAYAN DI KABUPATEN SLEMAN PARKING DURATION AND NEED ANALYSIS ON THE ROAD OF KALIURANG AND GEJAYAN STREET IN SLEMAN DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Salsabila Anggriyanto, Ahimsa and Bhaskara, Adwitya (2021) EVALUASI RISIKO PRODUKTIVITAS ALAT TERHADAP PEKERJAAN PENGECORAN DENGAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) Studi Kasus Proyek Pembangunan Rumah Susun Aparatur Sipil Negara (ASN) Balai Besar Wilayah Sungai (BBWS) Serayu Opak RISK EVALUATION OF TOOL PRODUCTIVITY TOWARD CASTING WORK USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD Case Study of the Project for the Construction of the State Civil Apparatus Flats (ASN) Serayu Opak River Basin. Tugas Akhir thesis, University of Technology Yogyakarta.

Samudro, Bagas Karang and Masagala, Algazt Aryad (2021) PEMANFAATAN SERBUK MARMER SEBAGAI CAMPURAN AGREGAT HALUS DENGAN PERSENTASE 20%, 25%, 30% DAN POTONGAN KAWAT BENDRAT 5% SEBAGAI BAHAN TAMBAH PAVING BLOCK UTILIZATION OF MARBLE POWDER AS A MIXTURE OF FINE AGGREGATE WITH A PERCENTAGE OF 20%, 25%, 30% AND 5% WIRE BENDRATS AS ADDITIONAL MATERIALS OF PAVING BLOCK. Tugas Akhir thesis, University Technology Yogyakarta.

Santoso, Arif Budi and Setiawan, Danny (2021) MIKROSIMULASI SIMPANG BERSINYAL MENGGUNAKAN PRANGKAT LUNAK PTV VISSIM V.21 (Studi Kasus: Simpang Armada Town Square Magelang) MICROSIMULATION OF SIGNALIZED INTERSECTIONS USING VISSIM V21 PTV SOFTWARE (Case Study: Simpang Armada Town Square Magelang). Tugas Akhir thesis, University Technology Yogyakarta.

Sapteno, Jean Eunike and Setiawan, Danny (2021) ANALISIS DAMPAK LALU LINTAS AKIBAT ADANYA PUSAT PERBELANJAAN DI KAWASAN PASAR BARU LABUHA KEC, BACAN TIMUR, MALUKU UTARA TRAFFIC IMPACT ANALYSIS DUE TO A SHOPPING CENTER IN MARKET NEW AREA, LABUHA KEC, BACAN TIMUR, NORTH MALUKU. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Aan Nugroho and Susilo, Dibyo (2021) ANALISIS MODEL HUBUNGAN VOLUME, KECEPATAN DAN KEPADATAN LALULINTAS ANALYSIS OF RELATIONSHIP MODEL VOLUME, SPEED AND TRAFFIC DENSITY. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Andika Tri and Bhaskara, Adwitya (2021) ANALISIS PERBANDINGAN METODE KONVENSIONAL FLOOR TO FLOOR DAN METODE SEMI-SISTEM CLIMBING Studi Kasus Pekerjaan Shearwall pada Proyek Pembangunan Apartement Barsa City Yogyakarta COMPARISON ANALYSIS OF CONVENTIONAL FLOOR TO FLOOR AND SEMI-CLIMBING METHODS Case Study of Shearwall's Work on the Yogyakarta Barsa City Apartment Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Muhammad Dimas Yoga and Kurniati, Dwi (2021) PENGARUH SUBSTITUSI LIMBAH ABU SEKAM PADI TERHADAP PAVING BLOCK DENGAN PRESENTASE 2,5%, 5%, 7,5% EFFECT OF RICE HUSK ASH WASTE SUBSTITUTION ON PAVING BLOCK WITH PRESENTATION OF 2.5%, 5%, 7.5%. Tugas Akhir thesis, University Technology Yogyakarta.

Saputra, Yusuf and Utomo, Puji (2021) ANALISIS POTENSI BANYAKNYA AIR YANG DIHASILKAN OLEH ALAT PEMANEN KABUT (FOG HARVESTING) SEBAGAI ALTERNATIF SUMBER DAYA AIR TERBARUKAN DI WONOSOBO Studi Kasus : Dusun Garung, Desa Butuh, Kecamatan Kalikajar, Kabupaten Wonosobo POTENTIAL ANALYSIS OF WATER PRODUCED BY FOG HARVESTING AS ALTERNATIVE RENEWABLE WATER RESOURCES IN WONOSOBO Case Study : Garung Hamlet, Need Village, Kalikajar District, Wonosobo Regency. Tugas Akhir thesis, University Technology Yogyakarta.

Sari, Dewi Retno and Setiawan, Danny (2021) ANALISIS TUNDAAN DAN ANTRIAN AKIBAT PERLINTASAN SEBIDANG JALAN DENGAN REL KERETA API TANJUNG ANALYSIS OF DELAYS AND QUEUES DUE TO TANJUNG RAILROAD LEVEL CROSSING. Tugas Akhir thesis, University Technology Yogyakarta.

Sarinastiti, Roshida and Kurniati, Dwi (2021) REDESAIN GEDUNG KANTOR PT. TATSUMI SERUNI INDONESIA - GRESIK MENGGUNAKAN METODE FLAT SLAB & PENAMBAHAN KEPALA KOLOM REDESIGN OF OFFICE BUILDING PT. TATSUMI SERUNI INDONESIA - GRESIK USING FLAT SLAB METHOD & ADDITIONAL COLUMN HEADS. Tugas Akhir thesis, University Technology Yogyakarta.

Sephin, Ogha Armelio and Nurhidayatullah, Eka Faisal (2021) REDESAIN DAN PERBANDINGAN SISTEM RANGKA BAJA PEMIKUL MOMEN KHUSUS DENGAN SISTEM GANDA BRESING KONSENTRIS (Studi Kasus : Gedung Kewirausahaan UNY Kampus Wates) REDESIGN AND COMPARISON BETWEEN SPECIAL BEARING STEEL FRAME SYSTEM AND CONCENTRIC DOUBLE BRACING SYSTEM (Case Study: UNY Entrepreneurship Building Wates Campus). Tugas Akhir thesis, University Technology Yogyakarta.

Septanto, Guntur Aji and Susilo, Dibyo (2021) EVALUASI TARIF BUS DAMRI BERDASARKAN BIAYA OPERASIONAL KENDARAAN (BOK), ABILITY TO PAY (ATP) DAN WILLINGNESS TO PAY (WTP) PENGGUNA JASA BUS RUTE BANTUL – BANDARA YIA YOGYAKARTA EVALUATION OF DAMRI BUS RATE BASED ON VEHICLE OPERATION COST (BOK), ABILITY TO PAY (ATP) AND WILLINGNESS TO PAY (WTP) BUS SERVICE USERS ROUTE BANTUL – YIA AIRPORT YOGYAKARTA. Tugas Akhir thesis, University Technology Yogyakarta.

Septeama, Hafida Valen and Ismaili, Abul Fida (2021) ANALISIS KAPASITAS DAN KEBUTUHAN PARKIR PADA BADAN JALAN DI KOTA PURWOKERTO (Studi Kasus Jalan Moch. Safei, Jalan Jend. Suprapto, Jalan Brigjen Katamso, dan Jalan Prof. Dr. HR Boenyamin) ANALYSIS OF PARKING CAPACITY AND NEEDS ON ROAD AGENCY IN PURWOKERTO CITY (Case Study on Moch. Safei Street, Jend. Suprapto Street, Brigjen Katamso Street, and Prof. Dr. HR Boenyamin Street). Tugas Akhir thesis, University Technology Yogyakarta.

Septia Eka Drajati, Chatarine and Utomo, Puji (2021) PEMETAAN KAWASAN RAWAN BANJIR DI KABUPATEN BANTUL MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS MAPPING OF FLOOD-PRONE AREAS IN BANTUL DISTRICT USING A GEOGRAPHIC INFORMATION SYSTEM. Tugas Akhir thesis, University of Technology Yogyakarta.

Septiyanti, Vidzia and Putri, Nanda Melyadi (2021) ANALISIS PENGARUH CURAH HUJAN TERHADAP KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH DI KECAMATAN WONOSEGORO KABUPATEN BOYOLALI ANALYSIS OF THE EFFECT OF RAINFALL ON THE NEED AND AVAILABILITY OF CLEAN WATER IN WONOSEGORO DISTRICT, BOYOLALI REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Setiabudi, Feri and Bhaskara, Adwitya (2021) ANALISIS JSA DAN IBPRP BERDASARKAN PERMEN PUPR No.21 TAHUN 2019 Studi Kasus: Pekerjaan Struktur Balok Pada Proyek Pembangunan Gedung Layanan Pembelajaran Fakultas ISIP Universitas Jenderal Soedirman ANALYSIS OF JSA AND IBPRP BASED ON REGULATION OF THE MINISTER OF PUPR No.21 of 2019 Case Study: Block Structure Work in the Learning Service Building Project of the Faculty of ISIP, Jenderal Soedirman University. Tugas Akhir thesis, University of Technology Yogyakarta.

Setiawan, Vajar Puji and Nuraini, Rika (2021) STUDI EKSPERIMENTAL DENGAN BAHAN TAMBAH GARAM DAPUR DAN SERBUK KACA PADA STABILISASI TANAH LEMPUNG EXPERIMENTAL STUDY WITH ADDITIONAL TABLE SALT AND GLASS POWDER ON CLAY STABILIZATION. Tugas Akhir thesis, University Technology Yogyakarta.

Setyardi. H, Chandra and Kurniati, Dwi (2021) EVALUASI SISTEM PROTEKSI KEBAKARAN PADA BANGUNAN KAMPUS DITINJAU DARI SISTEM PROTEKSI AKTIF GEDUNG MARGONO SURADJI EVALUATION OF FIRE PROTECTION SYSTEM ON VIEWING CAMPUS BUILDING FROM THE ACTIVE PROTECTION SYSTEM OF THE MARGONO SURADJI BUILDING. Tugas Akhir thesis, University Technology Yogyakarta.

Sidiq, Ardi and Budianto, Johan (2021) MODIFIKASI PERENCANAAN GEDUNG PELAYANAN DAN AREA PARKIR BBTKLPP YOGYAKARTA MENGGUNAKAN METODE FLAT SLAB DAN SHEARWALL PLANNING MODIFICATIONS OF SERVICE BUILDING AND PARKING AREA BBTKLPP YOGYAKARTA USING FLAT SLAB AND SHEARWALL METHODS. Tugas Akhir thesis, University Technology Yogyakarta.

Sinthia, Monica and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN RISIKO KESELAMATAN KERJA DENGAN MENGGUNAKAN METODE SEVERITY INDEX (Studi Kasus : Proyek Pembangunan Apartemen Barsa City) ANALYSIS OF OCCUPATIONAL SAFETY RISK MANAGEMENT USING SEVERITY INDEX METHOD (Case Study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Sri Lestari, Ayu and Fida Ismaili, Abul (2021) REKAYASA LALU LINTAS AKIBAT PENUTUPAN JALAN KAWASAN MALIOBORO Studi Kasus: Kinerja Simpang Bersinyal Kawasan Malioboro TRAFFIC ENGINEERING DUE TO ROAD CLOSING IN MALIOBORO AREA Case Study: Signalized Intersection Performance in Malioboro Area. Tugas Akhir thesis, University of Technology Yogyakarta.

Sukmaatmaja, Zahra and Utomo, Puji (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR BERSIH PDAM KRADENAN KABUPATEN GROBOGAN ANALYSIS OF CLEAN WATER NEEDS AND AVAILABILITY PDAM KRADENAN GROBOGAN DISTRICT. Tugas Akhir thesis, University Technology Yogyakarta.

Supri, - and Saputro, Cahyo Dita (2021) ANALISIS PENGARUH PEMBAGIAN ZONA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING (Studi Kasus: Proyek Pembangunan Gedung Rawat Jalan 4 Lantai Rumah Sakit Brayat Minulya) ANALYSIS OF THE EFFECT OF ZONE DIVISION ON COST AND TIME ON FORMS WORK (Case Study: 4-Story Outpatient Building Project at Brayat Minulya Hospital). Tugas Akhir thesis, University Technology Yogyakarta.

Supri, Supri and Saputro, Cahyo Dita (2021) ANALISIS PENGARUH PEMBAGIAN ZONA TERHADAP BIAYA DAN WAKTU PADA PEKERJAAN BEKISTING (Studi Kasus: Proyek Pembangunan Gedung Rawat Jalan 4 Lantai Rumah Sakit Brayat Minulya) ANALYSIS OF THE EFFECT OF ZONE DIVISION ON COST AND TIME ON FORMS WORK (Case Study: 4-Story Outpatient Building Project at Brayat Minulya Hospital). Tugas Akhir thesis, University Technology Yogyakarta.

Supriyadi, Adek and Fida Ismaili, Abul (2021) PERENCANAAN PONDASI SUBSTATION BUILDING WELLPAD CENTRAL AREA PADA PROYEK PENGEMBANGAN GAS LAPANGAN UNITISASI JAMBARAN-TIUNG BIRU DENGAN MEMPERHITUNGKAN PENGARUH LIKUIFAKSI PLANNING OF THE WELLPAD CENTRAL AREA SUBSTATION BUILDING IN JAMBARAN-TIUNG BIRU UNITIZATION FIELD GAS DEVELOPMENT PROJECT BY CALCULATING THE EFFECT OF LIQUEFACTION. Tugas Akhir thesis, University Technology Yogyakarta.

Suroso, Rizki Rhamadani and Setiawan, Danny (2021) PERENCANAAN GEOMETRIK DAN PERKERASAN JALAN PADA RUAS JALAN PATUK-TERONG KABUPATEN BANTUL GEOMETRIC PLANNING AND ROAD PAVING ON THE PATUK-TERONG ROAD SEGMENT, BANTUL REGENCY. Tugas Akhir thesis, University Technology Yogyakarta.

Susilo, Edi and Kurniati, Dwi (2021) DESAIN MODIFIKASI STRUKTUR RUMAH SAKIT UMUM DAERAH KAYEN KABUPATEN PATI MENGGUNAKAN METODE FLAT SLAB WITH DROP PANEL STRUCTURE MODIFICATION DESIGN OF PUBLIC HOSPITAL IN KAYEN AREA, PATI DISTRICT USING FLAT SLAB WITH DROP PANEL METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Tanrisau, Tanrisau and Kurniati, Dwi (2021) PENGARUH PEMANFAATAN COCOPEAT SEBAGAI SUBTITUSI PASIR TERHADAP PAVING BLOCK PERSENTASE 0,6%, 0,8%, 1% THE EFFECT OF COCOPEAT UTILIZATION AS SAND SUBSTITUTE ON PAVING BLOCK PERCENTAGE 0.6%, 0.8%, 1%. Tugas Akhir thesis, University Technology Yogyakarta.

Thaharah, Zakqi and Fida Ismaili, Abul (2021) PEMANFAATAN LIMBAH ARANG CANGKANG KELAPA SAWIT SEBAGAI FILLER DENGAN KADAR 2,25%, 2,5%, 2,75%, 3% DAN 3,25% PADA CAMPURAN STONE MATRIX ASPHALT 0/8 TERHADAP KARAKTERISTIKMARSHALL UTILIZATION OF PALM OIL CHARCOAL WASTE AS A FILLER WITH CONCITIONS OF 2.25%, 2.5%, 2.75%, 3% AND 3.25% IN STONE MATRIX ASPHALT 0/8 MIXING ON MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University of Technology Yogyakarta.

Timor, Wayan R Satria and Masagala, Algazt Aryad (2021) PEMANFAATAN SAMPAH PLASTIK SEBAGAI PENGGANTI SEMEN PADA PEMBUATAN PAVING BLOCK DENGAN PERSENTASE 50%, 45%, 40% UTILIZATION OF PLASTIC WASTE AS A REPLACEMENT OF CEMENT IN PAVING BLOCK MANUFACTURE WITH A PERCENTAGE OF 50%, 45%, 40%. Tugas Akhir thesis, University Technology Yogyakarta.

Tivan Indra Putra, Sepdiyan and Dita Saputra, Cahyo (2021) IMPLEMENTASI PENJADWALAN PROYEK DENGAN PENERAPAN BUILDING INFORMATION MODELLING Studi Kasus Proyek Pembangunan Masjid Fadhli Umar Yogyakarta IMPLEMENTATION OF PROJECT SCHEDULING USING BUILDING INFORMATION MODELING Case Study on Yogyakarta Fadhli Umar Mosque Development Project. Tugas Akhir thesis, University Technology Yogyakarta.

Tri Wibowo, Pamungkas and Susilo, Dibyo (2021) ANALISIS RUANG PARKIR PADA RUMAH SAKIT RSUD DR. TJITROWARDOJO PURWOREJO PARKING SPACE ANALYSIS IN REGIONAL PUBLIC HOSPITAL DR. TJITROWARDOJO PURWOREJO. Tugas Akhir thesis, University Technology Yogyakarta.

Triantika, Februanti and Kurniati, Dwi (2021) REDESIGN GEDUNG KANTOR PT. TATSUMI SERUNI INDONESIA-GRESIK DENGAN MENGGUNAKAN METODE FLAT SLAB-FLAT PLATE REDESIGNING OFFICE BUILDING PT. TATSUMI SERUNI INDONESIA-GRESIK USING THE FLAT SLAB-FLAT PLATE METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Trisnanto, Pandu and Setiawan, Danny (2021) EVALUASI KINERJA SIMPANG BERSINYAL DAN PENGATURAN LAMPU LALU LINTAS DENGAN SOFTWARE VISSIM (Studi Kasus: Simpang RSUD Kabupaten Wonogiri) PERFORMANCE EVALUATION OF SIGNING INTERCES AND TRAFFIC LIGHTS WITH VISSIM SOFTWARE (Case Study: Intersection of Wonogiri District Hospital). Tugas Akhir thesis, University Technology Yogyakarta.

Utami, Annisa Fitri and Asyifa, Adwiyah (2021) ANALISIS KEBUTUHAN DAN KETERSEDIAAN AIR IRGASI (Studi Kasus: Embung Tirto Agung Kecamatan Seyegan Kabupaten Sleman) ANALYSIS OF NEEDS AND AVAILABILITY OF IRIGATION WATER (Case Study: Embung Tirto Agung, Seyegan District, Sleman Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Utomo Prasetyo, Suryo and Utomo, Puji (2021) ANALISIS DEBIT BANJIR RANCANGAN DAN PEMODELAN KERUNTUHAN BENDUNGAN SERMO KABUPATEN KULON PROGO MENGGUNAKAN PROGRAM HEC-RAS 5.0.7 ANALYSIS OF DESIGN FLOOD DISCHARGE AND THE SERMO DAM COLLAPSE MODELING IN KULON PROGO DISTRICT USING HEC-RAS 5.0.7. Tugas Akhir thesis, University Technology Yogyakarta.

Victor Kaka, Soleman and Budianto Kromodiryo, Johan (2021) ANALISIS PERBANDINGAN STRUKTUR RANGKA PEMIKUL MOMEN KHUSUS DENGAN STRUKTUR RANGKA DINDING GESER KHUSUS BERDASARKAN SNI 1726:2019 DAN SNI 2843:2019 COMPARATIVE ANALYSIS OF SPECIFIC MOMENT BEARER FRAME STRUCTURE WITH SPECIAL SLID WALL FRAME STRUCTURE BASED ON SNI 1726: 2019 AND SNI 2843: 2019. Tugas Akhir thesis, University of Technology Yogyakarta.

Vilanata, Ashar and Ismaili, Abul Fida (2021) ANALISIS EFEK KADAR AIR 1%, 1,5% DAN 2% DALAM AGREGAT CAMPURAN LAPISAN ASPAL BETON AC-WC YANG DITINJAU DENGAN KARAKTERISTIK MARSHALL ANALYSIS OF THE EFFECTS OF 1%, 1.5% AND 2% WATER CONTENT IN MIXED AGGREGATE OF ASPHALT CONCRETE LAYER AC-WC REVIEWED WITH MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University Technology Yogyakarta.

Wahyuni, Sri and Nurhidayatullah, Eka Faisal (2021) REDESAIN STRUKTUR ATAS JEMBATAN AIR BELITI DESA DERATI KOTA PADANG MENGGUNAKAN RANGKA BAJA TIPE PRATT STRUCTURAL REDESIGN OF THE BELITI WATER BRIGE, DERATI VILLAGE, PADANG CITY USING A PRATT OF STEEL FRAME. Tugas Akhir thesis, University Technology Yogyakarta.

Wanandi, Titus Patrik and Bhaskara, Adwitya (2021) ANALISIS OPTIMALISASI PENJADWALAN PADA PROYEK DENGAN MICROSOFT PROJECT Studi Kasus Proyek Proyek Pembangunan Gedung Student Center Politeknik Negeri Indramayu SCHEDULING OPTIMIZATION ANALYSIS ON PROJECTS WITH MICROSOFT PROJECT Case Study of the Indramayu State Polytechnic Student Center Building Project Project. Tugas Akhir thesis, University Technology Yogyakarta.

Wardani, Jayani Kusuma and Bhaskara, Adwitya (2021) ANALISIS MANAJEMEN LIMBAH BAHAN MATERIAL KONSTRUKSI DENGAN KONSEP GREEN CONSTRUCTION (Studi Kasus: Proyek Pembangunan Apartemen Barsa City) CONSTRUCTION MATERIAL WASTE MANAGEMENT ANALYSIS WITH GREEN CONSTRUCTION CONCEPT (Case Study: Barsa City Apartment Development Project). Tugas Akhir thesis, University Technology Yogyakarta.

Wardani, Widya and Bhaskara, Adwitya (2021) ANALISIS EFISIENSI WAKTU DAN BIAYA BERDASARKAN KOMBINASI ALAT BERAT PADA PEKERJAAN STRUKTUR BAWAH Studi Kasus: Proyek Pembangunan Jalur Kereta Api New Yogyakarta International Airport TIME AND COST EFFICIENCY ANALYSIS BASED ON HEAVY EQUIPMENT COMBINATIONS ON LOWER STRUCTURE WORKS Case Study: New Yogyakarta International Airport Railroad Construction Project. Tugas Akhir thesis, University Technology Yogyakarta.

Waruwu, Alva Christof and Setiawan, Danny (2021) ANALISIS TINGKAT KESELAMATAN LALU LINTAS PADA FLYOVER MANAHAN SOLO DENGAN METODE TRAFFIC CONFLICT TECHNIQUE (TCT) TRAFFIC SAFETY LEVEL ANALYSIS ON THE MANAHAN SOLO FLYOVER USING TRAFFIC CONFLICT TECHNIQUE (TCT) METHOD. Tugas Akhir thesis, University Technology Yogyakarta.

Wibowo, Andi Luci and Nurhidayatullah, Eka Faisal (2021) REDESAIN GEDUNG PUSAT UNIVERSITAS SARJANAWIYATA TAMANSISWA MENGGUNAKAN SISTEM STRUKTUR RANGKA BAJA BRESING EKSENTRIS TIPE X DESIGN OF TAMANSISWA SARJANAWIYATA UNIVERSITY CENTER BUILDING USING TYPE X EXCENTRIC BRESSED STEEL FRAME STRUCTURE SYSTEM. Tugas Akhir thesis, University Technology Yogyakarta.

Widyaningrum, Adelia and Nurhidayatullah, Eka Faisal (2021) PERBANDINGAN DESAIN SISTEM RANGKA PEMIKUL MOMEN KHUSUS DENGAN SISTEM GANDA BRESING Studi Kasus : Gedung Kuliah Fakultas Teknik 3 Universitas Tidar COMPARISON OF SPECIAL MOMENT RESISTANCE FRAME SYSTEM DESIGN WITH DOUBLE BRESING SYSTEM Case Study : Lecture Building Faculty of Engineering 3 Tidar University. Tugas Akhir thesis, University Technology Yogyakarta.

Wijaya, Nanda Laputra and Ismaili, Abul Fida (2021) PERENCANAAN RUTE TERPENDEK ANGKUTAN ANTAR MODA DARI TERMINAL GIWANGAN MENUJU BANDARA YIA DENGAN ALGORITMA DIJKSTRA DAN BELLMAN-FORD PLANNING OF THE SHORTEST ROUTE OF INTERMODA TRANSPORT FROM GIWANGAN TERMINAL TO YIA AIRPORT WITH DIJKSTRA AND BELLMAN-FORD ALGORITHM. Tugas Akhir thesis, University Technology Yogyakarta.

Wijaya, Ruly Agata and Susilo, Dibyo (2021) ANALISIS KINERJA SIMPANG TAK BERSINYAL PERFORMANCE ANALYSIS OF UNSignalized Intersection. Tugas Akhir thesis, University Technology Yogyakarta.

Wiradinata, Rachmat and Ismaili, Abul Fida (2021) ANALISIS PERBANDINGAN DAYA DUKUNG PONDASI BORED PILE DENGAN TIANG PANCANG PADA ABUTMENT 1 JEMBATAN KALI SERAYU (Studi Kasus: Proyek Jembatan Kali Serayu Ruas Jalan Mandirancan-Pegalongan Kabupaten Banyumas) COMPARISON ANALYSIS OF THE BORED PILE FOUNDATION BEARING CAPACITY WITH THE PILE ON ABUTMENT 1 KALI SERAYU BRIDGE (Case Study: Kali Serayu Bridge Project for Mandirancan-Pegalongan Road, Banyumas Regency). Tugas Akhir thesis, University Technology Yogyakarta.

Wirawan, Anggy Aspri and Masagala, Algazt Aryad (2021) PENGARUH KUAT LENTUR BETON MELALUI PEMANFAATAN LIMBAH SERAT PATI ONGGOK SEBESAR 4%, 5%, 6% DAN FLY ASH SEBESAR 15% INFLUENCE OF FLEXIBLE STRENGTH OF CONCRETE THROUGH THE UTILIZATION OF 4%, 5%, 6% AND FLY ASH WASTE BY 4%, 5%, 6% AND FLY ASH. Tugas Akhir thesis, University Technology Yogyakarta.

Wulandari, Aditya Tri and Masagala, Algazt Aryad (2021) PENGARUH KUAT LENTUR BETON MELALUI PEMANFAATAN LIMBAH SERAT PATI ONGGOK SEBESAR 1%, 2%, 3% DAN FLY ASH SEBESAR 15% THE EFFECT OF THE FLEXIBILITY OF CONCRETE THROUGH THE UTILIZATION OF WASTE STARCH FIBER BY 1%, 2%, 3% AND FLY ASH OF 15%. Tugas Akhir thesis, University Technology Yogyakarta.

Wulandari, Nursih and Nuraini, Rika (2021) Evaluasi Tebal Lapis Perkerasan Jalan Menggunakan Perbandingan Metode Bina Marga 2017 dan Analisis Spektrum Gelombang Permukaan (Spectral Analysis Of Surface Wafes) Evaluation of the Thickness of Road Pavement Using the Comparison of the 2017 Highways Method and Spectral Analysis of Surface Wafes. Tugas Akhir thesis, University Technology Yogyakarta.

Yolan Dhika Pratama, Muhammad and Septi Hendrasari, Ratna (2021) ANALISIS PENINGKATAN KEBUTUHAN AIR BERSIH MASA PANDEMI COVID-19 Studi Kasus Kecamatan Depok Sleman ANALYSIS OF THE INCREASING NEED FOR CLEAN WATER during the COVID-19 pandemic A Case Study in Depok, Sleman District. Tugas Akhir thesis, University Technology Yogyakarta.

Yudanto, Ardian and Masagala, Algazt Aryad (2021) PENGARUH KUAT LENTUR BETON MELALUI PEMANFAATAN LIMBAH SERAT PATI ONGGOK SEBESAR 7%, 8%, 9% DAN FLY ASH SEBESAR 15% INFLUENCE OF FLEXIBLE STRENGTH OF CONCRETE THROUGH THE UTILIZATION OF 7%, 8%, 9% AND 15% FLY ASH WASTE. Tugas Akhir thesis, University Technology Yogyakarta.

Yudiono, Muhammad (2021) EVALUASI PELAYANAN TRANSPORTASI PUBLIK KERETA REL LISTRIK YOGYAKARTA-SOLO EVALUATION OF YOGYAKARTA-SOLO ELECTRIC RAIL PUBLIC TRANSPORTATION SERVICES. Tugas Akhir thesis, University Technology Yogyakarta.

Yuniar Wahid Dyah Azmi, Shella and Fida Ismaili, Abul (2021) ANALISA PERENCANAAN RUTE ANGKUTAN WISATA KABUPATEN KULON PROGO DENGAN METODE AHP (ANALYTICAL HIERARCHY PROCESS) ANALYSIS OF TOURIST TRANSPORT ROUTES PLANNING, KULON PROGO DISTRICT USING AHP (ANALYTICAL HIERARCHY PROCESS) METHOD. Tugas Akhir thesis, University of Technology Yogyakarta.

Yusuf Mahendra, Faizal and Budianto Kromodiryo, Johan (2021) PENGARUH PEMANFAATAN LIMBAH DAUN JATI SEBAGAI BAHAN TAMBAH PADA PAVING BLOCK DENGAN PERSENTASE 3%, 7,5%, DAN 12% PENGUJIAN KUAT TEKAN THE EFFECT OF THE UTILIZATION OF TEAK LEAVES AS ADDITIONAL MATERIAL TO PAVING BLOCK WITH A PERCENTAGE OF 3%, 7.5%, AND 12% PRESS TESTING. Tugas Akhir thesis, University of Technology Yogyakarta.

Zai, Ebenhaezer and Bhaskara, Adwitya (2021) ANALISIS KONSTRUKSI RAMPING PADA PERENCANAAN DESAIN BALOK Studi Kasus: Pembangunan Rumah Susun RIS Maduma ANALYSIS OF LEAN CONSTRUCTION ON BEAM DESIGN PLANNING Case Study: Construction of RIS Maduma Flats. Tugas Akhir thesis, University Technology Yogyakarta.

Zakiy, Fitriana Wulan and Kurniati, Dwi (2021) EVALUASI KERENTANAN BANGUNAN GEDUNG GALERIA TERHADAP GIMPA BUMI BERDASARKAN RAPID VISUAL SCREENING VULNERABILITY EVALUATION OF GALERIA BUILDING TO EARTHQUAKE BASED ON RAPID VISUAL SCREENING. Tugas Akhir thesis, University Technology Yogyakarta.

Zamaini, Jois and Saputro, Cahyo Dita (2021) PERENCANAAN PENJADWALAN PROYEK MENGGUNAKAN METODE PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) PADA PROYEK JEMBATAN PROJECT SCHEDULING PLANNING USING THE PERT (PROJECT EVALUATION AND REVIEW TECHNIQUE) METHOD ON THE BRIDGE PROJECT. Tugas Akhir thesis, University Technology Yogyakarta.

Zamroni, Lutfi and Setiawan, Danny (2021) ANALISIS IMPLEMENTASI PAJAK KENDARAAN BERMOTOR BERDASARKAN KILOMETER TEMPUH SEBAGAI STRATEGI TRANSPORT DEMAND MANAGEMENT Studi Kasus Kota Yogyakarta ANALYSIS OF MOTOR VEHICLE TAX IMPLEMENTATION BASED ON MILEAGE AS A DEMAND MANAGEMENT TRANSPORT STRATEGY Yogyakarta City Case Study. Tugas Akhir thesis, University of Technology Yogyakarta.

Zhafir Pesisir, Muhammad and Budianto, Johan (2021) EVALUASI KINERJA BANGUNAN GEDUNG TERHADAP GAYA GEMPA DENGAN METODE PUSHOVER ANALYSIS (STUDI KASUS: GEDUNG RUANG DOSEN UTY) EVALUATION OF BUILDING PERFORMANCE AGAINST EARTHQUAKE STYLES USING PUSHOVER ANALYSIS METHOD (CASE STUDY: UTY LECTURER'S ROOM BUILDING). Tugas Akhir thesis, University Technology Yogyakarta.

Zulfadli Siregar, Muhammad and Faisal Nurhidayatullah, Eka (2021) REDESAIN GEDUNG BERTINGKAT TINGGI DENGAN SISTEM STRUKTUR RANGKA BAJA PEMIKUL MOMEN KHUSUS Studi Kasus Gedung Parkir dan Gedung Pertemuan Pringgading Semarang REDESIGN OF HIGH-LEVEL BUILDING WITH SPECIAL MOMENT BORNING STEEL FRAME STRUCTURE SYSTEM Case Study of Parking Building and Pringgading Meeting Building Semarang. Tugas Akhir thesis, University of Technology Yogyakarta.

aldiansyah, Muhammad and Danny Setiawan, Danny Setiawan (2021) PENAMBHAN STYROFOAM DENGAN KADAR 4%, 6% DAN 8%, SEBAGAI BAHAN TAMBAH (HRS-WC) TERHADAP KARAKTERISTIK MARSHALL ADDITION OF 4%, 6% AND 8% STYROFOAM AS ADDITIONAL MATERIAL (HRS-WC) TO MARSHALL CHARACTERISTICS. Tugas Akhir thesis, University of Technology Yogyakarta.

miyanto, Kris and A. Masagala, Algazt (2021) SELF HEALING CONCRETE MENGGUNAKAN BAKTERI BACILLUS SP DAN SPOROSARCINA SP SEBAGAI SOLUSI BETON BERTULANG HEMAT BIAYA SELF HEALING CONCRETE USING BACILLUS SP AND SPOROSARCINA SP AS A SOLUTION FOR COST-EFFECTIVE REINFORCED CONCRETE. Tugas Akhir thesis, University of Technology Yogyakarta.

ramadhan, Muhammad Risqi and Bhaskara, Adwitya (2021) PERBANDINGAN PRODUKTIVITAS PENGECORAN STRUKTUR KOLOM BALOK DAN PELAT LANTAI MENGGUNAKAN CONCRETE PUMP DAN CONCRETE BUCKET COMPARISON OF PRODUCTIVITY OF CASTING STRUCTURES OF BEAMS AND FLOOR Slabs USING CONCRETE PUMP AND CONCRETE BUCKET. Tugas Akhir thesis, University Technology Yogyakarta.

sinaga, Jamenra Shah Putra and Nurhidayatullah, Eka Faisal (2021) REDESAIN STRUKTUR ATAS HOTEL SERELA SENTUL YOGYAKARTA MENGGUNAKAN KOSNTRUKSI BAJA STRUCTURAL REDESIGN OF THE SERELA SENTUL YOGYAKARTA HOTEL USING STEEL CONSTRUCTION. Tugas Akhir thesis, University Technology Yogyakarta.

This list was generated on Sun Dec 22 08:43:53 2024 WIB.